Rate Schedule for Construction & Repair Works - All First Half 2021 - Southern Province
Demolisher
Item Code
Description
Unil Rate -LKR
Dm-01
Demolishing brickwork in cement stacking brick and clearing
debris away from site
m3
Dm-02 Dm-03
Demolishingbrickwork in lime stacking brick and clearing debris
away from sit"e
m3
Demolishing cabook masonry in lime mortar stacking cabook
and clearing debris away from site
m3
Dm-04
Demolishing existing building walls above DPC level by machine
& Clearing debris transport 01 Km away from site
m-I
Dm-04a
Demolishing existing wall foundation upto DPC level by machine
& Clearing debris transport 01 Km away from site
m3
Dm-05
Removing existing Ceiling, stacking materials and clearing
debris - away from site !" floor
m2
Dm-05a
Removing existing Ceiling, stacking materials and clearing
debris - 1st floor
m2
Dm-06
Demolishing Cement concrete L5Omm thick and clearing debris
in floors away from site
m3
Dm-07
Demolishing reinforced cement concrete in suspended floors ,
removing reinforcement and clearing debri away from site
m3
L,350.00 1,750.00 1,550.00
924.00 l-,255.00
198.00 203.00 7,194.00 12,590.00
Dm-08
Removing and stacking corrugated sheets, asbestos or
aluminium from roof
m2
Dm-09
Removing and stacking corrugated sheets, iron asbestos or
aluminium alloy from roofs or walls of two storied buildings
m2
Dm-10
Removing and stacking Door or Window, from existing walls
m2
Dm-11
Removing and stacking Door or Window sash from existing
frame
m2
Dm-12
Removing and stacking PVC Down pipes, old or decayed, from
existing building
m
Dm-13
Demolishing drains and clearing debris away from site
m
Dm-14
Removing and stacking Expanded Metal ,2"x2" Gl mesh or lron
grill from existing frames
m2
Dm-15
Uprooting fence post , rolling up and stacking barbed wire and
all . other materials (Length of fencing to be measured)
m
206.00
21.2.O0
305.00 84.00 37.00
149.00 223.OO 353.00
Dm
1/3
Demolisher
Item Code
Description
Unit Rate -LKR
Dm-16 Dm-17
Demolishing floors 3" thick brick paved, and clearing debris away from site
Removing and stacking gate sash after demolishing cement conc-rete blocks or removing posts and separating pintle (Demolishing brickwork where necessary paid for separately).
m2
183.00
nr
2,264.OO
Dm-18
Removing and stacking PVC gutter, eave gutter, from roofs of
single storied buildings
m
74.00
Dm-18a
Removing and stacking PVC gutter, eave gutter, from roofs of 2
storied buildings
m
77.OO
Dm-18b
Removing and stacking gutter, eaves, from roofs of three
storied buildings
m
Dm-19
Removing and stacking timber partitions at site including making
good to walls and floors
m2
78.00 872.00
Dm-20
Chipping lime plastering and clearing debris away
m2
Dm-21
Chipping rendering, cement, and clearing debris away from
brick walls and floors
m2
Dm-22
Chipping rendering, cement, and clearing debris away from
cement concrete floors and walls
m2
Dm-23
Roof removing tiles and timber, stacking serviceable materials
and clearing debris in single storied buildings
m2
93.00 275.00 4r2.OO 388.00
Dm-23a
Roof removing tiles and timber, stacking serviceable materials
and clearing debris in two storied buildings
m2
399.00
Dm-23b
Roof removing tiles and timber, stacking serviceable materials
and clearing debris in three storied buildings
m2
407.OO
Dm-24
Demolishing rubble masonry in cement, stacking rubble and
clearing debris a*ay froitr site with scaffolding
m3
Dm-25
Demolishing tiles, glazed and clearing debris away from site
m2
Dm-26
Removing and stacking tiles Calicut or half round, from roof of
singles storied buildings
m2
Dm-26a
Removing and stacking tiles Calicut or half round, from roof of
two storied buildings
m2
2,620.OO 488.00 158.00 163.00
Dm-26b
Removing and stacking tiles Calicut or half round, from roofs of
three storied buildings
m2
166.00
Dm
2/3
@ Demolisher
Item Code
Description
Unit Rate -LKR
Dm-27
Removing and stacking Valance, Barge board materials and
clearing debris away in single storied building
m
74.O0
Dm-27a
Removing and stacking Valance, Barge board materials and
clearing debris away in two storied building
m
77.O0
Dm-28
Chipping cement plaster, soffit and clearing debris away from
site
m2
Dm-29
Removing tiles & reapers from the roof & stacking the same.
m2
Dm-30
Washing & clearing floor & 200 mm height wall area
m2
409.00 169.00
42.0O
Dm-31
Removing Unloading existing Truss ( Timber, steel....etc)
nr
2,737.O0
Dm-32
Unloading , Hoisting & Re-fixing existing Truss ( Timber, steel....etc)
nr
3,374.OO
Dm-33
Removing and stacking Aluminium partitions at site
m2
232.00
Prepared o,,..11.e..
Approved by :
Checked by:
RecommendeO ey :.....b.
Fort- Galle.
Ens. D. N. Yogananda Design Engineer
Engineering Service Olli,:,: Southern Provinc;
Foit, Galie
Director of building Southern Province
Dm
3/3
t9
Rate Schedule for Construction & Repair Works - All First Half 2021- Southern Province
Earthwork
Item Code
Description
Unit
Ew-01 Ew-02
Drains, earth, in any soil except rock requiring blasting cut to
gradient and s[ape as directed and depositing soil within site
m3
Excavation for foundation in any material except rock requiring
blasting, part return fill in and ram, and disposing surplus
within site as directed. (not exceeding 5ft depth)
m3
Ew-03 Ew-04 Ew-05
Earth cutting and levelling site in any material except rock
requiring blasting, including transporting up to 1/4 mile,
m3
depositing and levelling
Filling under floors with gravel or other approved quality of
filling, spread, water and well rammed in 3"layers with
m3
available earth
Filling under floors with gravel or other approved quality of
filling, spread, watered and well rammed in 3" layers (materials
not available at site)(Transport within first mile)
m3
Ew-06 Ew-07 Ew-08
Earthwork support (open planking) in trenches depth up to a of
5'-0"( consider trench of 1,5' long 3' wide,5' depth both faces)
m2
Earthwork support (close planking) in trenches depth up to 5'-
0" consider trench L5'-0" long 3'-0" wide and 5'-0" height of
planking to borth faces
m2
Earthwork support (Close planking ) in deep excavation in
trenches up to 15'- 0" depth. Consider trench length of of 15'-0"
width 5'-6" at top and,3'-6" at bottom.
m2
Rate -LKR
1,134.00 1,326.OO
870.00 1,430.00 3,249.00 1,,387.00 2,578.00 2,9s1.00
Ew-09
Excavation of Well
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed. ( From
ground level up to 5'-0" depth )( From ground level up to 1.52
m3
m depth )
1,326.00
Ew
@
Earthwork
Item Code
Description
Unit
Ew-09 a
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed. ( From 5'-
0" up to 10'-0" depth) ( From 7.52 m up to 3.05 m depth )
m3
Ew-09 b
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed. ( From 10'
0" up to 15'-0" depth )( From 3.05 m up to 4.57 m depth )
m3
Ew-09 c
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed. ( From 15'
0" up to 20'-0" depth )( From 4.57 m up to 6.1.0 m depth )
m3
Ew-09 d
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed.( From 20'
0" up to 25'-0" depth )( From 6.10 m up to 7.62 m depth)
m3
Ew-09 e
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed. ( From 25'
0" up to 30'-0" depth)( From -/.62 m up to 9.15 m depth)
m3
Ew-09 f
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed. ( From 30'
0" up to 35'-0" depth )( From 9.15 m up to 10.67 m depth )
m3
Ew-09 g
Excavation for well in any material except rock requiring
blasting and disposing surplus wlthin site as directed.( From 35'-
0" up to 40'-0" depth )( From 10.67 m up to 12.20 m depth )
m3
Ew-09 h
Excavation for well in any material except rock requlring
blasting and disposing surplus within site as directed. ( From 40'
0" up to 45'-0" depth )( From 72.2O m up to 1-3.72 m depth )
m-a
Ew-09 i
Excavation for well in any material except rock requiring
blasting and disposing surplus within site as directed.( From 45'-
0" up to 50'-0" depth)( From 73.72m up to 15.24 m depth)
m3
Rate -LKR
2,126.00 2,925.OO 3,724.00 4,524.O0 5,323.00 6,r22.00 6,922.00 7,72t.00 8,520.00
Ew
Item Code
Earthwork
Description
6
Unit
Rate -LKR
Excavation by Machine
Ew-10
Earth cutting by machine & push away 100 m from site rate to
include operabr & helper )
m3
Ew-10 a
Earth cutting & Loading by machine & Earth transport 1Km
away from site
m3
Ew-10 b
Earth cutting & Loading by machine & Earth transport 05 Km
away from site
m3
Ew-10 c
Earth cutting & Loading by machine & Earth transport 08Km
away from site
m3
Ew-1.1
Supplying, laying of 25 mm - 200 mm dry stone (for retaining
wall)
m'
Ew-11a
Supplying,and placing 110 mm uP.V.C pipe( Type 250) in
retaining walls as required
m
Ew-t2
Supplying and laying Geo-textile material 1.8 mm thick 150
GSM Including preparing surface as per instruction
m2
Ew-13
Supplying and laying and compacting of ABC
m3
Ew-14
Supplying and placing the 25 mm thick regiform through the
retaining wa ll joints.
m2
Ew-15
Supplying and laying clay puddle 600 wide, 300 mm height as
per instruction ( without excavation )
m3
Ew-16
Backfilling andcompacting to behind of retaining wall with
available earth.
m3
Ew 10d
Excavation by machine for foundation in any material except
requring blasting, part return fill in and ram, and disposing
m3
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- eastern cape province 2022 accounting grade 11 basic planning document
- southern province combined maths i grade 13 2021
- province 55 oro school name 600 popondetta secondary
- grade thresholds march 2021 cambridge assessment international
- southern province combined maths ii grade 13 2021
- 2022 undergraduate chapter of the year petition southern province
- රජ්ය ොසේල පළත් සභ හ පළත් පන අමත්යංය
- all rights reserved ol kq m
- southern connecticut state university faculty senate grade appeal
- province 56 southern highlands school name 602 kagua secondary