A. PROJECT INFORMATI ON 1. APPLICATION IS: 2. STAFF REVIEW ...
CITY OF PITTSBURGH DEPARTMENT OF CITY PLANNING
ZONING & DEVELOPMENT REVIEW ZBA REQUESTS SUPPLEMENT
Posse# DCP-ZDR-2021-07577
A. PROJECT INFORMATION
1. APPLICATION IS: Development Project
Protest Appeal
2. STAFF REVIEW DATE:
3. SITE INFORMATION
Development Address: 2032 Murray Ave
Parcel ID(s)/Lot-and-Block Number(s): 86-R-105
Project Description: Expansion of an existing restaurant (2032 Murray Avenue) into an adjacent commercial space, formerly and most recently a bookstore (2030 Murray Avenue). Minor interior alterations.
3. CONTACT INFORMATION
Applicant Name: Steven Hawkins
Applicant Contact (phone and email): 412-720-9249
B. ZBA HEARING INFORMATION
Zone Case #C183. of 2021
Date of Hearing: Click here to enter a date.
Time of Hearing: Click here to enter text.
Zoning Designation: RM-M, LNC Neighborhood: Squirrel Hill South
Zoning Specialist: CS
C. ZBA REQUESTS
Type of Request: Variance
Code Section:
Description: Special Exception for Restaurant General in the LNC (911.02) Variance from 914.02.A - 4 parking stalls required, 0 provided
Type of Request: Variance Description:
Code Section:
ZBA Supplement Page 1 of 1
Pittsburgh Department of City Planning ? 200 Ross Street, Pittsburgh, PA 15219 ? dcp/
7'-043"
12'-11"
Susp. Acoust. Panel Ceiling, Typ., from Front to Existing
Kitchen Partition New Opening New Stair
New Opening Location T.B.D.
1041"
3'-9" 7'-0"+/-
Susp. Ceiling Header Detail to be Provided After Demolition Confirmed. Likely will be One 3 21" x 3 21" x 156" Angle per 4" of Masonry Width.
Entry Landing at Front Door
Stair and Landing at Entry
1 SCHEMATIC BUILDING SECTION A2 scale: 1/4" =1'-0"
36" Min.
New Mirror Bottom of
Mirror Surface
Top of Rim
121" Min. 18" Min.
Hard Surface Wall Finish, F.R.P.
3'-6"Max. 39-41"
2' Min.
3'-6" Min. 12" Max.
4'-0" 33-36" 39-41"
29" Min. 34" A.F.F.
40" Max.
33-36"
1'-6" Min.
17"-19" top of Seat
A
3
A2
B
NOTE: PROVIDE BLOCKING IN WALLS FOR MOUNTING OF GRAB BARS
TOILET ROOM ELEVATIONS
scale: 3/8" =1'-0"
Dispenser Location
1' 9'-1121"
10'-421"
6'-4"
1'-621"
1'-5"
Crawl Space Access
CRAWL SPACE
OFFICE
1 A2
Furred Gyp. Wb.
STORAGE
NO WORK PROPOSED IN BASEMENT OF 2030
New
3 0
Wood
Door
in
Exist. Opening,
Lockable from Stair
Side
3/0
Gl. Block
UP 14R
2-24" WH
CLOSET
Water
Furn.
3/0
Meter
3'-6"+/-
New Opening, Exact Location T.B.D.
Furred Gyp. Wb. Face of CMU
CRAWL SPACE (Assumed)
7'-0 34" Flr. to Flr.
Drywall Ceiling (Assume 58" Type X, Taped and Spackled
STORAGE, COOLERS, SUPPLIES
UP 11R@10"+/-
Stair Partition Above
Face of CMU
UP 11R@10"+/-
To 2032
To 2032 Bsmt.
1 A2
2 BASEMENT FLOOR PLAN A2 scale: 1/4" =1'-0"
5509 Kamin Street Pittsburgh, Pennsylvania 15217 412-720-9249 sgharcht@
2030 MURRAY
Sprinkler System Equipt. Under Stair
Landing
2032 MURRAY
SQUIRREL HILL CITY OF PITTSBURGH
Sprinkler Water Service from Street
TENANT: "AFRICAN CUISINE"
BASEMENT FLOOR PLAN SCHEMATIC BUILDING SECTION ENLARGED TOILET ROOM PLAN AND ELEVATIONS
CLG. HT. 10'-4 34"
30x48 Clr. Clr. Flr.
Flr. Space Space at
at Sink
Door
Clr. Flr. Space at Door
3/0
3 A A2
B
6'-10 14"
4'
30x48 Clr. Flr. Space Outside Door Swing 60" Dia. Clr. Flr. Space at WC 60"x 60" Clr. Flr. Space
4 TOILET ROOM PLAN
A2
scale: 3/8" =1'-0"
1' 4'-9"
683" 3' 3'-6"
Partial Ht. Wall 1 21" ? Pipe Rail
Verify in Field,
11"
(7" Max.)
5 STAIR ELEVATION
A2
scale: 3/8" =1'-0"
C 2021
STEVEN G. HAWKINS / ARCHITECTS THIS DRAWING IS AN INSTRUMENT OF SERVICE AND IS THE PROPERTY OF THE ARCHITECT. REPRODUCTION FOR ANY PURPOSE IS PROHIBITED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE ARCHITECT
NO. ISSUED/REVISION DATE
PRINTED:
DATE:
6.10.21
PROJECT NO.
21.05
SHEET NO.
EMERGENCY LTG. / EXIT SIGN, BATTERY UNIT
REMOTE HEAD
EMERGENCY LTG., BATTERY UNIT
EXISTING ACCESSIBLE
FE PORTABLE FIRE EXTINGUISHER
UNISEX TOILET ROOM
A
NOTES:
1. All Emergency Lighting Fixtures and Exit Signs are Existing unless noted as New.
1 A2
4 A2
EXITS TO REAR YARD 3/4 DN (3)5.3"R
1'-6"
3/0
CLG. HT. 10'-4 34"
EXISTING RELOCATED
3'-6"
Clr. Fl. Space at door
2-2X8 Blkhd. Above
5'
2/8
Clr. Fl. Space at door
SEATING
8' H New Partition
A
SEATING
3'-5"
2'-9"
DN (1)8"R
HALL
DN (1)7"R
PRIVATE DINING AND
MEETING ROOM
MEN WOMEN
KITCHEN
New Service
Sink (Final
Location
T.B.D.)
A
3' CLEAR
NEW
Accessible Seating 30" x 48"
BAR SEATING
BAR
2'-6" BAR SEATING @ 30"AFF
RAMP UP 12" Half Wall
SEATING or WAITING UP
2R
SEATING
+1'-0"
HOST
RECEPTION
Half Wall
WAITING
0'-0"
3/0
ENTRY
NEW
DN 14R
3'-5"
3'-421"
STAIR
For Use by Employees Only
2030 MURRAY
3'-7" 3'
8' H New Partition NEW
EXPANDED KITCHEN
Half Wall
Wd.
Frame Wd. Frame Stair
Landing UP
5
Const. 7 RISERS
A2
443" 3'-2"
3'-3"
5'-6"
434"
CLG. HT. 12'-11"
1'-2" 3'
SEATING
UP 2R
Divider +0'-1 1/4""
SEATING
SEATING
NEW
Divider
2032 MURRAY
DN TO BASEMENT
3'-1"
DN TO BASEMENT
-0'-6 34"
RAMP DN
+0'-0" 3/0
1 FIRST FLOOR PLAN A1 scale: 1/4" =1'-0"
ACCESSIBLE UNISEX TOILET ROOM
ACCESSIBLE ROUTE
3'-6"
EXIT ACCESS TRAVEL DISTANCE = 77' MAX.
3' CLEAR
ACCESSIBLE ROUTE
2'-6" BAR SEATING @ 30"AFF
3'-5"
3'
EXIT ACCESS TRAVEL DISTANCE = 79' MAX.
2'-9"
3'-1"
TRAVEL DISTANCE PLAN 1 ACCESSIBLE ROUTE PLAN
A1 scale: 1/8" =1'-0"
3'
A ALL DEMISING WALLS INCLUDE 12" CONC.
MASONRY UNITS IN THEIR CONSTRUCTION (2 HR. FIRE RATING)
1 A2
EXISTING PARTITION
EXISTING PARTITION TO BE REMOVED NEW PARTITION
3'-5"
3'-412"
BUILDING INFORMATION
CODE USED: International Building Code, 2015 Edition International Existing Building Code, 2015 Edition, Alterations- Level 2.
OCCUPANCY GROUP: A2 Assembly (Restaurant)
TYPE OF CONSTRUCTION: IIIB
HEIGHT ABOVE GRADE: One Story, Approx. 17 Feet
ALLOWABLE BUILDING HEIGHT (IBC 2015 Table 504.3 and 504.4): Three Stories, 55' Allowed (Existing Complies)
BUILDING AREA: Tenant Area 2030 Main Floor: 1164 GSF 2030 Basement: 621 GSF 2032 Main Floor: 1745 GSF 2032 Basement: 912 GSF Total: 4442 GSF
ALLOWABLE BUILDING AREA (IBC 2015 Table 506.2): 19,000 SF (Existing Complies)
OCCUPANCY SEPARATION (IBC 2015 Table 508.4): 1 Hr. Required Between B Business Occupancies and A2 Assembly. (Existing Demising Walls: Masonry - 2 Hour Min.)
OCCUPANT LOAD: Seating: 558sf@15net sf/occ = 37occ. Private Dining Rm.: 158 sf@15net sf/occ. = 11occ. Bar: 74sf@100net sf/occ. = 1 occ. Host: 11sf@100net sf/occ. = 1 occ. Kitchen: 382sf@200gross sf/occ. = 4occ. Office: 132sf@100gross sf/occ. = 2 occ. Storage: 1370 sf@300gross sf/occ. = 5occ. TOTAL: 61occ.
MEANS OF EGRESS: Per IBC 2015 Sections 1004 - 1028 Two Means of Egress Provided for each address Exit Access Travel Distance: 96 Ft. (2032) Maximum, Complies with Table 1017.2 All Means of Egress Pathways are a Minimum of 36". Means of Egress Capacity: Stairs from Basement: 7occ. x 0.3" per occ. = 3" required Other components: 54 occ. x 0.2" per occ. = 11" required. (Minimum Egress Width Provided).
AUTOMATIC SPRINKLER SYSTEM: Existing System Provided in Basement. Per IEBC Section 804.2.2, a sprinkler system is not required because the work area would not be required to have a system under the IBC for new construction. (Fire area less than 5000sf, occupant load of fire area less than 100, fire area located at level of exit discharge.)
FIRE ALARM & DETECTION SYSTEM: None Required. Per IEBC Section 804.4, a fire alarm system is not required in a Group A2 occupancy, a system would not be required by the IBC for new construction. (Occupancy less than 300.)
MEANS OF EGRESS (Emergency) LIGHTING: Required and Provided (IBC 2015 Section 1008)
EXIT SIGNAGE: Required and Provided (IBC 2015 Section 1013)
ENERGY CONSERVATION: No Changes to Building Shell are Proposed.
ACCESSIBILITY: Accessible route throughout the space provided. One accessible male/female toilet facility provided.
PLUMBING FIXTURES REQUIRED: (Provide for 30 Male / 30 Female)
Male Water Closets: 2 - 1 water closet, 1 urinal Female Water Closets: 2 (4 Water Closets and 1 Urinal Existing.)
Lavs: 1 each, Male and Female (4 Lavs Existing)
Service Sink: 1 (1 Service Sink To Be Provided)
5509 Kamin Street Pittsburgh, Pennsylvania 15217 412-720-9249 sgharcht@
SQUIRREL HILL CITY OF PITTSBURGH
TENANT: "AFRICAN CUISINE" FIRST FLOOR PLAN BUILDING INFORMATION
C 2021
STEVEN G. HAWKINS / ARCHITECTS THIS DRAWING IS AN INSTRUMENT OF SERVICE AND IS THE PROPERTY OF THE ARCHITECT. REPRODUCTION FOR ANY PURPOSE IS PROHIBITED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE ARCHITECT
NO. ISSUED/REVISION DATE
PRINTED:
DATE:
6.10.21
PROJECT NO.
21.05
SHEET NO.
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- la roche college october 6 2017 courier vol 28 issue 7
- thenew people
- january april june 6 7 2 14 9 13 21 16 23
- the new people
- a project informati on 1 application is 2 staff review
- chatham family friends weekend 2021
- magdalen chapel a history la roche university
- you re invited evening of hope fundraiser p
- social media presence where we advertise and list events
- a b c d e f g h i 1 2 3 4
Related searches
- you and your classmate are asssigned a project on which you will recieve one
- who is a project manager
- what is a project manager
- what is 2 1 channel soundbar
- is 2 liters of oxygen a lot
- what is a project specialist
- what is a project statement
- is 2 22 a rational number
- 1 sqrt x 2 a 2
- project topics on project management
- what is a project pmbok
- what is a project management