Rate Schedule for Construction & Repair Works - All First Half 2021 - Southern Province

Demolisher

Item Code

Description

Unil Rate -LKR

Dm-01

Demolishing brickwork in cement stacking brick and clearing

debris away from site

m3

Dm-02 Dm-03

Demolishingbrickwork in lime stacking brick and clearing debris

away from sit"e

m3

Demolishing cabook masonry in lime mortar stacking cabook

and clearing debris away from site

m3

Dm-04

Demolishing existing building walls above DPC level by machine

& Clearing debris transport 01 Km away from site

m-I

Dm-04a

Demolishing existing wall foundation upto DPC level by machine

& Clearing debris transport 01 Km away from site

m3

Dm-05

Removing existing Ceiling, stacking materials and clearing

debris - away from site !" floor

m2

Dm-05a

Removing existing Ceiling, stacking materials and clearing

debris - 1st floor

m2

Dm-06

Demolishing Cement concrete L5Omm thick and clearing debris

in floors away from site

m3

Dm-07

Demolishing reinforced cement concrete in suspended floors ,

removing reinforcement and clearing debri away from site

m3

L,350.00 1,750.00 1,550.00

924.00 l-,255.00

198.00 203.00 7,194.00 12,590.00

Dm-08

Removing and stacking corrugated sheets, asbestos or

aluminium from roof

m2

Dm-09

Removing and stacking corrugated sheets, iron asbestos or

aluminium alloy from roofs or walls of two storied buildings

m2

Dm-10

Removing and stacking Door or Window, from existing walls

m2

Dm-11

Removing and stacking Door or Window sash from existing

frame

m2

Dm-12

Removing and stacking PVC Down pipes, old or decayed, from

existing building

m

Dm-13

Demolishing drains and clearing debris away from site

m

Dm-14

Removing and stacking Expanded Metal ,2"x2" Gl mesh or lron

grill from existing frames

m2

Dm-15

Uprooting fence post , rolling up and stacking barbed wire and

all . other materials (Length of fencing to be measured)

m

206.00

21.2.O0

305.00 84.00 37.00

149.00 223.OO 353.00

Dm

1/3

Demolisher

Item Code

Description

Unit Rate -LKR

Dm-16 Dm-17

Demolishing floors 3" thick brick paved, and clearing debris away from site

Removing and stacking gate sash after demolishing cement conc-rete blocks or removing posts and separating pintle (Demolishing brickwork where necessary paid for separately).

m2

183.00

nr

2,264.OO

Dm-18

Removing and stacking PVC gutter, eave gutter, from roofs of

single storied buildings

m

74.00

Dm-18a

Removing and stacking PVC gutter, eave gutter, from roofs of 2

storied buildings

m

77.OO

Dm-18b

Removing and stacking gutter, eaves, from roofs of three

storied buildings

m

Dm-19

Removing and stacking timber partitions at site including making

good to walls and floors

m2

78.00 872.00

Dm-20

Chipping lime plastering and clearing debris away

m2

Dm-21

Chipping rendering, cement, and clearing debris away from

brick walls and floors

m2

Dm-22

Chipping rendering, cement, and clearing debris away from

cement concrete floors and walls

m2

Dm-23

Roof removing tiles and timber, stacking serviceable materials

and clearing debris in single storied buildings

m2

93.00 275.00 4r2.OO 388.00

Dm-23a

Roof removing tiles and timber, stacking serviceable materials

and clearing debris in two storied buildings

m2

399.00

Dm-23b

Roof removing tiles and timber, stacking serviceable materials

and clearing debris in three storied buildings

m2

407.OO

Dm-24

Demolishing rubble masonry in cement, stacking rubble and

clearing debris a*ay froitr site with scaffolding

m3

Dm-25

Demolishing tiles, glazed and clearing debris away from site

m2

Dm-26

Removing and stacking tiles Calicut or half round, from roof of

singles storied buildings

m2

Dm-26a

Removing and stacking tiles Calicut or half round, from roof of

two storied buildings

m2

2,620.OO 488.00 158.00 163.00

Dm-26b

Removing and stacking tiles Calicut or half round, from roofs of

three storied buildings

m2

166.00

Dm

2/3

@ Demolisher

Item Code

Description

Unit Rate -LKR

Dm-27

Removing and stacking Valance, Barge board materials and

clearing debris away in single storied building

m

74.O0

Dm-27a

Removing and stacking Valance, Barge board materials and

clearing debris away in two storied building

m

77.O0

Dm-28

Chipping cement plaster, soffit and clearing debris away from

site

m2

Dm-29

Removing tiles & reapers from the roof & stacking the same.

m2

Dm-30

Washing & clearing floor & 200 mm height wall area

m2

409.00 169.00

42.0O

Dm-31

Removing Unloading existing Truss ( Timber, steel....etc)

nr

2,737.O0

Dm-32

Unloading , Hoisting & Re-fixing existing Truss ( Timber, steel....etc)

nr

3,374.OO

Dm-33

Removing and stacking Aluminium partitions at site

m2

232.00

Prepared o,,..11.e..

Approved by :

Checked by:

RecommendeO ey :.....b.

Fort- Galle.

Ens. D. N. Yogananda Design Engineer

Engineering Service Olli,:,: Southern Provinc;

Foit, Galie

Director of building Southern Province

Dm

3/3

t9

Rate Schedule for Construction & Repair Works - All First Half 2021- Southern Province

Earthwork

Item Code

Description

Unit

Ew-01 Ew-02

Drains, earth, in any soil except rock requiring blasting cut to

gradient and s[ape as directed and depositing soil within site

m3

Excavation for foundation in any material except rock requiring

blasting, part return fill in and ram, and disposing surplus

within site as directed. (not exceeding 5ft depth)

m3

Ew-03 Ew-04 Ew-05

Earth cutting and levelling site in any material except rock

requiring blasting, including transporting up to 1/4 mile,

m3

depositing and levelling

Filling under floors with gravel or other approved quality of

filling, spread, water and well rammed in 3"layers with

m3

available earth

Filling under floors with gravel or other approved quality of

filling, spread, watered and well rammed in 3" layers (materials

not available at site)(Transport within first mile)

m3

Ew-06 Ew-07 Ew-08

Earthwork support (open planking) in trenches depth up to a of

5'-0"( consider trench of 1,5' long 3' wide,5' depth both faces)

m2

Earthwork support (close planking) in trenches depth up to 5'-

0" consider trench L5'-0" long 3'-0" wide and 5'-0" height of

planking to borth faces

m2

Earthwork support (Close planking ) in deep excavation in

trenches up to 15'- 0" depth. Consider trench length of of 15'-0"

width 5'-6" at top and,3'-6" at bottom.

m2

Rate -LKR

1,134.00 1,326.OO

870.00 1,430.00 3,249.00 1,,387.00 2,578.00 2,9s1.00

Ew-09

Excavation of Well

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed. ( From

ground level up to 5'-0" depth )( From ground level up to 1.52

m3

m depth )

1,326.00

Ew

@

Earthwork

Item Code

Description

Unit

Ew-09 a

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed. ( From 5'-

0" up to 10'-0" depth) ( From 7.52 m up to 3.05 m depth )

m3

Ew-09 b

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed. ( From 10'

0" up to 15'-0" depth )( From 3.05 m up to 4.57 m depth )

m3

Ew-09 c

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed. ( From 15'

0" up to 20'-0" depth )( From 4.57 m up to 6.1.0 m depth )

m3

Ew-09 d

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed.( From 20'

0" up to 25'-0" depth )( From 6.10 m up to 7.62 m depth)

m3

Ew-09 e

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed. ( From 25'

0" up to 30'-0" depth)( From -/.62 m up to 9.15 m depth)

m3

Ew-09 f

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed. ( From 30'

0" up to 35'-0" depth )( From 9.15 m up to 10.67 m depth )

m3

Ew-09 g

Excavation for well in any material except rock requiring

blasting and disposing surplus wlthin site as directed.( From 35'-

0" up to 40'-0" depth )( From 10.67 m up to 12.20 m depth )

m3

Ew-09 h

Excavation for well in any material except rock requlring

blasting and disposing surplus within site as directed. ( From 40'

0" up to 45'-0" depth )( From 72.2O m up to 1-3.72 m depth )

m-a

Ew-09 i

Excavation for well in any material except rock requiring

blasting and disposing surplus within site as directed.( From 45'-

0" up to 50'-0" depth)( From 73.72m up to 15.24 m depth)

m3

Rate -LKR

2,126.00 2,925.OO 3,724.00 4,524.O0 5,323.00 6,r22.00 6,922.00 7,72t.00 8,520.00

Ew

Item Code

Earthwork

Description

6

Unit

Rate -LKR

Excavation by Machine

Ew-10

Earth cutting by machine & push away 100 m from site rate to

include operabr & helper )

m3

Ew-10 a

Earth cutting & Loading by machine & Earth transport 1Km

away from site

m3

Ew-10 b

Earth cutting & Loading by machine & Earth transport 05 Km

away from site

m3

Ew-10 c

Earth cutting & Loading by machine & Earth transport 08Km

away from site

m3

Ew-1.1

Supplying, laying of 25 mm - 200 mm dry stone (for retaining

wall)

m'

Ew-11a

Supplying,and placing 110 mm uP.V.C pipe( Type 250) in

retaining walls as required

m

Ew-t2

Supplying and laying Geo-textile material 1.8 mm thick 150

GSM Including preparing surface as per instruction

m2

Ew-13

Supplying and laying and compacting of ABC

m3

Ew-14

Supplying and placing the 25 mm thick regiform through the

retaining wa ll joints.

m2

Ew-15

Supplying and laying clay puddle 600 wide, 300 mm height as

per instruction ( without excavation )

m3

Ew-16

Backfilling andcompacting to behind of retaining wall with

available earth.

m3

Ew 10d

Excavation by machine for foundation in any material except

requring blasting, part return fill in and ram, and disposing

m3

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download