Veterans Affairs



5. PROJECT NO. (if applicable)CODE7. ADMINISTERED BY2. AMENDMENT/MODIFICATION NO.CODE6. ISSUED BY8. NAME AND ADDRESS OF CONTRACTOR4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE9A. AMENDMENT OF SOLICITATION NO.9B. DATEDPAGEOF PAGES10A. MODIFICATION OF CONTRACT/ORDER NO.10B. DATEDBPA NO.1. CONTRACT ID CODEFACILITY CODECODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersE. IMPORTANT:is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAYis not extended.12. ACCOUNTING AND APPROPRIATION DATA(REV. 10-83)is required to sign this document and return ___________ copies to the issuing office.is not,A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.15C. DATE SIGNEDB. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:D. OTHERBYContractor16C. DATE SIGNED14. DESCRIPTION OF AMENDMENT/MODIFICATION16B. UNITED STATES OF AMERICAExcept as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.15A. NAME AND TITLE OF SIGNER16A. NAME AND TITLE OF CONTRACTING OFFICER15B. CONTRACTOR/OFFERORSTANDARD FORM 30 NSN 7540-01-152-8070PREVIOUS EDITION NOT USABLEPrescribed by GSA - FAR (48 CFR) 53.243(Type or print)(Type or print)(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)(No., street, county, State and ZIP Code)(If other than Item 6)(Specify type of modification and authority)(such as changes in paying office, appropriation date, etc.)(If required)(SEE ITEM 11)(SEE ITEM 13)(X)CHECKONE13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONSAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT(Signature of person authorized to sign)(Signature of Contracting Officer)13A00001674-14-030Department of Veterans AffairsVISN17 Network Contracting ActivityCentral Texas Veterans HCS2002 Scott Blvd.Temple TX 76504Department of Veterans AffairsVISN17 Network Contracting ActivityCentral Texas Veterans HCS2002 Scott Blvd.Temple TX 76504To all Offerors/Bidders VA257-16-B-1136 XX1The purpose of this amendment is to: 1. Replace the original SOW 2. The attached “Revised SOW” hereby replaces the original SOW issued as part of the solicitation. Joyce MillsContracting OfficerScope of Work (Rev#1)674-14-030Install Generator Docking Station Visit site prior to bid in order to be fully acquainted with existing site conditions and scope of work. It is contractor responsibility to field verify all existing devices, cables, equipment, measurements, equipment room and areas provided in scope of work. Provide all labor, equipment, materials, tools, and supervision to installation of generator docking stations (total 2) at Building 221-CLC. Verify all cables and generator location before bid this project. Also, this project includes installation of 400A, 480V automatic transfer switch, an automatic transfer switch and installation of Government provided 112.5kva transformer.Installation of the docking station, electrical equipment, cables, 4” rigid conduit, and junction box shall be in according with NFPA 70, 70E and VA specifications.Building 221 – Two 2000A Docking Stations Each emergency generator is 500KW generator, 208V, 3 Phase and has 6 set, 3-400mcm, 400mcm N, 3/0 G, 3” conduit (contractor field verify).Identify the phase rotation and each generator cable connections at Bldg. 221.Provide and install two (2) 2,000A NEAM-#R outdoor switchboard with 2,000A breaker and double lugs (2 – 6 set 500mcm) at button and 1 - 1set 500mcm at top side of breaker including ground lugs and 14 neutral lugsProvide and install 6 set, 3-400mcm, 400mcm N, 3/0 G, 3” ridge galvanized conduits and couplings from generator AB to generator docking station approximately 25ftAB Generator docking station will be on 12” concrete pad with 2 yellow painted concrete bollards outside mechanical yard. Provide and install outdoor junction box at generator AB according with conduits and NFPA 70 Provide and install 6 set, 3-400mcm, 400mcm N, 3/0 G, 3” ridge galvanized conduits and couplings from generator CD to generator docking station approximately 50ft.AB Generator docking station will be on 6” concrete pad inside the mechanical yard.Provide and install outdoor prime and paint junction box at generator CD according with conduits and NFPA 70Provide and install UL Listed cold shrink cable termination with compression butt splice at existing generator cable extension.Connect each generator docking station cablesTest the each generator phasing and breaker (Schedule with COR).Provide and install A 400A, 480V, 3 phase Automatic Transfer Switch at Building 163 Provide and install 400A automatic transfer switch with power meter (V, I, PF, W, KVA)Connect generator start signal wire Connect existing cable to Automatic Transfer Switch (load feeder and normal power feeder) (weekend connections)Test, program, verify and certify the new ATS by manufacture techInstall 112.5kva transformer and disconnects per NFPA and infection control requirementInstall government provided 112.5kva, 480V/208V transformer with 12” concrete pad at Basement 163. Install wire and EMT conduit for primary and secondary from room BB108 to BB115 approximately 100ft.Follow the infection control requirement and above ceiling permit requirement.Provide UL Listed red fire rated caulking at all wall penetrations Check the phase rotation before and after connection at old transformer and new transformer power. Install and connect primary cables (1/0) and secondary cables (500mcm)Install NEMA -1, 150A fuse disconnect at 480V transformer.Remove existing 112.5kva transformer and power meter from room BB108 (Saturday schedule outage and completed by same day)Test and verify primary and secondary voltage and phase rotationDisconnect and rearrange the feeder cable at panel in the room during room. Provide and supply a new Metro Tech VM-850 utility locator (VM-850 Receiver/Transmitter with Rechargeable Battery, Battery Charger, Connection Leads, Ground Stake, Manual, Hard Carry Case and cable clamps) to Government to use in projects. The utility locator will be belonged to the Government. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download