SFPD 4.08 Form - School Facility (CA Dept of Education)



SFPD 4.08 – Rev. July 2010

PLAN SUBMISSION REQUIREMENTS FOR MODERNIZATION PROJECTS

Local Educational Agencies (LEA) requesting modernization funds from the State Allocation Board (SAB) must have the plans reviewed and approved by the California Department of Education (CDE) (Education Code Section 17070.50) prior to submitting a funding request.

Preliminary and Final Plan Submission Checklists – The checklists included in this packet identifying the items needed for preliminary plan and final plan submittal must be completed and submitted with the plans.

After preliminary plan review, if CDE did not require any changes and the LEA did not revise the plans from the preliminary plan submission, the LEA need not submit a second SFPD 4.08C form or a second set of plans. Indicate in a cover letter that no changes were made to the plans or the educational specifications, and submit an updated SFPD 4.08A, Project Information for Modernization and SFPD 4.08B, Local Educational Agency Certifications for Modernization.

CDE Resources and Contact Information - The required forms and instructions necessary for submitting modernization plans to CDE are located in this packet.

For more information on the plan review process, visit the SFPD Web page at or call 916-322-2470.

California Code of Regulations, Title 5 (Title 5) can be obtained on the Internet at .

Submit plans and the required documents to the following address:

California Department of Education

School Facilities Planning Division

1430 N Street, Suite 1201

Sacramento, CA 95814

SFPD 4.08 Modernization Preliminary Plan Checklist

LEA to check boxes indicating the items included in the plan submittal. Submit checklist with plans.

CDE may recommend or require changes; therefore, the submission of preliminary plans is required before submission of final plans. It is not necessary to submit construction specifications.

Do not include drawings, calculations, or plans for buildings not included in the modernization project.

Preliminary Plans

1. SFPD 4.08A, Project Information for Modernization, including the project tracking number (PTN). The PTN is a unique identifier that links application data used by the SFPD, the Division of the State Architect (DSA), and the Office of Public School Construction (OPSC). Plans without a PTN will not be approved by the SFPD. A PTN may be obtained from the OPSC Web site at or the SFPD Web site.

2. Preliminary (Schematic) Plans

Half-size plans and matching 11" x 17" plan set. Information on half-size plans must be legible and plans must be able to be scaled; otherwise full-size plans must be submitted.

Site plan must have street designations and labeled student, staff and visitor parking areas, as well as bus and parent drop-off areas.

Floor plans with dimensions and spaces labeled.

Dimensions and area calculations.

Interiors or schedules if applicable and available.

Elevations, if applicable and available.

Demolition plan, if applicable. Identify the location, type and use of buildings being removed.

3. Plan Summary Form(s) – Modernization (All that apply. Some projects may include both the modernization of existing buildings and the demolition and rebuilding of buildings.)

The project includes modernization of existing building area. Complete 4.08C Part 1 Plan Summary-Modernization for that portion of the project.

The project includes demolition and rebuilding of 50 percent or more of the existing square footage. Complete Plan Summary Form - New Construction. The form is available at . See Plan Summary form for greater detail.

The project includes demolition and rebuilding, and the area to be replaced is less than 50 percent of the existing square footage. Complete the Plan Summary Form – Addition for that portion of the project. The form is available at . See Plan Summary form for greater detail.

4. Form 4.08C Part 2 – Space Conversions: Complete only for spaces that will be altered in size or

purpose.

SFPD 4.08 Modernization Final Plan Checklist

After preliminary plan review, if CDE did not require any changes and the LEA did not revise the plans from the preliminary plan submission, the LEA need not submit a second SFPD 4.08C form or a second set of plans. Indicate in a cover letter that no changes were made to the plans or the educational specifications, and submit an updated SFPD 4.08A, Project Information for Modernization and SFPD 4.08B, Local Educational Agency Certifications for Modernization.

Do not include drawings, calculations, or plans for buildings not included in the modernization project.

1. SFPD 4.08A, Project Information for Modernization (updated), including the PTN and the construction cost estimate that the LEA will submit to the OPSC.

2. SFPD 4.08B, Local Educational Agency Certifications for Modernization.

3. Plan Summary Form(s) - Modernization – Provide updated 4.08C Part 1 Plan Summary – Modernization, and/or Plan Summary – New Construction, and/or Plan Summary – Addition as applicable. If unchanged since preliminary review, note that no changes have been made to the educational specifications since the preliminary plan submission.

4. Form 4.08C Part 2 – Space Conversions: Complete only for spaces that will be altered in size or purpose.

5. Final plans

Half-size plans and matching 11" x 17" plan set. Information on half-size plans must be legible and plans must be able to be scaled; otherwise full-size plans must be submitted. If revisions are limited to a few pages, submit only those pages and note in cover letter that no other pages were revised.

Written response to any questions and/or comments in CDE’s Preliminary Plan Review letter.

Site plan must have street designations and labeled student, staff, and visitor parking areas, as well as bus and parent drop-off areas.

Floor plans with dimensions and spaces labeled.

Dimensions and area calculations.

Interiors or schedules if applicable.

Elevations if applicable.

Demolition plan, if applicable. Identify the location, type, and use of buildings being removed.

SFPD 4.08A

Contact and Project Information

| |Local Educational Agency (LEA) Information |

|Project |  |

|Tracking # | |

|LEA |      |

|School Name |      |

|Street and Closest |      |

|Cross Street | |

| |LEA Contact (Please Print) |

|LEA Representative |      |

|Contact for | |

|Title |      |

|Phone |      |Fax       |

|Mailing Address |      |

|E-mail |      |

|χSignature | |

| |The governing board of the LEA has authorized me to submit this application and to request exemptions pursuant to Title 5, Section |

| |14030 (r). |

| | |

| |LEA Contact for questions, if different from above (Please Print) |

|Name |      |

|Title |      |

|Phone |      |Fax       |

|E-Mail |      |

| |Architect Contact (Please Print) |

|Contact Name |      |

|Firm Name |      |

|Mailing Address |      |

|Phone |      |Fax       |

|E-mail |      |

SFPD 4.08A

|Project Information |

|Plans are submitted for Preliminary Review Final Approval |

|Grade Levels |      |Grades in Class Size Reduction |      |

|Beginning classroom count |      |Project Capacity (this project) |      |

|(this project)* | | | |

| | | | |

|Ending classroom count |      |Total Project Area - this project |      |

|(this project)** | |(square feet) | |

|Are there related new construction or |      |

|modernization projects? Explain. | |

| |

|*Existing site: Before demolition, space conversions or removal of classrooms (if applicable) |

|**The total number of classrooms at the end of this project |

| |

|Site Area |

|School Site Acres – Gross       |Joint-Use Acres – Gross       |

|School Site Acres – Net       |Joint Use Acres – Net       |

|School Site Acres Net plus Joint use Acres Net       |

| |

| |

| |

|Construction Cost Estimate |

| | |

|Construction Cost Estimate | |

|as reported to DSA - This figure multiplied by 0.0007 to determine the | |

|CDE plan review fee. (Education Code Section 17251(a)) | |

| |$      |

SFPD 4.08B

Local Educational Agency Certifications for Modernization

(For final plans only)

|County |Project Tracking Number |

|      |  |

|      |      |

1. Existing School Safety Certification - An LEA modernizing an existing school site must certify that it has reviewed the following California Code of Regulations, Title 5 standards for this school modernization project and that the project will not create any new significant safety hazards or exacerbate any existing safety hazards to students.

Check each box to indicate compliance.

California Code of Regulations, Title 5, Section 14010:

(c) Powerlines/Electromagnetic fields

(d) Within 1,500 feet of a railroad

(e) Traffic noise

(f) Active fault or fault trace

(g) Flood or dam inundation area

(h) Near an above ground water or fuel storage tank or within 1,500 feet of a pipeline, which can pose a safety hazard

(i) Liquefaction/landslides

(l) Traffic/pedestrian safety

(m) Compatible existing and proposed surrounding land uses

(q) Exposure to adverse light, wind, and air pollution

(r) Easements restricting access or building placement

(t) Within 2,000 feet of a significant disposal of hazardous waste

2. California Environmental Quality Act (CEQA) Compliance

Per Public Resources Code sections 21000 et seq.; and CEQA Guidelines sections 15000 et seq.

(Check one and fill in dates as applicable.)

The LEA certifies that it has completed for this project all actions required pursuant to CEQA and determined this project to be:

A. Not a project for purposes of CEQA and that no CEQA action is required; or

B. Completely exempt from preparation of CEQA documents either by (please check as appropriate) ___statutory, ___categorical, or ___general rule exemption; or

C. Fully covered in a Negative Declaration/Initial Study adopted by the LEA; or

D. Fully covered in a Final Environmental Impact Report (EIR) adopted and certified by the LEA; or

E. Fully covered within another lead agency’s adopted CEQA document, and if necessary, the LEA has adopted a finding of no new impact.

If applicable:

Date the Final Environmental Impact Report or Negative Declaration was adopted:      

Date the project was approved by the LEA governing board:      

Date the Notice of Exemption or Notice of Determination was filed with the County Clerk:      

SFPD 4.08B

3. CDE Recommended Acres and Additional SAB Funding

The SAB requires information on the CDE recommended acres for a project. This information is used to determine if the project is eligible for specified additional funding. The CDE collects the following information for all projects regardless if the LEA intends to apply for the additional funding. See SAB Regulation Section 1859.83(d).

Physical Education Facilities

For middle schools, does the educational program require football and track facilities? Yes No

For high schools, does the educational program require:

1) Swimming pool? Yes No

2) Diving pool? Yes No

3) Baseball field, including bleachers and dugouts? Yes No

4) Football field and track, including a stadium? Yes No

LEA Completion

|Grades |Kinder. |

|CDE Verification of CBEDS | | |

SFPD 4.08B

I certify, as the local educational agency representative:

1. The information reported on this form is true and correct and that the above named local educational agency has reviewed the California Code of Regulations, Title 5 standards, cited in Section 1 herein, for this school construction/replacement project and has determined that the project will not create any new significant safety hazards or exacerbate any existing safety hazards to students;

2. Pursuant to Education Code Section 17077.10 every permanent or portable classroom in this project will be provided a telephone that is a hard-wired or wireless connection to a public-switched telephone network, and

3 If a different and/or additional California Environmental Quality Act (CEQA) document (e.g., negative declaration, environmental impact report, or supplement) is adopted for this project subsequent to this certification, the local educational agency shall notify immediately the School Facility Planning Division and the Office of Public School Construction.

|      | |      |

|Name of Authorized Local Educational Agency Representative | |Title |

| | |      |

|Signature of Authorized Local Educational Agency Representative | |Date |

SFPD 4.08C, PART ONE

Plan Summary - Modernization

(Submit with preliminary and final modernization plans)

|County |Project Tracking Number |

|      |  |

|      |      |

|Summary of how the project supports the LEA’s educational program: |

|      |

|Description of the scope of work in the following areas: |

| |A. Technology ( Centralized Technology Laboratory Dispersed Technology Both None) |

| |      |

| |B. Science (indicate if the project includes science laboratories and if caustic and/or corrosive materials will be used) |

| |      |

| |C. Heating, Ventilation, Air Conditioning |

| |      |

| |D. Plumbing |

| |      |

SFPD 4.08C, PART ONE

| |E. Lighting, Ceilings, Electrical |

| |      |

| |F. Floors, Doors, Walls, Windows |

| |      |

| |G. Cabinetry |

| |      |

| |H. Accessibility |

| |      |

| |I. Other |

| |      |

SFPD 4.08C, PART TWO

Space Conversions (Complete only for spaces that will be altered in size or purpose)

|County |Project Tracking Number |

|      |  |

|      |      |

Some modernization projects may include a change in the purpose and/or size of a particular space to provide for an environment suitable to the current and future educational program. If a space is altered significantly, complete this form. Removing a wall to create one large classroom out of two current classrooms would be significant. However, removing a stall in a restroom to make it handicapped accessible would be insignificant and not required on this form.

NOTE: Do not complete this section if teaching stations and support spaces are not being altered in size or purpose.

Column A Building Identification: Indicate the building identification by letter, number, or name.

Column B Type of Space and Educational Program: Label the type of space provided in each building under the column labeled "current”. Indicate under the column labeled "planned" the type of space after modernization.

Column C Square Feet Per Space and Number of Spaces: Provide the current number of square feet per type of space to be converted and the number of spaces under the two columns under "current." Provide the square feet for the newly planned space and number of spaces under the "planned" column.

|For example: |Current |Planned |

| |Square Feet |No. of Spaces |Square Feet |No. of Spaces |

| |780 |2 |1,560 |1 |

Column D Purposes: Provide a brief explanation of the educational purpose for the conversion. Example: A metal shop is converted to a simulation technology laboratory to provide students with exposure to various skills in operating robotics equipment and related computer programming.

|A |B |C |D |

|Building Identification |Type of Space and |Square Feet per Space and |Purposes |

| |Educational Program |Number of Spaces | |

| |Current |Planned |Current |Planned | | | |

|      |      |      |      |      |      |      |      |

|      |      |      |      |      |      |      |      |

|      |      |      |      |      |      |      |      |

|      |      |      |      |      |      |      |      |

Attach additional sheets if necessary

-----------------------

CALIFORNIA DEPARTMENT OF EDUCATION

SCHOOL FACILITIES PLANNING DIVISION

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download