Browardschools



[pic]

-----------------------

Project Management submits Application for CO

(Building Dept Form 100)

Application for CO signed by SBBC PM, Architect and GC

Application for CO

Evaluated by Bldg Dept

Copy of Appl. for CO given to SBBC PM and GC

The Occupancy Verification is completed by the Bldg Dept inspection team

(Building Dept Form 105)

Two possible options exist at this point

Option 1: Facility is accepted, OEF 110B is signed and facility is occupied

Option 2: Application is rejected, Application is returned to the SBBC PM with a Denial of Occupancy issued (Bldg Dept form 105). A re-inspection of a portion of the facility may be necessary

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Related searches