Daily Calendar

Wednesday, January 4, 2012

Commission Meetings

Notices

Public Meetings and Workshops

Notice of Draft Resolutions (PU Code § 311(g))

New Filings

Petitions for Modification and Applications for Rehearing

Proposed Decisions/Alternates/Presiding Officer’s Decisions/Arbitrator’s Reports

Advice Letter Filings

Miscellaneous Transportation Items

Miscellaneous Communications Matters

Table of Submission Dates for the Preceding Two Weeks

Changes to Hearing Calendar

Hearings

Notice of All-Party Meetings (PU Code §1701.3(c))

|[pic] | |

| |The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with |

| |disabilities. |

|The CPUC encourages all Californians to participate in its meetings, hearings, workshops, and proceedings. We try to hold our public meetings only in |

|places that are wheelchair accessible and which can accommodate specialized equipment and other services useful to people with disabilities. Please see|

|the notice of the meeting you wish to attend for more specifics. |

| |

|If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public |

|Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |

| Email: public.advisor@cpuc. |FAX: 415-355-5404 (Attn.: Public Advisor) |

|toll-free: 1-866-849-8390 |TTY: 1-866-836-7825 (toll-free) |

|Voice: 415-703-2074 |1-415-703-5282 |

REGULAR COMMISSION BUSINESS MEETINGS

|January 12, 2012 |9:00 am. |San Francisco |

|February 1, 2012 |9:00 am |San Francisco |

|February 16, 2012 |9:00 am |San Francisco |

COMMISSION RATESETTING DELIBERATIVE MEETINGS

(Not Open to the Public)

Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.

|January 9, 2012 |1:30 pm |San Francisco |

|January 27, 2012 |1:30 pm |San Francisco |

|February 13, 2012 |1:30 pm |San Francisco |

OTHER COMMISSION MEETINGS

Notice of Final Oral Argument: A.08-08-022 - In the Matter of the Application of Golden State Water Company (U133W) for a Certificate of Public Convenience and Necessity to Construct and Operate a Water System in Sutter County, California; and to establish Rates for Public Utility Water Service in Sutter County, California.

|January 17, 2012 |California Public Utilities Commission |

|10 am |505 Van Ness Avenue, Commission Auditorium |

| |(Corner of Van Ness Avenue and McAllister Street) |

| |San Francisco |

Pursuant to Public Utilities Code § 1701.3(d), a final oral argument in the above-entitled matter will be held before a quorum of the Commission.

Parties desiring expedited or daily transcripts should advise the Chief Hearing Reporter by telephone at (415) 703-2288, no later than three days prior to the first day of hearing.

If you have questions about the hearing date, time, or place, call the Calendar Clerk at (415) 703-1203.

Notice of Public Participation Hearing: A.09-08-003 - In The Matter of the Application of SAN DIEGO GAS & ELECTRIC COMPANY (U902E) for a Permit to Construct Electrical Facilities With Voltages Between 50 kV and 200 kV and New Substations With High Side Voltages Exceeding 50kV: The East County Substation Project.

|January 24, 2012 |Jacumba Highlands Center |

|6 pm |44681 Old Hwy 80 |

| |Jacumba |

The public participation hearing in the above entitled matters will be held at the date and time above. Administrative Law Judge Hallie Yacknin will preside. Assigned Commissioner Mark Ferron may attend and there may be a quorum of Commissioners present, however, no voting will occur.

Questions about the hearing date, time, or place, call the Calendar Clerk at (415) 703-1203 or ahg@cpuc..

If you require special accommodations, please notify the Public Advisor's Office at toll free 1-866-849-8390 or public.advisor@cpuc., at least 3 business day before the hearing.

Notice of Public Participation Hearing: A.10-11-015 – Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues for Electric Service In 2012, And to Reflect That Increase In Rates.

|January 26, 2012 |Temple City High School - Performance Hall |

|4 pm - 9 pm |9501 Lemon Ave. |

| |Temple City |

The public participation hearing in the above entitled matters regarding the recent electric power outages in San Gabriel Valley will be held at the date and time above. Assigned Commissioner Timothy Alan Simon and Administrative Law Judge Melanie M. Darling will preside. There may be a quorum of Commissioners present; however, no voting will occur.

Questions about the hearing date, time, or place, call the Calendar Clerk at (415) 703-1203 or ahg@cpuc..

If you require special accommodations, please notify the Public Advisor’s Office at toll free 1-866-849-8390 or at public.advisor@cpuc., at least 3 business days before the hearing.

NOTICES

Charge for Commission Documents

To purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.

Commission Resources Available for Rental

The auditorium, hearing rooms, and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, California, are available for rent. Further information about requirements and fees can be obtained by contacting Scott Finger (415) 703-1641.

PUBLIC MEETINGS & WORKSHOP NOTICES

(WORKSHOP CANCELLED) Public Workshop Notice: A.11-08-002, Application of Southern California Edison Company for Approval of its Forecast 2012 Energy Resource Recovery Account (ERRA) Proceeding Revenue Requirement (REVISED AS OF 1/3/12)

|January 4, 2012 (CANCELLED) |California Public Utilities Commission |

|10 am – 4 pm |505 Van Ness Avenue, Commission Courtyard Room |

| |(Corner of Van Ness Avenue and McAllister Street) |

| |San Francisco |

Public Meeting Notice: Deaf and Disabled Telecommunications Program Equipment Program Advisory Committee (EPAC)

|January 5, 2012 |DDTP Main Office |

|10 am - 4 pm |1333 Broadway, Suite 500 |

| |Large Conference Room |

| |Oakland |

PUBLIC MEETING AGENDA

I. Administrative Business, A. Introductions, B. Agenda Modification and Approval, 1. Review of emergency evacuation procedures, C. Review of Minutes from Previous Meetings, II. CPUC Update, III. Review of Telecommunications Devices Now in the Program, IV. Hot Topics from the TEDPA Conference, V. Public Input, VI. CCAF Staff Reports, A. CRS Report, B. Field Operations Report, C. Marketing Report, D. Consumer Affairs Report, E. Customer Contact Report, F. Equipment Report, G. Wireless Report, VII. EPAC Business, A. Report from the Chair, B. Review of Action Items List, VIII. Presentation by Geemarc/Sonic Alert, IX. EPAC Seat Vacancies, and X. Future Offsite Meetings.

ADDITIONAL INFORMATION

For additional information, please contact Patsy Emerson, DDTP Committee Coordinator, (510) 302-1147, or email: patsy@. If you plan to attend the meeting and need sign language interpreters or other special communication accommodations, please call the DDTP office at least five days prior to the meeting date.

ENVIRONMENTAL REMINDER

Please refrain from wearing perfumes or scents to DDTP meetings. Persons with environmental illness or multiple-chemical sensitivity must reduce their exposure in order to attend this meeting.

DOCUMENT PREPARATION

All documents reviewed by EPAC must be available in a Braille format: Therefore, when submitting documents for the EPAC binder, please send a copy, in an electronic format, to patsy@ for Brailling prior to the meeting. Handouts should also be made available in an electronic format.

Public Workshop Notice: R.11-03-007 Order Instituting Rulemaking on the Commission’s Own Motion to Consider Effectiveness and Adequacy of the Competitive Bidding Rule for Issuance of Securities and Associated Impacts of General Order 156, Debt Enhancement Features, and General Order 24-B

|January 9, 2012 |California Public Utilities Commission |

|10 am – 3:30 pm |505 Van Ness Avenue, Commission Hearing Room A |

| |(Corner of Van Ness Avenue and McAllister Street) |

|and |San Francisco |

| | |

|January 10, 2012 | |

|10 am – 3:30 pm | |

The workshop in the above-entitled matter will be held before Administrative Law Judge (ALJ) Seaneen M. Wilson. This workshop will be held in order to discuss issues raised in R.11-03-007, including but not limited to possible: 1) revisions to the Competitive Bidding Rule and General Order 24-B; 2) development of rules to govern Debt Enhancement Features and Interest Rate Risk Management as they relate to the issuance of securities; and 3) incorporation of General Order 156 requirements in the application for authority to issue securities. Questions on the time and location may be directed to the Calendar Clerk, Ann Hoang at 415-703-1203. Questions regarding the agenda and topics for discussion may be directed to ALJ Wilson at 415-703-1525 or email: smw@cpuc..

Public Workshop Notice: Use of Utility AB 32 Auction Revenue (R.1103012)

|January 11, 2011 |California Public Utilities Commission |

|9:30 am – 5 pm |505 Van Ness Avenue, Auditorium |

| |(Corner of Van Ness Avenue and McAllister Street) |

| |San Francisco |

This workshop is part of the Commission’s GHG proceeding (R.11-03-012). During this workshop, Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company (jointly) and PacifiCorp will briefly present their updated Ratepayer Impact Models, for use in evaluating the rate impacts of auction revenue use proposals. These short presentations will focus on explaining any changes to those models from the versions presented in November 2011.

The workshop will also provide an opportunity for parties to discuss their revised proposals for the use of cap-and-trade emissions allowance revenues for 2013 and beyond. These proposals must be filed and served not later than Friday, January 6, 2011, at noon, to ensure that parties have an opportunity to review them before the workshop. Commission staff and parties in attendance at the workshop will have the opportunity to ask clarifying questions regarding the allowance revenue proposals presented.

A workshop agenda will be sent to the service list prior to the workshop. Administrative Law Judges Melissa K. Semcer and Jessica T. Hecht may attend the workshop, which will not be reported or transcribed. For more information, please contact Adam Langton at AHL@cpuc. or (415) 703-1812.

Public Workshop Notice: Reforming Safety Initiatives in Ratemaking Proceedings

|January 11, 2012 |California Public Utilities Commission |

|10 am |505 Van Ness Avenue, Commission Courtyard Room |

| |(Corner of Van Ness Avenue and McAllister Street) |

|January 12, 2012 |San Francisco |

|10 am (Golden Gate Room) | |

| | |

|January 13, 2012 | |

|10 am | |

Stakeholders are invited to participate in a workshop to discuss how to reform safety initiatives in the Commission’s ratemaking proceedings. ALJ Angela Minkin and Marzia Zafar will facilitate the workshops. A draft agenda will be provided prior to the workshop. No later than January 4, 2012, please RSVP to Ms. Zafar; email: zaf@cpuc. or 415-703-1997. The workshops are not held in conjunction with a proceeding; no intervenor compensation is available for participation at the workshops.

Questions should be directed to Ms. Zafar. Please note that although we have noticed the workshops for January 12 and January 13, it is possible that we may not need to convene the workshops on these dates.

Public Workshop Notice: Smart Grid Deployment Plans (A.11-06-006, A.11-06-029, A.11-07-00)

|Workshop #1 – Smart Customer |California Public Utilities Commission |

|January 23, 2012 |505 Van Ness Avenue |

|1 pm – 5 pm |(Corner of Van Ness Avenue and McAllister Street) |

|Golden Gate Room, CPUC |San Francisco |

| | |

|Workshop #2 – Smart Market | |

|January 24, 2012 | |

|9:30 am – 4 pm | |

|Golden Gate Room, CPUC | |

| | |

|Workshop #3 – Smart Utility | |

|January 25, 2012 | |

|9:30 am – 4 pm | |

|Golden Gate Room, CPUC | |

| | |

|Workshop #3 – Smart Utility (if needed) | |

|January 26, 2012 | |

|9:30 am – 4 pm | |

|Courtyard Room, CPUC | |

The first workshop will examine the smart grid deployment plans from the perspective of “Smart Customer” and will examine whether and how the deployment plans promote customer empowerment and engagement.  The second workshop will examine the smart grid deployment plan from the perspective of “Smart Market” and will determine whether the deployment plans provide the information needed to promote advanced market responses including distributed generation, rooftop solar, and demand response.  The third workshop, which is scheduled for two days, will examine the smart grid deployment plans from the perspective of “Smart Utility” and will seek to examine the new capabilities that the plans will provide to the utility to provide secure and reliable service.  In addition, issues related to advancing the Commission’s environmental goals will be considered in each workshop as relevant.  The workshop is for all interested parties.  A workshop Agenda and Notice will be e-mailed to the service list of A.11-06-006, A.11-06-029, & A.11-07-001.  For further information, please contact Liza Malashenko; email:  eim@cpuc. or (415) 703-2274.

Public Meeting Notice: Universal Lifeline Telephone Service Administrative Committee Meeting

|February 23, 2012 |California Public Utilities Commission |

|1 pm - 4 pm |505 Van Ness Avenue, Golden Gate Room |

| |(Corner of Van Ness Avenue and McAllister Street) |

| |San Francisco |

| | |

| |Call-in Number: (866) 741-9705; Code: 6691236 # |

AGENDA

1. Introduction; 2. Approval of minutes; 3. Fiscal Report; 4. Contract Reports; 5. CAB Report; 6. Legal Liaison Report; 7. Public comments; 8. Communications Division Liaison Report; 9. ULTS-AC Report; 10. ULTS-AC vacancy update; 11. Future meeting date and location; and 12. Adjournment.

NOTICE OF DRAFT RESOLUTIONS

(Pursuant to PU Code § 311(g))

The Energy Division has prepared Draft Resolution E-4438 for January 12, 2012 Commission Meeting. This Resolution approves cost recovery for the long-term renewable energy power purchase agreement between Southern California Edison Company and Silver State Solar Power South, LLC, a wholly-owned subsidiary of First Solar, Inc. Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Adam Schultz email: adam.schultz@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4456 for the January 12, 2012 Commission Meeting. This Resolution approves cost recovery for power purchase agreements between Southern California Edison and Solar Star California XIII, LLC, Solar Star California XIX, LLC and Solar Star California XX, LLC. Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Jason Simon; email: jason.simon@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4458 for the January 12, 2012 Commission Meeting. This Resolution approves cost recovery for the long-term renewable energy power purchase agreement, as amended, between San Diego Gas & Electric Company and Ocotillo Express LLC. The power purchase agreement, as amended, is approved without modification. Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Cheryl Lee; email: cnl@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4459 for the January 12, 2012 Commission Meeting. This Resolution approves cost recovery for the long-term renewable power purchase agreement between Pacific Gas & Electric Company (PG&E) and Montezuma Winds II, LLC and approval of an amendment to a Qualified Facility power purchase agreement between PG&E and power produced by a wind project owned by enXco Windfarm V, Inc. Notice of this draft has been sent to parties in the service lists. Any questions or comments should be directed to Junaid Rahman; email: Junaid.Rahman@cpuc..

The web link is .

The Consumer Protection and Safety Division (CPSD) has prepared Draft Resolution ROSB-003 for the January 12, 2012 Commission Meeting. The resolution grants the request of Union Pacific Railroad to deviate from the requirements of General Order 118-A. Any questions or comments should be directed to Paul King; email: PWK@cpuc. or (415) 703-2408.

The web link is .

The Communications Division has prepared Resolution T-17334 for the January 12, 2012, Commission Meeting. This Resolution denies Sierra Telephone Company Advice Letters 388 and 389 seeking authority under PU Code Section 851 to sell property to its affiliate Sierra Telephone Business Systems. Notice of this draft has been sent to the parties in the service lists. Any questions or comments should be directed to Michael Coen; email: michael.coen@cpuc..

The web link is .

The Communications Division has prepared Resolution T-17353 for the January 12, 2012, Commission Meeting. This Resolution adopts an annual fee to implement the Digital Infrastructure and Video competition act (DIVCA) for the Fiscal Year 2011-2012. Notice of this draft has been sent to the parties in the service lists. Any questions or comments should be directed to Michael Pierce; email: michael.pierce@cpuc..

The web link is .

The Communications Division has prepared Resolution T-17354 for the January 12, 2012, Commission Meeting. Resolution T-17354, if adopted, will approve ExteNet's request for a deviation in accordance with Public Utilities Code Section 320 contingent upon compliance with San Mateo County's regulations and permitting process. Notice of this draft has been sent to the parties in the service lists. Any questions or comments should be directed to Charlotte Mister; email: CM3@cpuc..

The web link is .

The Consumer Protection and Safety Division has prepared Resolution TL-19104 for the January 12, 2012 Commission Meeting. The resolution increases the maximum rates in Maximum Rate Tariff 4, containing maximum rates for household goods carriers, by 2.8%. Any questions or comments should be directed to Wilson Lewis; email: wel@cpuc..

The web link is .

The Division of Water and Audits has prepared Resolution W-4899 for the January 12, 2012 Commission Meeting which rejects San Gabriel Valley Water Company's request in Advice Letter 494 without prejudice to permit payment of water bills using a credit or debit cards or electronic checks as bill payment options. Any questions or comments should be directed to James Boothe; email: jb5@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4448 for the February 1, 2012 Commission Meeting. This Resolution approves San Diego Gas & Electric Company's request for cost recovery of a short-term renewable energy power purchase agreement with Southern California Edison Company and a short-term renewable energy power purchase agreement with Calpine Energy Services, L.P. The power purchase agreements are approved without modification. Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Cheryl Lee; email: cnl@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4449 for the February 1, 2012 Commission Meeting. This Resolution approves Southern California Edison Company's request to enter into a renewable energy sales contract with San Diego Gas & Electric Company. The contract is approved without modification. Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Cheryl Lee; email: cnl@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4453 for the February 1, 2012 Commission Meeting.  This Resolution approves with modifications various changes to Southern California Edison Company's Solar Photovoltaic Program (SPVP).  Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Jaclyn Marks; email: jm3@cpuc..

The web link is .

The Energy Division has prepared Draft Resolution E-4463 for the February 1, 2012 Commission Meeting.  This Resolution approves cost recovery for the long-term renewable energy power purchase agreement between Pacific Gas & Electric Company and North Sky River Energy, LLC, a wholly-owned subsidiary of NextEra Energy Resources, LLC. 

The web link is .

NOTICE OF RESOLUTION AUTHORIZING ACCELERATED RETIREMENT DATE FOR HUNTINGTON BEACH GENERATING UNITS 3 AND 4

Resolution EGPB-12A modifies Resolution EGPB-12 by accelerating the permanent retirement date for Huntington Beach Generating Units 3 and 4 from October 31, 2011 to January 12, 2012.

On December 29, 2011, the draft resolution was mailed to the attached service list, pursuant to California Public Utilities Code Section 311(g) and Rule 14.5 of the Commission’s Rules of Practice and Procedure. The two known parties stipulated to a reduced comment period of 10 days. Comments shall be served no later than January 9, 2012, and reply comments shall be served no later than January 10, 2012.

Res EGPB-12A will be on the agenda for the January 12, 2012 Commission meeting. The Commission may then vote on this draft resolution, or it may postpone a vote.

When the Commission acts on the draft resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own order. Only when the Commission acts does the resolution become binding on the parties.

Finally, an original and two copies of the comments, with a certificate of service should be submitted to:

Valerie Beck

Program and Project Supervisor

Consumer Protection and Safety Division

California Public Utilities Commission

505 Van Ness Avenue, Room 2201

San Francisco, CA 94102-3298

Telephone: 415-703-2265

E-mail: vjb@cpuc.

Additional e-mail copies to: bdl@cpuc.; and chh@cpuc..

The Energy Division has prepared Resolution G-3465 for the February 1, 2012 Commission Meeting. This is about Pacific Gas & Electric Company’s request for approval on revisions to Gas Rule 23. Any questions or comments should be directed to Richard Myers; email: ram@cpuc. and Gregory Reisinger; email: Gregory.reisinger@cpuc..

The web link is .

NOTICE OF RESOLUTION AUTHORIZING PUBLIC DISCLOSURE OF INVESTIGATION RECORDS

Resolution L-429 authorizes disclosure of records concerning the California Public Utilities Commission (Commission) Consumer Protection and Safety Division’s investigation of August 11, 2011 electric incident at Paseo Noche in Camarillo, California, once the investigation is complete.

On December 28, 2011, the draft resolution was mailed to the attached service list, pursuant to California Public Utilities Code Section 311(g) and Rule 14.5 of the Commission’s Rules of Practice and Procedure. Comments shall be served no later than January 23, 2012, and reply comments shall be served no later than January 27, 2012.

Res L-429 will be on the agenda at the February 1, 2012 Commission meeting. The Commission may then vote on this draft resolution, or it may postpone a vote.

When the Commission acts on the draft resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own order. Only when the Commission acts does the resolution become binding on the parties. Finally, an original and two copies of the comments, with a certificate of service should be submitted to:

Fred Harris, Staff Counsel

Legal Division

California Public Utilities Commission”

505 Van Ness Avenue, Room 5040

San Francisco, CA 94102-3298

Telephone: 415-703-1557

E-mail: fnh@cpuc.; jav@cpuc.

The Division of Water and Audits has prepared Comment Resolution W-4900 for the February 1, 2012 Commission Meeting which authorizes Timberland Water Company, Inc. a general rate increase, producing additional annual revenue of $14,359 or 14.4% for test year 2011, and facilities fees. Any questions or comments should be directed to Michael Miller; email: mml@cpuc. or Peter Liu; email: ptl@cpuc..

 

The web link is .

The Division of Water and Audits has prepared Resolution W-4901 for the February 1, 2012 Commission Meeting which approves California Hot Springs Water Company's request in Advice Letters 10 and 7-S for water and sewer rate increases, respectively. Any questions or comments should be directed to James Boothe; email: jb5@cpuc..

The web link is .

NEW FILINGS

NONE

PETITIONS FOR MODIFICATION AND APPLICATIONS FOR REHEARING

NONE

PROPOSED DECISIONS * ALTERNATES * PRESIDING OFFICER’S DECISIONS * ARBITRATOR’S REPORTS

NONE

|ADVICE LETTER FILINGS |

| |

|To inquire about a filing, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-2028). |

|To protest a filing, mail the original letter/telegram to the Chief of the appropriate division (i.e., "Chief, [Energy, Communications or Water] |

|Division"), to be received no later than 20 days after the date the Advice Letter was filed. |

|"Effective TBD" means that the date is to be determined by further Commission action. A date listed as "anticipated effective" may be subject to |

|change. An Advice Letter Supplement is not a new filing, and there is no protest period unless indicated. |

|01/23/11 |Water 928 |California-American Water Company, Village District - Offset increase in purchased water. (anticipated |

| | |effective 01/01/12) |

| | | |

|12/13/11 |Energy 3969E |Pacific Gas and Electric Company, Modification of PG&E Rate Schedules NEM, NEMV, NEMFC and NEMBIO and |

| | |Associated Forms Pursuant to Senate Bill 489 (anticipated effective 01/01/12) |

| | | |

|12/15/11 |Energy 3970E |Pacific Gas and Electric Company, PG&E's Standard and Simplified Contracts and Tariffs for the Purchase of |

| | |Excess Electricity from Eligible Combined Heat and Power Systems in Compliance with Resolution E-4424 and |

| | |D.10-12-055 (anticipated effective 12/15/11) |

| | | |

|12/15/11 |Energy 2179E-C |San Diego Gas & Electric Company, Supplements A.L.No.2179E, Establishment of Combined Heat and Power Tariff |

| | |in Compliance with D.09-12-042 Under Assembly Bill 1613 (effective TBD) |

| | | |

|12/15/11 |Energy 2485E-C |Southern California Edison Company, Supplements A.L.No.2485E, Establishment of Tariff for Purchase of Excess |

| | |Electricity from Eligible Combined Heat and Power (CHP) Systems (anticipated effective 07/21/10) |

| | | |

|12/15/11 |Energy 2675E |Southern California Edison Company, Modification of Applicable California Alternate Rates for Energy and |

| | |Family Energy Rate Assistance Programs Forms and Energy Statements (anticipated effective 01/16/12) |

| | | |

|12/15/11 |Energy 4309G |Southern California Gas Company, Daily Balancing Standby Rates for December 8-14, 2011 (anticipated effective|

| | |12/15/11) |

| | | |

|12/16/11 |Energy 3971E |Pacific Gas and Electric Company, PG&E's Contract and Tariff for the Purchase of Excess Electricity from |

| | |Eligible Combined Heat and Power Systems Under 500kW (anticipated effective 12/16/11) |

| | | |

|12/16/11 |Energy 462E |Pacificorp, Update Net Metering Service Tariff Schedule NEM-35 Pursuant to Senate Bill 489 (anticipated |

| | |effective 01/01/12) |

| | | |

|12/16/11 |Energy 463E |Pacificorp, Establish Contract for Eligible Small Combined Heat and Power Systems < 500kW in Compliance with |

| | |Commission D. 10-12-055 (anticipated effective 12/16/11) |

| | | |

|12/16/11 |Energy 2316E |San Diego Gas & Electric Company, Establishment of the Cyumaca Peak Energy Plant Memorandum Account |

| | |(anticipated effective 01/01/12) |

| | | |

|12/16/11 |Energy 2317E |San Diego Gas & Electric Company, Establishment of Combined Heat and Power Tariff for Facilities Under 500 |

| | |Kilowatts in Compliance with D.09-12-042 Under Assembly Bill 1613 (anticipated effective 12/16/11) |

| | | |

|12/16/11 |Energy 2676E |Southern California Edison Company, Establishment of Tariff for Purchase of Excess Electricity from Small |

| | |Eligible Combined Heat and Power Systems of Less than 500 kW (effective TBD) |

| | | |

|12/19/11 |Energy 262E |Golden State Water Company, Request Authority to Spend the Unspend 2009-2011 Energy Savings Assistance |

| | |Program Funds in the 2012-2014 Program Cycle (anticipated effective 01/01/12) |

| | | |

|12/19/11 |Energy 3265G |Pacific Gas and Electric Company, Implementation of Core Transportation Agent (CTA) Settlement Agreement, |

| | |Part A (anticipated effective 01/18/12) |

| | | |

|12/19/11 |Energy 3973E |Pacific Gas and Electric Company, Revision of Rates and TAriffs in Compliance with D. 11-12-053 in PG&E's |

| | |2011 General Rate Case, Phase 2, Non-Residential Rate Design Revisions (anticipated effective 01/01/12) |

| | | |

|12/19/11 |Energy 3974E |Pacific Gas and Electric Company, Amendment to Existing Qualifying Facility Power Purchase Agreement for |

| | |Procurement of Eligible Renewable Energy Resources Between Burney Forest Products and PG&E (anticipated |

| | |effective 10/01/11) |

| | | |

|12/19/11 |Energy 2318E|2079G |San Diego Gas & Electric Company, Notification of the Creation of New Affiliates (anticipated effective |

| | |12/19/11) |

| | | |

|12/19/11 |Energy 4310G |Southern California Gas Company, Notification of the Creation of New Affiliates (anticipated effective |

| | |12/19/11) |

| | | |

|12/20/11 |Telecom 40082 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/20/11 |Telecom 40085 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/20/11 |Telecom 40087 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/20/11 |Telecom 40090 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/20/11 |Telecom 40093 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/20/11 |Telecom 40094 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/23/11 |Water 927 |California-American Water Company, Requesting an increase in the DSIC Surcharge applied to all bills for |

| | |water service effective 1/1/2012. (anticipated effective 01/01/12) |

| | | |

|12/27/11 |Telecom 40096 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/27/11 |Telecom 40097 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/27/11 |Telecom 40098 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/27/11 |Telecom 40099 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/27/11 |Telecom 40100 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/27/11 |Telecom 40101 |Pacific Bell, Contracts (effective TBD) |

| | | |

|12/27/11 |Telecom 40102 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/27/11 |Telecom 40103 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/27/11 |Telecom 40104 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/27/11 |Telecom 40105 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/27/11 |Telecom 40106 |Pacific Bell, Contract (effective TBD) |

| | | |

|12/30/11 |Water 68 |Bakman Water Co., Consumer Price Index increase (anticipated effective 01/02/12) |

| | | |

|ADVICE LETTER SUSPENSIONS (Pursuant to M-4801, 04/19/01) |

| |

|To inquire about a suspension, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-2028). |

|12/30/11 |Energy 3959E |Pacific Gas and Electric Company. Initial suspension on the following grounds: advice letter requires staff |

| | |review... Date suspension ends: 04/27/12. Note: Initial suspensions will be automatically extended for an |

| | |additional 180 days if the Commission has not issued an order regarding the advice letter by the date the |

| | |first suspension period ends. |

| | | |

|01/23/12 |Water 927 |California-American Water Company. Initial suspension on the following grounds: additional time is needed. |

| | |Date suspension ends: 05/22/12. Note: Initial suspensions will be automatically extended for an additional |

| | |180 days if the Commission has not issued an order regarding the advice letter by the date the first |

| | |suspension period ends. |

| | | |

|ADVICE LETTER PROTESTS |

| |

|To inquire about a protest, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-2028). To obtain a copy of |

|the protest, please direct your request to the protestor. |

|12/28/11 |Energy 2674E |Southern California Edison Company, 2012 California Department of Water Resources Power and Bond Charges in |

| | |Accordance with D.11-12-005 Protest by City of Cerritos. |

| | | |

MISCELLANEOUS TRANSPORTATION ITEMS

Filings with Consumer Protection and Safety Division

NONE

MISCELLANEOUS COMMUNICATIONS MATTERS

NONE

TABLE OF SUBMISSION DATES FOR THE PRECEDING TWO WEEKS - NONE

| | |

CHANGES TO HEARING CALENDAR

NEW SETTINGS - NONE

| | |

RESETTINGS - NONE

| | |

REMOVALS FROM CALENDAR

|ALJ MacDonald |E-4257-02 - In the matter of the Citation of Liberty Power Holdings, LLC’s Citation for Violation of Resolution E-4257, |

| |Appeal Hearing of Citation scheduled for January 3 has been removed from the Calendar |

| | |

HEARINGS CONTINUED

|ALJ Kim |A.11-05-017 - Application of Southern California Edison Company (U338E) for Approval of its 2012- 2014 California Alternate |

| |Rates for Energy (CARE) and Energy Savings Assistance Programs and Budgets, |

| |And Related Matters: |

| |A.11-05-018, |

| |A.11-05-019, |

| |A.11-05-020, |

| |Evidentiary Hearing held and continued to January 4 |

| | |

HEARINGS CONCLUDED

|ALJ Weatherford |C.11-05-025 - James and Marie Hughes, Kathleen Palmer, Gregory and Michelle Land, Patrick and Delores McMillen, Jeffery and |

| |Tina Strunc, and Michael and Robin Beals, Complainants vs. Big Oak Valley Water District, Defendant, |

| |Telephonic – Prehearing Conference held and concluded |

| | |

HEARINGS

Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.

|(PHC) = Prehearing Conference |(ECP) = Expedited Complaint Procedure |(CA) = Closing Argument |

|(EH) = Evidentiary Hearing |(OSC) = Order to Show Cause |(LM) = Law & Motion |

|(PPH) = Public Participation Hearing |(WS) = Workshop |(OA) = Oral Argument |

|(IAM) = Initial Arbitration Meeting |(FPH) = Full Panel Hearing |(STC) = Status Conference |

|(AH) = Arbitration Hearing |(FOA) = Final Oral Argument |(DC) = Discovery Conference |

|(APPEAL) = Appeal Hearing of General Order 156 |(CITATION) = Appeal Hearing of Citation |(SCF) = Settlement Conference |

|1/4/12 |A.11-05-017 (EH) - Application of Southern California Edison Company (U338E) for Approval of its 2012- 2014 California |

|10:00 a.m. |Alternate Rates for Energy (CARE) and Energy Savings Assistance Programs and Budgets, |

|ALJ Kim |And Related Matters: |

|Comr Simon |A.11-05-018, |

| |A.11-05-019, |

| |A.11-05-020, |

| |Commission Courtroom, San Francisco |

| |(Also January 5 – 6) |

| | |

|1/4/12 |A.11-07-005 (EH) - In the Matter of the Application of San Gabriel Valley Water Company (U337W) for Authority to Increase |

|10:30 a.m. |Rates Charged for Water Service in its Fontana Water Company Division by $8,164,800 or 14.2% in July 2012, $3,067,400 or 4.7% |

|ALJ Long |in July 2013, and $3,758,200 or 5.6% in July 2014, |

|Comr Ferron |Commission Courtroom, San Francisco |

| |(Also January 5 - 6 at 9:30 a.m.) |

| | |

|1/5/12 |A.11-08-019 (PHC) - In the Matter of the Application of Golden Hills Sanitation Company (U438SWR) for Authority to Increase |

|10:00 a.m. |Rates Charged for Sewer Service by $148,076 or 120% in January 2012, $148,076 or 54% in January 2013, and $148,076 or 35% in |

|ALJ Wilson |January 2014, |

|Comr Florio |Commission Courtroom, San Francisco |

| | |

|1/6/11 |A.11-07-010 (EH) - Application of Pacific Gas and Electric Company for Approval of the GWF Transaction and Associated Cost |

|10:00 a.m. |Recovery (U39E), |

|ALJ Gamson |Commission Courtroom, San Francisco |

|Comr Florio | |

| | |

|1/9/12 |C.11-09-007 (PHC) - Cox California Telcom, LLC (U5684C), Complainant, v. Vaya Telecom, Inc. (U7122C), Defendant, |

|10:00 a.m. |Commission Courtroom, San Francisco |

|ALJ Vieth | |

|Comr Florio | |

| | |

|1/9/12 |R.11-03-007 (WS) - Order Instituting Rulemaking on the Commission’s Own Motion to Consider Effectiveness and Adequacy of the |

|10:00 a.m. - |Competitive Bidding Rule for Issuance of Securities and Associated Impacts of General Order 156, Debt Enhancement Features, |

|3:30 p.m. |and General Order 24-B, |

|ALJ Wilson |Commission Courtroom, San Francisco |

|Comr Simon |(Also January 10) |

| | |

|1/10/12 |I.10-02-020 (WS) - Order Instituting Investigation on the Commission’s Own Motion into the closure of the Highway-Rail |

|10:00 a.m. |at-Grade Crossing at West Doran Street South of State Route 134 between San Fernando Road and West San Fernando Road, in the |

|ALJ Rochester |City of Glendale, California, DOPT Crossing No. 746804B, CPUC Crossing No. 101VY-7.99, and the Effects of that Closure on the|

|Comr Simon |City of Glendale and Nearby residents in the City of Los Angeles, California, |

| |Junipero Serra State Office Building, 320 West 4th Street, Conference Room A, Los Angeles, CA |

| |(Also January 11) |

| | |

|1/10/12 |R.11-03-007 (EH) - Order Instituting Rulemaking on the Commission’s Own Motion to Consider Effectiveness and Adequacy of the |

|1:30 p.m. |Competitive Bidding Rule for Issuance of Securities and Associated Impacts of General Order 156, Debt Enhancement Features, |

|ALJ Wilson |and General Order 24-B, |

|Comr Simon |Commission Courtroom, San Francisco |

| | |

|1/11/12 |A.09-08-020 (EH) - Application of San Diego Gas & Electric Company (U902M), Southern California Edison Company (U338E), |

|10:00 a.m. |Southern California Gas Company (U904G) and Pacific Gas and Electric Company (U39M) for Authority to Establish a Wildfire |

|ALJ Bushey |Expense Balancing Account to Record for Future Recovery Wildfire-Related Costs, |

|Comr Simon |Commission Courtroom, San Francisco |

| |(Also January 12 - 13) |

| | |

|1/12/12 |C.11-06-023 (ECP) - Sharon Tesler, Complainant, vs. Sprint Nextel of California Inc. (U3066C), Defendant, |

|11:00 a.m. |Commission Courtroom, San Francisco |

|ALJ Barnett | |

| | |

|1/12/12 |C.11-10-026 (ECP) - Cristina Ciumac, Complainant, vs. T-Mobile West Corporation, dba T-Mobile (U3056C), Defendant, |

|12:00 noon |Commission Courtroom, San Francisco |

|ALJ Barnett | |

| | |

|1/17/12 |A.08-08-022 (FOA) - In the Matter of the Application of Golden State Water Company (U133W) for a Certificate of Public |

|10:00 a.m. |Convenience and Necessity to Construct and Operate a Water System in Sutter County, California; and to establish Rates for |

|ALJ Kim |Public Utility Water Service in Sutter County, California, |

|Comr Peevey |Commission Auditorium, San Francisco |

| | |

|1/17/11 |A.10-12-005 (EH) - Application of San Diego Gas & Electric Company (U902M) for Authority, Among Other Things, to Increase |

|9:00 a.m. |Rates and Charges for Electric and Gas Service Effective on January 1, 2012, and |

|ALJ Wong |A.10-12-006 - Application of Southern California Gas Company (U904G) for authority to update its gas revenue requirement and |

|Comr Ferron |base rates effective on January 1, 2012, |

| |Commission Courtroom, San Francisco |

| |(Also January 18 – 20 and January 23 – 27 at 9:00 a.m.) |

| | |

|1/17/12 |I.11-02-016 (PHC) - Order Instituting Investigation on the Commission’s Own Motion into the Operations and Practices of |

|10:00 a.m. |Pacific Gas and Electric Company with Respect to Facilities Records for its Natural Gas Transmission System Pipelines, |

|ALJ Yip-Kikugawa |Commission Courtroom, San Francisco |

|Comr Florio | |

| | |

|1/17/12 |R.11-02-018 (PHC) - Order Instituting Rulemaking into Transfer of Master-Meter/Submeter systems at Mobilehome parks and |

|1:30 p.m. |Manufactured Housing Communities to Electric and Gas Corporations, |

|ALJ Vieth |Commission Courtroom, San Francisco |

|Comr Florio | |

| | |

|1/18/12 |A.07-06-031 (PHC) - In the Matter of the Application of Southern California Edison Company (U338E) for a Certificate of Public|

|10:00 a.m. |Convenience and Necessity Concerning the Tehachapi Renewable Transmission Project (Segments 4 through 11), |

|ALJ Vieth |Commission Courtroom, San Francisco |

|Comr Peevey | |

| | |

|1/18/12 |A.11-04-001 (EH) - Application of Southern California Edison Company (U338E) for a Commission Finding that its |

|10:00 a.m. |Procurement-Related and Other Operations for the Record Period January 1 Through December 31, 2010 Complied with its Adopted |

|ALJ Roscow |Procurement Plan; for Verification of its Entries in the Energy Resource Recovery Account and Other Regulatory Accounts; and |

|Comr Florio |for Recovery of $25.613 Million Recorded in Three Memorandum Accounts, |

| |Commission Courtroom, San Francisco |

| |(Also January 19 - 20) |

| | |

|1/23/12 |A.11-05-001 (EH) - Application of California Water Service Company (U60W) for Authority to Establish its Authorized Cost of |

|10:00 a.m. |Capital for the period from January 1, 2012 through December 31, 2014, |

|ALJ Bemesderfer |And Related Matters: |

|Comr Ferron |A.11-05-002 |

| |A.11-05-003 |

| |A.11-05-004 |

| |Commission Courtroom, San Francisco |

| |(Also January 24 - 25) |

| | |

|1/24/12 |A.04-09-019 (PHC) - In the Matter of the Application of California-American Water Company for a Certificate of Public |

|10:00 a.m. |Convenience and Necessity to Construct and Operate its Coastal Water Project to Resolve the Long-Term Water Supply Deficit in |

|ALJ Minkin |its Monterey District and to Recover All Present and Future Costs in Connection Therewith in Rates. (U210W), |

|Comr Peevey |Commission Courtroom, San Francisco |

| | |

|1/24/12 |A.09-08-003 (PPH) - In The Matter of the Application of SAN DIEGO GAS & ELECTRIC COMPANY (U902E) for a Permit to Construct |

|6:00 p.m. |Electrical Facilities With Voltages Between 50 kV and 200 kV and New Substations With High Side Voltages Exceeding 50kV: The |

|ALJ Yacknin |East County Substation Project, |

|Comr Ferron |Jacumba Highlands Center, 44681 Old Hwy 80, Jacumba, CA |

| | |

|1/26/12 |A.10-11-015 (PPH) - Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase |

|4:00 p.m. - |Its Authorized Revenues For Electric Service In 2012, And to Reflect That Increase In Rates, |

|9:00 p.m. |Temple City High School – Performance Hall, 9501 Lemon Ave., Temple City, CA |

|ALJ Darling | |

|Comr Simon | |

| | |

|1/26/12 |C.11-08-017 (TELEPHONIC – PHC) - Carole Lieff, Complainant, vs. Southern California Edison Company (U338E), Defendant, |

|10:00 a.m. |Commission Courtroom, San Francisco |

|ALJ Clark | |

|Comr Florio | |

| | |

|1/30/12 |A.11-11-002 (PHC) (OA) - In the Matter of the Application of San Diego Gas & Electric Company (U902G) and Southern California|

|1:30 p.m. |Gas Company (U904G) for Authority To Revise Their Rates Effective January 1, 2013, in Their Triennial Cost Allocation |

|ALJ Long |Proceeding, |

|Comr Florio |Commission Courtroom, San Francisco |

| | |

|1/30/12 |C.11-09-013 (PHC) - Everyday Communications Corp. d/b/a Everyday Energy, Complainant, v. San Diego Gas & Electric Company |

|10:30 a.m. |(U902E), Defendant, |

|ALJ MacDonald |San Diego State Office Building, 1350 Front Street, 6th Floor, Courtroom 2, San Diego, CA |

|Comr Peevey | |

| | |

|1/30/12 |A.11-09-003 (PHC) - Application of Kingstone Telecommunications, Inc. for Registration as an Interexchange Carrier Telephone |

|1:30 p.m. |Corporation Pursuant to the Provisions of Public Utilities Code Section 1013, |

|ALJ Clark |Commission Courtroom, San Francisco |

|Comr Sandoval | |

| | |

|1/31/12 |A.11-05-023 (EH) - Application of San Diego Gas & Electric Company (U 902 E) for Authority to Enter into Purchase Power |

|9:00 a.m. |Tolling Agreements with Escondido Energy Center, Pio Pico Energy Center and Quail Brush Power, |

|ALJ Yacknin |Commission Courtroom, San Francisco |

|Comr Ferron |(Also February 1) |

| | |

|2/2/12 |A.11-06-003 (EH) - Application of San Diego Gas & Electric Company (U902E) for Approval of: (i) Contract Administration, Least|

|10:00 a.m. |Cost Dispatch and Power Procurement Activities in 2010, (ii) Costs Related to those Activities Recorded to the Energy Resource|

|ALJ Roscow |Recovery Account and Transition Cost Balancing Account in 2010 and (iii) Costs Recorded in Related Regulatory Accounts in |

|Comr Florio |2010, |

| |Commission Courtroom, San Francisco |

| |(Also February 3) |

| | |

|2/7/12 |A.11-07-008 (EH) - Application of Pacific Gas and Electric Company (U39M), San Diego Gas & Electric Company (U902E), and |

|9:30 a.m. |Southern California Edison Company (U338E) for Authority to Increase Electric Rates and Charges to Recover Costs of Research |

|ALJ Sullivan |and Development Agreement with Lawrence Livermore National Laboratory for 21st Century Energy Systems, |

|Comr Peevey |Commission Courtroom, San Francisco |

| |(Also February 8) |

| | |

|2/9/12 |C.11-10-001 (ECP) – Michael J. Shirey, Complainant, vs. Southern California Edison Company, (U338E), Defendant, |

|11:00 a.m. |San Diego State Office Building, 1350 Front Street, 6th Floor, Courtroom 2, San Diego, CA |

|ALJ Barnett | |

| | |

|2/10/12 |C.11-10-008 (ECP) – Mark Tarrant, Complainant, vs. Southern California Edison Company, (U338E), Defendant, |

|11:00 a.m. |Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA |

|ALJ Barnett | |

| | |

|2/10/12 |C.11-08-009 (ECP) - Candi Pionessa and Walter Lubell, Complainants, vs. Southern California Edison Company (U338E), Defendant,|

|12 noon |Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA |

|ALJ Barnett | |

| | |

|2/10/12 |C.11-10-025 (ECP) - Glenn and Rebecca Robinson, Complainants, vs. Golden State Water Company (U133W), Defendant, |

|1:00 p.m. |Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA |

|ALJ Barnett | |

| | |

|2/10/12 |C.11-11-016 (ECP) - Jane Graham, Complainant, vs. Southern California Company, (U338E), Defendant, |

|2:00 p.m. |Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA |

|ALJ Barnett | |

| | |

|2/14/12 |A.11-09-022 (EH) - Application of San Diego Gas & Electric Company (U902E) for Adoption of its 2012 Energy Resource Recovery |

|10:00 a.m. |Account Revenue Requirement and Competitive Transition Charge Revenue Requirement Forecasts, |

|ALJ Roscow |Commission Courtroom, San Francisco |

|Comr Florio |(Also February 15) |

| | |

|2/21/12 |A.10-02-028 (EH) - Application of Pacific Gas and Electric Company for Approval of its 2010 Rate Design Window Proposal for |

|10:00 a.m. |2-Part Peak Time Rebate and Recovery of Incremental Expenditures Required for Implementation. (U39E), |

|ALJ Roscow |Commission Courtroom, San Francisco |

|Comr Peevey |(Also February 22 – 24) |

| | |

|2/28/12 |A.11-02-011 (EH) - Application of Pacific Gas and Electric Company (U39E) for Review of Entries to the Energy Resource |

|10:00 a.m. |Recovery Account (ERRA) and Renewables Portfolio Standard Cost Memorandum Account (RPSMA), and Compliance Review of Fuel |

|ALJ Roscow |Procurement for Utility Retained Generation, Administration of Power Purchase Contracts, and Least Cost Dispatch of Electric |

|Comr Florio |Generation Resources for the Record Period of January 1, through December 31, 2010 and for Adoption of Electric Revenue |

| |Requirements and Rates Associated with the Market Redesign and Technology Upgrade (MRTU) Initiative, |

| |Commission Courtroom, San Francisco |

| |(Also February 29) |

| | |

|3/5/12 |I.09-01-018 (EH) - Investigation on the Commission's Own Motion into the Operations and Practices of Southern California |

|9:30 a.m. - |Edison Company, Cellco Partnership LLP d/b/a Verizon Wireless, Sprint Communications Company LP, NextG Networks of California,|

|3:30 p.m. |Inc. and Pacific Bell Telephone Company d/b/a AT&T California and AT&T Mobility LLC, Regarding the Utility Facilities and the |

|ALJ Kenney |Canyon Fire in Malibu of October 2007, |

|Comr Simon |Commission Courtroom, San Francisco |

| |(Also March 6 – 9; March 12 – 16; March 19 – 23; March 26 – 30; and April 2 – 6) |

| | |

|3/6/12 |A.08-12-023 (EH) - In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) for a Permit to Construct |

|9:00 a.m. |Electrical Facilities with Voltages Between 50 kV and 200 kV: Presidential Substation Project, |

|ALJ Yacknin |Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA |

|Comr Florio |(Also March 7) |

| | |

|3/8/12 |C.11-05-025 (EH) - James and Marie Hughes, Kathleen Palmer, Gregory and Michelle Land, Patrick and Delores McMillen, Jeffery |

|10:00 a.m. |and Tina Strunc, and Michael and Robin Beals, Complainants, vs. Big Oak Valley Water District, Defendant, |

|ALJ Weatherford |Commission Courtroom, San Francisco |

|Comr Ferron |(Also March 9) |

| | |

|3/12/12 |R.11-02-019 (EH) - Order Instituting Rulemaking on the Commission’s Own Motion to Adopt New Safety and Reliability Regulations|

|10:00 a.m. |for Natural Gas Transmission and Distribution Pipelines and Related Ratemaking Mechanisms, |

|ALJ Bushey |Commission Courtroom, San Francisco |

|Comr Florio |(Also March 13 - 16 and March 19 - 23) |

| | |

|3/26/12 |I.11-05-028 (EH) - Order Instituting Investigation on the Commission’s Own Motion into the Operations, Practices, and Conduct |

|10:00 a.m. |of OSP Communications LLC and John Vogel, an individual, to determine whether OSP Communications LLC and John Vogel have |

|ALJ Bemesderfer |violated the Laws, Rules and Regulations of this State in the Provision of Operator and Calling Card Services to California |

|Comr Sandoval |Consumers; and Whether The Billing Resource LLC, a Delaware Corporation, and The Billing Resource LLC d/b/a Integretel, a |

| |California Corporation should Refund and Disgorge All monies billed and collected on behalf of OSP Communications LLC, |

| |Commission Courtroom, San Francisco |

| |(Also March 27 – 29) |

| | |

|3/27/12 |C.11-09-005 (EH) - Charles I. Donald, Complainant, vs. Pacific Gas and Electric Company (U39E), Defendant, |

|9:30 a.m. |Commission Courtroom, San Francisco |

|ALJ Yacknin | |

|Comr Florio | |

| | |

|4/3/12 |A.10-07-007 (EH) - Application of California-American Water Company (U210W) for Authorization to increase its Revenues for |

|10:00 a.m. |Water Service by $4,134,600 or 2.55% in the year 2011, by $33,105,800 or 19.68% in the year 2012, by $9,897,200 or 4.92% in |

|ALJ Long |the year 2013, and by $10,874,600 or 5.16% in the year 2014, and |

|ALJ Rochester |A.11-09-016 - In the Matter of the Application of California-American Water Company (U210W) for an Order Authorizing and |

|Comr Florio |Imposing a Moratorium on New Water Service Connections in its Larkfield District, |

| |Commission Courtroom, San Francisco |

| |(Also April 4) |

| | |

|4/26/12 |A.11-04-013 (EH) - Application of James L. and Marianne S. Orvis to sell, and Aspen Forest Investment Co., LLC, to buy, Five |

|10:00 a.m. |Thousand (5,000) Shares of the Common Stock of the water system known as Lake Alpine Water Company, Inc. (U148WTD) Located in |

|ALJ Wilson |Alpine County, California, |

|Comr Ferron |Commission Courtroom, San Francisco |

| | |

|4/30/12 |A.11-07-017 (EH) - In the matter of the Application of the Golden State Water Company (U133W) for an order authorizing it to |

|10:00 a.m. |increase rates for water service by $58,053,200 or 21.4% in 2013, by $8,926,200 or 2.7% in 2014; and by $10,819,600 or 3.2% in|

|ALJ Smith |2015, |

|Comr Sandoval |Commission Courtroom, San Francisco |

| |(Also May 1 – 4 and May 7 – 11) |

| | |

|5/14/12 |A.11-06-007 (EH) - Application of Southern California Edison Company (U338E) To Establish Marginal Costs, Allocate Revenues, |

|10:00 a.m. |Design Rates, and Implement Additional Dynamic Pricing Rates, |

|ALJ Roscow |Commission Courtroom, San Francisco |

|Comr Peevey |(Also May 15 - 18) |

| | |

|5/16/12 |A.11-08-014 (EH) - Application of the City of Davis to Construct one new at-grade pedestrian and bicycle crossing at the main |

|9:00 a.m. |train station platform access in the vicinity of Mile Post No. 76.0, and an emergency-access only private crossing in the |

|ALJ Yacknin |vicinity of Mile Post 76.3 of the Union Pacific Railroad Company in the City of Davis, County of Yolo, State of California, |

|Comr Florio |Commission Courtroom, San Francisco |

| |(Also May 17 and May 23 – 24) |

| | |

|5/21/12 |A.11-06-030 (EH) - In the Matter of the Application of California-American Water Company (U210W) for an Order Authorizing the |

|10:00 a.m. |Transfer of Costs Incurred in 2010 for Its Long-Term Water Supply Solution for the Monterey District to Its Special Request 1 |

|ALJ Minkin |Surcharge Balancing Account, |

|Comr Peevey |Commission Courtroom, San Francisco |

| |(Also May 22 at 9:00 a.m.) |

| | |

|5/22/12 |I.10-02-020 (EH) - Order Instituting Investigation on the Commission’s Own Motion into the closure of the Highway-Rail |

|10:00 a.m. |at-Grade Crossing at West Doran Street South of State Route 134 between San Fernando Road and West San Fernando Road, in the |

|ALJ Rochester |City of Glendale, California, DOPT Crossing No. 746804B, CPUC Crossing No. 101VY-7.99, and the Effects of that Closure on the|

|Comr Simon |City of Glendale and Nearby residents in the City of Los Angeles, California, |

| |Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA |

| |(Also May 23 - 24) |

| | |

|7/17/12 |A.10-07-007 (EH) - Application of California-American Water Company (U210W) for Authorization to increase its Revenues for |

|10:00 a.m. |Water Service by $4,134,600 or 2.55% in the year 2011, by $33,105,800 or 19.68% in the year 2012, by $9,897,200 or 4.92% in |

|ALJ Long |the year 2013, and by $10,874,600 or 5.16% in the year 2014, and |

|ALJ Rochester |A.11-09-016 - In the Matter of the Application of California-American Water Company (U210W) for an Order Authorizing and |

|Comr Florio |Imposing a Moratorium on New Water Service Connections in its Larkfield District, |

| |Commission Courtroom, San Francisco |

| |(Also July 18 - 19) |

| | |

|9/5/12 |I.11-02-016 (EH) - Order Instituting Investigation on the Commission’s Own Motion into the Operations and Practices of Pacific|

|10:00 a.m. |Gas and Electric Company with Respect to Facilities Records for its Natural Gas Transmission System Pipelines, |

|ALJ Yip-Kikugawa |Commission Courtroom, San Francisco |

|Comr Florio |(Also September 6 – 7; September 10 -14; and September 17 - 19) |

| | |

NOTICE OF ALL-PARTY MEETINGS (PU Code § 1701.3(c))

(A quorum of Commissioners and/or their staff may attend All-Party Meetings noticed on the Daily Calendar.)

NONE

................
................