BUILDING PERMITS - RESIDENTIAL: 1,2,3 Family Homes ...



BUILDING PERMITS - RESIDENTIAL: 1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

|(1) Contractor Registration |$125 |

|(2) New Construction & Fire Restoration | |

|(a) Base Fee |$200 |

|(b) Plus a fee per 100 sq.ft. or fraction thereof |$6 |

|(c) Attached or detached Garage |$50 |

|(d) Accessory Building |$25 |

|(3) Additions, Alterations, Repairs | |

|(a) Base Fee |$60 |

|(b) Plus a fee per 100 sq.ft. or fraction thereof |$5 |

|(c) When no additional floor area is involved: | |

|(1) Base Fee |$50 |

|(2) Plus a fee per 100 sq.ft. or fraction thereof |$5 |

|(4) Demolition of Single, Two & Three Family Dwellings | |

|(a) Base Fee per unit |$75 |

|(b) Accessory Building |$25 |

|(5) Moving Structures Single, Two & Three Family | |

|(a) Base Fee |$300 |

|(b) Accessory Building |$50 |

|(6) Concrete / Asphalt | |

|(a) New or Replacement | |

|(1) Drive and Apron |$40 |

|(2) Patio, Sidewalk, Apron Only |$20 |

|(7) Miscellaneous Permits | |

|(a) Chimney |$30 |

|(b) Chimney Fireplace |$40 |

|(c) Covered Patio |$30 |

|(d) Deck |$30 |

|(e) Fence |$30 |

|(f) Garage |$50 |

|(g) Gazebo |$30 |

|(h) Miscellaneous Repair |$30 |

|(i) Porch |$30 |

|(j) Re-Roof |$30 |

|(k) Satellite dish / Antennas |$25 |

|(l) Siding |$30 |

|(m) Storage Shed |$25 |

|(n) Swimming Pool |$30 |

|(o) Window / Door |$30 |

|(p) Handicap Ramp |$0 |

|(q) Re-Occupancy Inspection Single Family Dwelling |$50 |

|(r) Re-Occupancy Inspection Condo/Townhouse |$25 |

|(8) Plan Review |$40 |

|(9) Re-Inspection (Building / Mechanical Systems) |$25 |

|When an inspection is requested and made, and this work is incomplete|

|or not in code compliance, a fee shall be charged for re-inspection |

|(10) Change in plans |50% of Orig. Permit |

|Major revisions submitted after building permits have been issued |

|shall result in a fee |

|(11) Beginning work without a permit |Double Fee |

ELECTRICAL PERMITS - RESIDENTIAL: 1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

|(1) Contractor Registration |$125 |

|(2) New Construction per unit |$150 |

|(3) Fire Restoration |$85 |

|(4) Additions, Alterations, Repairs | |

|(a) Up tp 400 sq.ft. |$50 |

|(b) Over 400 sq.ft. |$75 |

|(5) Garage, Shed, Accessory building |$25 |

|(6) Temporary / Permanent Service or Sub panel | |

|(a) Up to 100 amps |$30 |

|(b) 101-200 amps |$40 |

|(c) Over 200 amps |$50 |

|(7) GFCI outlets, Swimming Pool wiring, Hot Tubs, etc |$25 |

|(8) For the purpose of calculating permit fees, square |

|footage shall be rounded off to the next highest 100 |

|sq.ft. |

|(9) Re-Inspection (Building / Mechanical Systems |$25 |

|When an inspection is requested and made, and this work is incomplete|

|or not in code compliance, a fee shall be charged for re-inspection |

|(10) Beginning work without a permit |Double Fee |

PLUMBING PERMITS - RESIDENTIAL: 1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

|(1) Contractor Registration |$125 |

|(2) New Construction – Sewer permit & Connection | |

|(a) Drain Tile / Pipe (0-200 feet) |$50 |

|(b) Each additional 100 feet or fraction thereof |$20 |

|(3) New Construction |$150 |

|(4) Additions, Alterations, Repairs | |

|(a) Each plumbing fixture (waste, vent) |$15 |

|(b) Water System |$10 |

|(c) Gas System |$10 |

|(9) Re-Inspection |$25 |

|When an inspection is requested and made, and this work is incomplete|

|or not in code compliance, a fee shall be charged for re-inspection |

|(10) Change in plans |50% of Orig. Permit |

|Major revisions submitted after building permits have been issued |

|shall result in a fee |

|(11) Beginning work without a permit |Double Fee |

HVAC & REFRIDGERATION PERMITS - RESIDENTIAL: 1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

|(1) Contractor Registration |$125 |

|(2) New Construction | |

|(a) Central Heating System, Each |$100 |

|(b) Air Conditioning System, Each |$50 |

|(c) Supplemental System, Each |$40 |

|(3) Additions, Alterations, Repairs | |

|(a) Central Heating System, Each |$60 |

|(b) Air Conditioning System, Each |$25 |

|(c) Supplemental System, Each |$25 |

|(4) Re-Inspection |$25 |

|When an inspection is requested and made, and this work is incomplete|

|or not in code compliance, a fee shall be charged for re-inspection |

|(5) Change in plans |50% of Orig. Permit |

|Major revisions submitted after building permits have been issued |

|shall result in a fee |

|(6) Beginning work without a permit |Double Fee |

-----------------------

Thomas J. Coyne Mayor

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download