Baidilu Drainage Area Rehabilitation Works

Environment Management Plan

May 2010

Contents

1,General 1

1.1 Background 1

1.2 Work content 1

1.3 Major environment protection targets 2

2,Major conclusion of environment impact appraisal (EIA) 7

2.1 Environment air EIA 7

2.2 Environment noise impact appraisal 7

2.3 Water EIA 8

2.4 Solid waste 9

2.5 Social impact 9

3,Environmental management mechanism 11

3.1 Purpose 11

3.2 Environmental management agency and responsibility 11

4,Main mitigation measures of environment protection 16

5,Environment Monitoring Plan 18

5.1 Developing Purpose and Principle 18

5.2 Monitoring item 18

5.3 Environment monitoring option 18

5.4 Environment monitoring control 20

6,Environmental protection training 23

Annex: Description of Public Participation 24

1,General

1.1 Background

Baidilu Drainage Area in Nankai District is a residential, cultural and scientific research area where research institutes, hospitals, schools and residential buildings gather, which were built many years ago. Also there are a lot of digital product malls and trading centers in Anshanxidao on the north and Baidilu in the middle of the Area. As digital market is getting hot rapidly in recent years, Baidilu is becoming the most important access road to the area.

Because of the low capacity of the current rain water pump station and because there is no rain water pump station at all in parts of the area, standing water in rainy season is a serious problem there. In a heavy rain, water depth can reach 0.3 – 0.4m, which can’t be drained in less than 8 hours. Flood there has serious impact on resident working and living.

1.2 Work content

Reconstruct upgrade rain water pipelines, pump station outlet trunks, wells, collection wells and pipes along Baidilu and roads on either side of it and realignment of some sewers;

Build a new rain water/sewage combined pump station and demolish the current temporary sewage and rain water pump stations;

Because rain water trunk construction and collection pipe and well upgrading works have strong impact on the road, the road is necessary to be rebuilt, while other roads will be structurally restored or overlain;

1-1 For major works and work quantity, see Table 1-1:

Table 1-1 Major Work Quantity

|No |Content |Unit |Quantity |Remarks |

|1 |Pipes |

|⑴ |Baidilu |m |3087 |(1)Rain pipe |

| |d300-d2400rain/sewage | | |①Demolish current d800mm; |

| | | | |②New rain trunk from Anshanxidao to pump station, d1050-2400mm, 1612m; |

| | | | |③New d300mm rain pipe, 1200m ; |

| | | | |④New outlet pressure rain pipe of d2200mm, 135m, from pump station d2200mm; |

| | | | |(2)Sewers |

| | | | |①Realignment of d800mm sewers, 140m |

|⑵ |Hanghaidao |m |690 |①Demolish current d500mm rain pipes |

| |d300-d1350 rain pipe | | |②New d800-1350mm rain pipes of 460m, from Jinhe Canal to Baidilu; |

| | | | |③Upgrade d300mm rain collection pipe, 230m |

|⑶ |Hangxingdao |m |250 |①New d600mm rain pipe, 180m, from Keyangdonglu to Baidilu; |

| |d300-d600 rain pipe | | |②New d300mm rain collection pipes, 70m; |

|⑷ |Daxuedao |m |270 |①New rain pipe, d500mm~d600mm, 200m, from Keyandonglu to Nankai University |

| |d300-d600 rain pipe | | |Gate |

| | | | |②New d300mm rain collect pipe, 70m |

|⑸ |Hangyudao |m |210 |①New rain pipe, d600mm, 140m, from Keyangdonglu to Baidilu; |

| |d300-d600 rain pipe | | |②New d300mm rain collection pipe, 60m; |

|⑹ |Hangtiandao |m |780 |(1)Rain pipe |

| |d300-d600 rain/sewage pipe | | |①New rain pipe, d600mm, 220m, Jinhe Canal – Keyanxilu; |

| | | | |②New rain pipe, d600mm, 160m, Baidilu – Nankai University wall; |

| | | | |③New rain pipe, d300mm, 200m; |

| | | | |(2)Sewer |

| | | | |①Upgrade sewer, d500mm, 200m |

|⑺ |Keyannanlu |m |555 |(1)Rain pipes |

| |d300-800 rain/sewage pipes | | |①New rain pipe, d400-d800mm, 250m, Jinhe Canal – Hangtiandao; |

| | | | |②New d300mm rain collect pipe, 100m; |

| | | | |(2)Sewers |

| | | | |①New sewer, d500mm, 205m; |

|2 |Pump station works |

|⑴ |Rain & sewage combined | |1 |A new combined rain/sewage pump station |

|3 |Road works |

|⑴ |Baidilu |m2 |39000 |①Jinhe north bridge – pump station section: overlay and renew; |

| | | | |②Pump station – Anshanxidao section: surface rebuilding; sidewalk totally |

| | | | |rebuilding; |

|⑵ |Hanghaidao |m2 |13000 |Surface structural restore and new overlay |

|⑶ |Hengxingdao |m2 |4000 |Surface structural restore and new overlay |

|⑷ |Daxuedao |m2 |15000 |Surface structural restore and new overlay |

|⑸ |Hangyudao |m2 |3000 |Surface structural restore and new overlay |

|⑹ |Hangtiandao |m2 |10000 |Surface structural restore and new overlay |

|⑺ |Keyannanlu |m2 |5000 |Surface structural restore and new overlay |

1.3 Major environment protection targets

Because project content is mainly drainage pipeline and pump station construction, the first row of residential buildings, research institutes and schools near to the construction sites are major protection targets, as in Table 1-2.

Table 1-2 Environment Protection Targets

|No |Targets |Location |Distance |Story/household(about) |Impacting factor |Noise standards |

|1 |Fenghuli 15# |East of Baidilu |20m |26 storied resident |Air and noise impact|70/55dB(A) |

| | | | |building,about 156 |by rain pipeline | |

| | | | |household |construction | |

|2 |Fenghuli 16# | |20m |26 storied resident | |70/55dB(A) |

| | | | |building,about 156 | | |

| | | | |household | | |

|3 |Fenghuli 17# | |20m |24 storied resident | |70/55dB(A) |

| | | | |building,about 144 | | |

| | | | |household | | |

|4 |Fenghuli 18# | |20m |24 storied resident | |70/55dB(A) |

| | | | |building,about 144 | | |

| | | | |household | | |

|5 |Fenghuli 19# | |20m |24 storied resident | |70/55dB(A) |

| | | | |building,about 144 | | |

| | | | |household | | |

|6 |Zhaohuli 1# | |20m |6 storied resident | |70/55dB(A) |

| | | | |building,about 105 | | |

| | | | |household | | |

|7 |Xinmingyuan 1# | |15m |6 storied resident | |70/55dB(A) |

| | | | |building,about 20 | | |

| | | | |household | | |

|8 |Xinmingyuan 4# | |15m |7 storied resident | |70/55dB(A) |

| | | | |building,about 28 | | |

| | | | |household | | |

|9 |Xinmingyuan 6# | |15m |6 storied resident | |70/55dB(A) |

| | | | |building,about 45 | | |

| | | | |household | | |

|10 |Xinmingyuan 8# | |15m |6 storied resident | |70/55dB(A) |

| | | | |building,about 60 | | |

| | | | |household | | |

|11 |Xinmingyuan 12# | |15m |7 storied resident | |70/55dB(A) |

| | | | |building,about 28 | | |

| | | | |household | | |

|12 |Xinmingyuan 14# | |15m |6 storied resident | |70/55dB(A) |

| | | | |building,about 125 | | |

| | | | |household | | |

|13 |Nankai Dormit 22 |North of Daxuedao|40m |7 storied student dormitory| |55/45dB(A) |

| | | | |building | | |

|14 |Nankai Scholar Apart |South of Daxuedao|35m |6 storied dormitory | |55/45dB(A) |

| |1# | | | | | |

|15 |Nankai Commerce |East of Baidilu |20m |Classroom building |Air and noise impact|70/55dB(A) |

| |Colledge | | | |by rain pipeline | |

| | | | | |construction | |

|16 |Xuefu Park |East of Baidilu |20m |10 storied resident | |70/55dB(A) |

| | | | |building,about90 household| | |

|17 |Tianjin Kerun |East of Baidilu |15m |Research Institute |Air and noise impact|70/55dB(A) |

| |Cucumber Institute | | | |by rain pipeline | |

| | | | | |construction | |

|18 |Hangtianbeili 1# |East of Baidilu, |15m from Baidilu |6 storied resident | |70/55dB(A) |

| | |north of |, 5m from |building,about162 | | |

| | |Hangtiandao |Hangtiandao |household | | |

|19 |Hangtianbeili 2# |North of |5m |6 storied resident | |55/45dB(A) |

| | |Hangtiandao | |building,about 4 | | |

| | | | |8household | | |

|20 |Hangtianbeili 4# |North of |5m |6 storied resident | |55/45dB(A) |

| | |Hangtiandao | |building,about 72 | | |

| | | | |household | | |

|21 |Rongqiandongli 1# |South of |5m |6 storied resident | |55/45dB(A) |

| | |Hangtiandao | |building,about72 household| | |

|22 |Rongqiandongli 22# |South of |5m from |7 storied resident |Air and noise impact|55/45dB(A) |

| | |Hangtiandao, |Hangtiandao, 6m |building,about170 |by rain pipeline | |

| | |north of pump |from pump station|household |construction; Air | |

| | |station | | |and noise impact by | |

| | | | | |pump station | |

| | | | | |operation | |

|23 |Rongqiandongli 20# |North of pump |6m from pump |6 storied resident | |55/45dB(A) |

| | |station |station |building,72 household | | |

|24 |Rongqiandongli 16# |East of outlet |6m from |7 storied resident | |55/45dB(A) |

| | |rain pipe from |pipelines, 13.5m|building,28 household | | |

| | |pump station to |from pump station| | | |

| | |Jinhe, south of | | | | |

| | |pump station | | | | |

|25 |Rongqiandongli 15# |West of outlet |6m from |7 storied resident | |55/45dB(A) |

| | |rain pipe from |pipelines, 13.5m|building,28 household | | |

| | |pump station to |from pump station| | | |

| | |Jinhe, south of | | | | |

| | |pump station | | | | |

|26 |Rongqiandongli 17# |East of Baidilu |25m from |7 storied resident |Air and noise impact|70/55dB(A) |

| | | |pipelines |building,28household |by rain pipeline | |

| | | | | |construction | |

|27 |Rongqiandongli 18# |East of Baidilu |25m from |7 storied resident | |70/55dB(A) |

| | | |pipelines |building,28 household | | |

|28 |Rongqiandongli 12# |West of Baidilu |7m from |7 storied resident | |70/55dB(A |

| | | |pipelines, |building,147 household | | |

|29 |Rongqiandongli 11# |West of Baidilu |7m from |7 storied resident | |70/55dB(A) |

| | | |pipelines, |building,147 household | | |

|30 |Nanying School |West of Baidilu |18m |School+ |Air and noise impact|70/55dB(A) |

| | | | | |by rain pipeline | |

| | | | | |construction | |

|31 |Rongqianxili 13# |West of Baidilu |18m |6 storied resident | |70/55dB(A) |

| | | | |building,90 household | | |

|32 |Rongqianxili 17# |West of Baidilu, |18m from Baidilu |6 storied resident | |70/55dB(A) |

| | |south of |, 5m from |building,90 household | | |

| | |Hangtiandao |Hangtiandao | | | |

|33 |Rongqianxili 16# |South of |5m |6 storied resident |Air and noise impact|55/45dB(A) |

| | |Hangtiandao | |building,72 household |by rain pipeline | |

| | | | | |construction | |

|34 |Rongqianxili 2# |South of |8m |6 storied resident | |55/45dB(A) |

| | |Hangtiandao | |building,60 household | | |

|35 |Rongqianxili 1# |South of |5m from |7 storied resident |Air and noise impact|55/45dB(A) |

| | |Hangtiandao, East|Hangtiandao, 5m |building,70 household |by rain pipeline | |

| | |of Keyanlu |from Keyannanlu | |construction | |

|36 |Rongqianxili 3# |East of Keyanlu |5m |7 storied resident | |55/45dB(A) |

| | | | |building,70 household | | |

|37 |Rongqianxili 5# |East of Keyanlu |5m |7 storied resident | |55/45dB(A) |

| | | | |building,70 household | | |

|38 |Rongqianxili 7# |East of Keyanlu |5m |7 storied resident | |55/45dB(A) |

| | | | |building,70 household | | |

|39 |Rongqianxili 8# |East of Keyanlu |5m |6 storied resident | |55/45dB(A) |

| | | | |building,90 household | | |

|40 |First Central |East of Keyanlu |6m |Hospital | |55/45dB(A) |

| |Hospital | | | | | |

|41 |8358 Institute of |North of |8m |Research Institute |Air and noise impact|55/45dB(A) |

| |China Space S&I Group|Hangtiandao | | |by rain pipeline | |

| | | | | |construction | |

|42 |Tianjin Special Equip|North of |13m |Research Institute |Air and noise impact|55/45dB(A) |

| |Monitor & Exam Tech |Hangtiandao | | |by sewage pipeline | |

| |Institute | | | |construction | |

|43 |Tianjin Agriculture |West of Baidilu, |18m from Baidilu |Research Institute |Air and noise impact|70/55dB(A) |

| |Science Colledge |North of |, 10m from | |by rain and sewage | |

| | |Hangtiandao |Hangtiandao | |pipeline | |

| | | | | |construction | |

|44 |Hangyu Apartment 1# |West of Baidilu, |18m from Baidilu |10 storied resident |Air and noise impact|70/55dB(A) |

| | |south of |,5m from |building,98 household |by rain pipeline | |

| | |Hangtiandao |Hangtiandao | |construction | |

|45 |Hangyu Apartment 3# |South of |5m from Hangyudao|10 storied resident | |55/45dB(A) |

| | |Hangyudao | |building,120 household | | |

|46 |Tianjin Tech Physics |West of Baidilu |18m |Research Institute | |70/55dB(A) |

| |Institute | | | | | |

|47 |Radiology Medicine |West of Baidilu |18mWest of |Research Institute |Air and noise impact|70/55dB(A) |

| |Institute of China | |Baidilu | |by rain pipeline | |

| |Medical Science | | | |construction | |

| |Academy | | | | | |

|48 |Biomedical |West of Baidilu |18m |Research Institute |Air and noise impact|70/55dB(A) |

| |Engineering Institute| | | |by rain pipeline | |

| |of China Medical | | | |construction | |

| |Science Academy | | | | | |

|49 |Longxingli 5# |North of |6m |6 storied resident | |55/45dB(A) |

| | |Hangxingdao | |building,48 household | | |

|50 |Longxingli 10# |West of Baidilu, |16m from Baidilu |6 storied resident | |70/55dB(A) |

| | |north of |,6m from |building,90 household | | |

| | |Hangxingdao |Hangxingdao | | | |

|51 |Longxingli 9# |West of Baidilu |16m |4 storied,16 household | |70/55dB(A) |

|52 |Longxingli 4# |West of Baidilu |16m |6 storied resident | |70/55dB(A) |

| | | | |building,84 household | | |

|53 |Longxingli 1# |West of Baidilu |16m |6 storied resident | |70/55dB(A) |

| | | | |building,90 household | | |

|54 |Longxingli 2# |West of Baidilu, |16m from Baidilu |6 storied resident | |70/55dB(A) |

| | |south of |,5m from |building,90 household | | |

| | |Hanghaidao |Hanghaidao | | | |

|55 |Sea Water Desalt and |South of |5m from |Research Institute | |55/45dB(A) |

| |Comprehensive Use |Hanghaidao |Hanghaidao | | | |

| |Research Institute of| | | | | |

| |State Ocean Bureau | | | | | |

|56 |Jinying Building 2# |South of |5m from |13 storied resident | |55/45dB(A) |

| | |Hanghaidao |Hanghaidao |building,406 household | | |

|57 |Longtengli 5# |North of |5m from |6 storied resident | |55/45dB(A) |

| | |Hanghaidao |Hanghaidao |building,108 household | | |

|58 |Longtengli 8# |North of |5m from |6 storied resident | |55/45dB(A) |

| | |Hanghaidao |Hanghaidao |building,108 household | | |

|59 |Longtengli 12# |North of |5m from |6 storied resident | |55/45dB(A) |

| | |Hanghaidao |Hanghaidao |building,90 household | | |

|60 |Nankai, Attached |North of |8m from |School | |55/45dB(A) |

| |School |Hanghaidao |Hanghaidao | | | |

|61 |Xindayuan 7# |North of |6m from |7 storied resident | |55/45dB(A) |

| | |Hanghaidao |Hanghaidao |building,42 household | | |

|62 |Xindayuan 6# |West of Baidilu, |16m from Baidilu |7 storied resident | |70/55dB(A) |

| | |north of |,6m from |building,42 household | | |

| | |Hanghaidao |Hanghaidao | | | |

|63 |Xindayuan 2# |West of Baidilu |16m |6 storied resident | |70/55dB(A) |

| | | | |building,108 household | | |

|64 |Xindayuan 1# |West of Baidilu |16m |6 storied resident | |70/55dB(A) |

| | | | |building,108 household | | |

|65 |Meihuli 7# |West of Baidilu |16m |6 storied resident | |70/55dB(A) |

| | | | |building,120 household | | |

Note:*Distance is the shortest distance between the protected target and construction site.

2,Major conclusion of environment impact appraisal (EIA)

2.1 Environment air EIA

(1)Construction period

There will be dust raise during construction when evacuation, backfill, demolition and transportation, loading, unloading and piling of sand, limb or other building materials are conducted for pump station and road construction, which has certain impact on air around the construction site. When protection measures are taken in comply with regulations and EIA requirements, the construction dust impact can be controlled to the lowest level.

During project construction, road reconstruction and overlay both have asphalt concretes surface. Asphalt laying produces asphalt smoke, major pollutant in which is a-BAP. Based on comparison result, through reasonable adjustment of construction plan and shortening asphalt transportation vehicle waiting time at site, there will not be obvious asphalt smoke impact on surrounding air quality and sensitive spots.

(2)Operation period

Nandaxi rain water and sewage combined pump station is designed totally underground. Enclosed collection of garbage screened by pump station rails, sand from sediment pool and pump station water collection tank controls the smell. And Odor produced there is collected with collection pipes and sent into biofiltration + active carbon devices. Based on comparison of similar odor treatment process monitoring data, smell inside of plant border will be controlled to a low level, satisfying the threshold of odor concentration 20 (non-dimensional) required in Odor Pollutant Discharge Standards of DB12/-095-95. The internal discharge reaches the standards and has no obvious impact on nearby residents (the resident building nearest to the border is 6m away).

2.2 Environment noise impact appraisal

(1)Construction period

During construction period, bulldozers, trucks, excavators in operation produce noise that will have strong impact on the site. Noise at the border is over Construction Site Border Noise Limit of GB12523-90 in different time of the day, including day and night time.

Since protection targets are close to construction site border, it is expected that during construction machinery equipment in work produces noise impacting on protection targets generally over day/night standard value in Sound Environment Quality Standards of GB3096-2008 (Category 1 and 4a). Day time construction machinery impact scope is 140m, while night time scope is 400m.

Project construction is pipe construction separated into sections. Pump station construction is mainly during day time. Therefore construction noise impact is temporary and the measures required by concerned regulations and EIA will reduce construction noise impact to the lowest.

(2)Operation period

After project completion, the main noise origin will be submerged pump in operation which will be weakened by the building and distance. North, south and east border noise impact value at night, plus current value, will satisfy the standard limit requirement in Industrial Enterprise Environment Noise Discharge Standards (Category 4) of GB12348-2008. West side day time noise values added can reach standards, while night time noise value will be over standards.

It is estimated that at Rongqiandongli 22#, 20# and 16# buildings, the night noise overlain value can satisfy requirements in Sound Environment Quality Standards (Category 1, 4a) of GB3096-2008. Rongqiandongli 15# building night time overlain value is over requirement in Sound Environment Quality Standards (Category 1) of GB3096-2008. Mainly because current background noise value monitored is high and already over standard night time value limit. But pump station noise contributes very little to the overlain value at protection targets, so that pump station operation noise will not have obvious negative impact on protection targets around it.

2.3 Water EIA

(1)Construction period

Workers’ living sewage and pressure test waste water can discharge into current sewers. Waste water from car wash and road surface can be reused after sediment. Through strict construction management, machine oil and other pollutant from the site will be controlled not to discharge into the river. Construction will have temporary damage to the soil at the north side of the bank, which will be restored after construction and will not leave negative impact to the bank. With all above measures taken, construction impact on water environment will be reduced to the lowest.

(2)Operation period

A connection control should be installed between rain water pipeline and sewage pipeline, so that initial rain water can be discharged into municipal sewage network. Rain water later on is estimated to have quality better than that required in Surface Water Environment Quality Standards (Category V), and will not have obvious negative impact on Jinhe water quality.

In this project, waste water discharged is mainly workers’ living sewage, whose total amount is 0.12m3/d, with polluting factors of pH, CODCr, BOD5, SS and NH3-N. Sewage content in this project is simple; water quality after septic-tank treatment can satisfy requirements in Sewage Comprehensive Discharge Standards (Class 3) of DB12/356-2008. Living sewage can be discharged together with sewage collected into Xianyanglu WWTP, which is a reasonable solution.

2.4 Solid waste

(1)Construction period

Solid waste in construction period consists of construction wastes, spoil and living waste which, if cleared in time, will not cause secondary pollution.

(2)Operation period

Solid waste in this project consist of mainly worker living waste, screen residue and sediment sand which can be taken away by regular solid waste collection system. Such disposal measures are feasible with no secondary pollution expected.

2.5 Social impact

Project social impact happens mainly in construction period, including impacts on transportation, office work and living. But based on construction plans, construction periods are generally 3 months. With reasonable impact lessening measures taken, the impacts can be reduced to the lowest. Besides, the impacts will disappear after construction completion.

2.5.1 Impact on transportation

Baidilu is a second level urban artery with large regular traffic. Project construction method at Baidilu is pipe-jacking, while the method adopted at surrounding roads is open-cut. Pipe-jacking construction machines have to occupy road areas and impact transportation at Baidilu for a certain period. Passing by vehicles have to avoid construction site and machines, causing lower speed and congestions.

2.5.2 Impact on office work or living

The buildings around Baidilu area are mostly research institutes, hospitals and schools with a lot of office staff and residents. Project construction will have impact on their work and life, which is:

1. Transportation impact: the traffic is mainly of office staff trips in work time and pupil and other resident trips to go to and come back from work places or schools. Main impact is that construction sites occupy roads, causing access inconvenience for people above mentioned.

(2)Impact on office work and rest: construction machinery equipment noise is strong, causing impact on people work and life around the site, especially on the first row. Further impact on people rest will be caused by noon or night operation.

(3)Impact on environment air: Project construction period is just between spring and summer, when wind is strong. There can be dust raising in construction sites where building materials and earth piles are kept, causing temporary increase of TSP concentration in the surrounding air.

3,Environmental management mechanism

3.1 Purpose

In order to ensure the implementation of various environmental protecting measures proposed in EIA and the inspection for the practice result, a science environmental management and monitoring plan should be systemically developed, so that to minimum the adverse impact caused by construction and operation of the Work in local economy, society and environment and to maximum carrying out the economical, society and environmental benefit, as well as to provide local environmental agency and concerned department with science reference for work monitoring.

3.2 Environmental management agency and responsibility

As a big difference in environmental management contents at construction and operation phase, and the difference of time order between them, the independent institution structure should be established, which will take responsibility in phased manner and withdraw after the end of the work. The management institution will start work at operation phase. It’s allowed that some time overlapping will happen according to work practices.

3.2.1Environment management agency and responsibility during construction phase

(1)Environment management responsibility during construction phase

Sketch of environment management agency during construction phase:

fig.3-1 Sketch of Environment Management Agency during Construction phase

Responsibility responding to agency is as in the following table.

Table 3-1 Responsibility carried out by agency during construction phase

|Category |Agency |Scope of responsibility |Remarks |

| |Environment unit of|Being responsible for monitoring in full course of work and put forward |A full-time EP |

|Management |WB |requirement on environment protection, following concerned requirements of |expert assigned |

|agency | |environment protection by WB | |

| |TURCCC |1.Coordinating in general design and construction of work; |Concerned |

| | |2.Taking a guide and inspection to Contractor’s environment management; |department of |

| | | |TURCCC |

| |TMCDC |1.Implementing state and TJ’s environment law, regulation and policy |professional |

| | |2.Being responsible for management of environment investment and making |management |

| | |sure the funding in place; |group(full-time and|

| | |3.Developing practice details of environment management plan; |part-time EP |

| | |4.Implementation and inspection on performance of environment mitigation |manager and EP |

| | |measures; |staff at site) |

| | |anizing to conduct environment monitoring, recording and statistic。 | |

| |TJEPB |1.According to the requirements, taking random inspection on environment |Monitoring |

|Monitoring | |protection and pollution prevention; |department |

|agency | |2.Supervising Owner’s performance of specific environment regulation and |Of EPB |

| | |standard; | |

| | |3.Coordination between departments on environment management; | |

| | |Full course monitoring on environment impact and pollution prevention |Monitoring |

| |NKEPB |mitigation, public consulting feedback and correction action at the time of |department |

| | |design, construction, completion and final inspection: |of EPB |

| | |1.Reviewing if the work meet the requirements to environment and pollution | |

| | |prevention; | |

| | |2.Monitoring Owner’s implementation of environment management plan; Auditing| |

| | |performance on environmental law, regulation and standard; | |

| | |3.Coordination between departments on environment management; | |

| | |4.Verification to environment monitoring and put forward correction measures| |

| | |and recommendations; | |

| | |anizing the final inspection of environment protection facility; | |

| | |6.指导施工环境监理工作;Making a guide to the environment monitoring of | |

| | |construction | |

| | |7.Timely feedback environment monitoring and management agency the | |

| | |information on public complaints and environment issues | |

| | |1.Work monitoring following EPB’s requirements | |

|Executive |TEMC or NEMS |missioned by management agency, conducting monitoring and assessment, | |

|agency | |submitting auditing report and put forward correction measures during | |

| | |construction phase; | |

| | |3.Conducting trace monitoring to the key point of environment quality; | |

| | |verifying and assessing the monitoring data and put forward correction | |

| | |action to the findings. | |

| | |Conducting environment management monitoring; organizing and supervising | |

| |Work supervising |Contractor’s performance of concerned environment protection clauses by | |

| |agency |Supervising agency in behalf of Owner. | |

| | |1.Reviewing Contractor’s design and organization of construction and | |

| | |environment management plan, to ensure site security, environment protection| |

| | |and civilization construction in compliance with regulation; | |

| | |2.Monitoring Contractor’s implementation of environment protection measures | |

| | |in full course; | |

| | |②Monitoring the selection procedure of construction equipments; | |

| | |③Monitoring mitigation measures in full course to noise, dust cloud, waste | |

| | |water, domestic waste and waste construction soil, slurry and inspection; | |

| | |3.Accepting the inspection and guide from environment protection department;| |

| | |4.Dealing with complaints and environment pollution incidents and developing| |

| | |resolution report; | |

| | |5.Regularly reporting Owner the auditing result and put forward targeted | |

| | |measures for the potential environment issues; | |

| | |1.Being responsible for implementation of environment management plan, |Staff assigned in |

| |Contractor |various environment protection measures and pollutant source control and |charge of air, |

| | |management at site during construction phase; |noise and solid |

| | |2.Arranging the implementation of various monitoring plans and reporting |waste |

| | |monitoring results timely; | |

| | |3.Being responsible for training course to staff and employee on environment| |

| | |management and relative respects. | |

| | |prehensively and properly coordinating about project investment, | |

| |Design institute |resources, technology and environment | |

| | |2.Design must comply with environment law, regulation, and specification and| |

| | |standard of environment engineering design; design must meet the | |

| | |requirements to environment and pollution protection in environment | |

| | |assessment and environment management plan; | |

| | |3.Effectively coordinating with Owner, supervisor and Contractor, analyzing | |

| | |the deviation in environment engineering and taking correction action to | |

| | |ensure implementation result. | |

Note: 1) Short form of TEMC and NEMS means Tianjin Environment Monitoring Centre and Nankaiqu Environment Monitoring Station;

2) NKEPB means Nan Kai EPB;

3) EP means environment protection;

3.2.2 Environment management structure and responsibility during operation phase

In order to avoid the pollution issue emerged after completion of storm and wastewater combined pump station, a specified environment administration should be established or the environment management of this work is integrated into the existing management system during operation phase.

Environment administration during operation phase is showing in following figure:

Fig. 3-2 The sketch of environment agency during operation phase

The corresponding responsibility to the agency is listing in following table:

Table 3-2 Responsibility of environment administration during operation phase

|Category |Agency | Scope of responsibility |Remarks |

| | |1. Organizing and implementing environment protection law, regulation and policies|A staff assigned|

|Management | |of nation, Tianjin municipality and sector authority and coordinating with local |in charge of |

|agency |TDD |environment agency to implement environment management soundly; |environment |

| | |2. Implementing a various regulation and decree of authorities and developing |protection |

| | |corresponding details carrying out; | |

| | |3.Regularly inspecting and maintaining pipe network and equipment of pump station | |

| | |to ensure facility running properly; taking positive and effective action to avoid| |

| | |pollution and conducting inspection on the performance and result environment | |

| | |protection measure; | |

| | |4. Commissioning and organizing concerned agency and staff to conduct environment | |

| | |protection monitoring and setting up archive system; | |

| | |5.Monitoring and statistic of discharging situation around area in coordination | |

| | |with environment protection agency; | |

| | |6.Investigation and treatment to relative pollution incident and nuisance | |

| | |disputes; | |

| | |7.Conducting regularly training course to technicians and staffs, further | |

| | |improving their ability to ensure environment protection facility running | |

| | |properly; | |

| | |1.Following requirements of environment protection, conducting a sample inspection| |

|Monitoring |TJEPB |to environment protection and pollution protection; | |

|Agency | |2.Overseeing Owner’s performance on environment management plan and supervising | |

| | |implementation of relative regulation and standard; | |

| | |3.Coordinating environment management among departments; | |

| | |Overseeing environment impacts, mitigation measures of pollution protection and | |

| |NKEPB |feedback of public complaints | |

| | |1.Monitoring pollution discharge from pump station; verifying the monitoring | |

| | |result and putting forward a mitigation recommendation; | |

| | |2.Monitoring implementation of pollution protection mitigation measure at pump | |

| | |station; | |

| | |3.Timely reporting the public complaints and environment issues to environment | |

| | |administration and supervising to get solved; | |

| | |1.Monitoring the work according to TJEPB’s requirements; | |

|Executive |TEMC or NEMS |2.Accepting commission of management agency, conducting inspection and assessment | |

|agency | |based on environment management plan and providing monitoring report; | |

4,Main mitigation measures of environment protection

Focusing on possible adverse impact, main environment protection mitigation measure taken during construction and operation phase at the pump station is listed in table 4-1~4-2.

Monitoring and management agencies for the implementation of environment protection mitigation measures are 1) TURCCC; 2) TMECC. Other agencies are TJEPB and Nankai EPB. Above-mentioned agencies will deal with complaints at any time and be under public overseeing.

Table 4-1 Table of main environment protection mitigation measures taken during construction phase

| |Environment protection mitigation measures | | |

|Impact | |Implement|Monitoring |

|factor | |ation |agency |

| | |agency | |

| |(1)Stand-up billboard at site to clearly show all relative information about Owner; |Contracto|Supervising |

|Air |①Title of Owner, Name of work leader, telephone No., Date of start-up and completion, No. of certificate of |r |agency |

|environme|Construction Permit; | | |

|nt |②Mitigation of environment protection; | | |

| |(2)Following measures should be included in the construction plan: protection pollution from spill and | | |

| |leakage, control of dust cloud and their relative cost to ensure the earmarked fund in place; | | |

| |(3)Controlling work progress and recovery and transportation of construction waste and soil timely; | | |

| |①Earth cutting and slurry produced from pipe jetting should be removed to designated location by Waste Soil | | |

| |Office of TURCC; | | |

| |②Earth and rock material transported to site when backfilling; | | |

| |③No construction earth stored at site, in order to avoid second pollution by long- time storing in open; | | |

| |(4)Strengthening management of transportation, no case to allow open vehicle to transport earth and bulk | | |

| |material at site, in order to minimum dust cloud; | | |

| |(5)Water spraying and clean-up system should be established at site of pipeline and pump station and the | | |

| |designated person to take responsibility of water spraying and cleaning work; | | |

| |(6)Earth cutting is a problem producing dust cloud. Earth cutting will likely be undertaken at condition | | |

| |of absence of strong wind weather. Earth cutting operation is prohibited at 4 and over 4 grade windy weather,| | |

| |because of amount of dust cloud. | | |

| |(7)All used is product asphalt, prohibiting to burn any waste at site. | | |

| |(8)Conducting routine check, repair and maintenance, to keep equipments running properly and reducing | | |

| |emission; | | |

| |(9)Construction requirement of pump station | | |

| |①Guard fence not low than 2m in height should be installed at all site (reaching the standard no horizontal | | |

| |gap and no vertical joint); platform and truck washing facility is equipped at entrance and exit of site and | | |

| |the person assigned to wash truck, clean gate area to ensure no mud on road by truck wheel and civilization | | |

| |in loading and unloading work. | | |

| |② Site ground should be compacted to avoid tough condition: dust cloud happens in sunny day and mud flooding | | |

| |in rainy day. | | |

| |③Layout of site is reasonably designed; material easy producing dust at yard will store with covering; | | |

| |material yard for the pump station should be located faraway from environment protection target 18-20# and | | |

| |22# building of Rongqiandongli and material stored will be covered; | | |

| |④Ready-mixed concrete is used without on-site mixing; | | |

| |(1)Possibly selecting low-noise equipment, designated person to maintain and repair routinely large-scale | | |

|Noise |equipment; to avoid numbers of high-noise equipment operating at same site and same time; as high-noise |Contracto|Supervising |

|environme|equipment running, noise barrier and noise absorbing barrier being installed at east and north side near |r |agency |

|nt |sensitive points to reduce ambient impact; | | |

| |(2)Reasonably planning work progress, trying to shorten work time to avoid long-term impact; | | |

| |(3)Prohibiting horn and whistle for the hoisting and transportation at site; | | |

| |(4)In-site diesel generator set and other equipment should be located operating room reasonably with noise | | |

| |barrier, prohibiting operation in open air. | | |

| |(5)Loading and unloading of pipe, material and equipment should be conducted carefully, prohibiting to | | |

| |cause tremendous noise by free throwing; | | |

| |(6)Reasonably planning work order should be made to ban construction producing noise at time from 22:00 to | | |

| |7:00 of next day. A written application for a permit of night construction should be submitted to the | | |

| |authority of environment protection. It’s prohibited for the night construction without permit. | | |

| |(1)Domestic and pressure testing wastewater will discharge into existing sewage. No freely spilling and | | |

|Water |dumping is allowed. |Contracto|Supervising |

|environme|(2)Run-off and truck-washing water will discharge into sedimentation tank then used for purpose of dust |r |agency |

|nt |curbing, flushing and washing; | | |

| |(3)Strengthening management in construction procedure, engine oil, slurry and other pollutant is prohibited| | |

| |to discharge into river. | | |

| |(1)Construction and domestic waste should be transported to location designated by sanitation authority; | | |

| |(2)Waste soil and mud generated by pipe jacking should be transported to designated location by Waste Soil |Contracto|Supervising |

|Solid |Office of TURCCC; |r |agency |

|waste |(3)Solid waste during construction phase should be stacked in concentration and transported timely; | | |

| |(4)Strengthening management in construction procedure, no solid waste is allowed to dump into Jin river. | | |

| |(1)Making public awareness through media: the road is closed temporally by construction and proposed | | |

|Communica|by-pass route; |Contracto|Supervising |

|tion |(2)Billboard will be installed at location entering and around Baidi Road to guide vehicles bypassing in |r |agency |

| |advance; | | |

| |(3)Reasonably arranging truck route and time, construction transportation vehicle, especially heavy | | |

| |vehicle, should follow the regulation of concerned authority, setting trucking route and time and banning | | |

| |night transportation. | | |

|Office |(1)Trying to avoid construction at time (12:00 – 14:00) and at night (22:00 – 6:00 next day); If needing to|Contracto| |

|and |work at above-mentioned time, the resident affected by ongoing work should be informed to minimize affecting |r |Supervising |

|Residence|living and job. | |agency |

| |(2)Reserving access for worker and other people; | | |

| |(3)Locating material and equipment yard faraway from office and resident area, to minimize adverse impact | | |

| |from dust and noise of construction; | | |

Table 4-2 Table of main mitigation measures during operation phase

| |Environment protection mitigation measure |Implementation | |

|Impact | |agency |Monitoring |

|factor | | |agency |

| |(1)Odor produced from grid room, intake tank and other equipments at pump station will| |TDD |

|Air |be collected by a duct, leading to the equipment of bio-filter plus absorption of |TDD | |

|environment |activated carbon, where it is treated and emitted into air after in compliance with | | |

| |standard. | | |

| |(2)Regularly inspecting bio-filter plus absorbing equipment of activated carbon, to | | |

| |ensure de-odor equipment running normally; | | |

|Water |(1)In order to avoid the pollution of surface water by initial rain water, initial | | |

|environment |rain water collected by pump station at first 5 minutes will be discharged into |TDD |TJEPB or NKEPB |

| |municipal sewage pipeline network through diversion pipe of waste water pump station. | | |

| |(2)Domestic waste water at pump station will discharge into municipal sewage after | | |

| |precipitation in septic tank. | | |

|Noise |(1)Low-noise model of equipment will be selected to ensure noise source lower than | |TDD |

|environment |85dB(A); |TDD | |

| |(2)Independent equipment room in pump house and noise barrier door will be built with | | |

| |noise absorbing material to ensure sound insulation not less than 30dB(A); | | |

| |(3)Submerging pump should be installed with vibration base and joint of pipeline with | | |

| |cushion to lower noise source. | | |

|Solid |Screen residue and grit will be packed with domestic waste and regularly cleared and | | |

|waste |transported by local sanitation agency. |TDD |TDD |

5,Environment Monitoring Plan

5.1 Developing Purpose and Principle

The purpose developing a environment monitoring plan is to monitor the implementation of various mitigation measures; to adjust accordingly environment protection plan based on monitoring result and to provide the reference for implementation time and option of environment protection measures. The principle developing a plan is based on main impacts projected at different time period in construction and operation.

5.2 Monitoring item

Monitoring items are main environment impact during construction and operation phase. Main impacts during construction phase are TSP and constructive noise, while odor and noise during operation phase.

5.3 Environment monitoring option

Environment monitoring option at construction and operation phase will be developed based on the feature of different engineering item, which listed in table 5-1.

Table 5-1 Construction and Operation Period Environment Monitoring Plan

|Type |Item |Phased Monitoring Plan |

| | |Construction period |Operation period |

|Environme|Pollutant origin |Dust |Pump station |

|nt air | | | |

| |Factor |TSP |odor concentration |

| |Standards |Quality |GB3095-1996 |- |

| | | |《Environment Air Quality Standards》 | |

| | |Discharge |- |DB12/-095-95 |

| | | | |Odor Pollutant Discharge Standards |

| | | | |Odor concentration 20 (dimensionless) |

| | |Monitor |TSP-Weight method |3 spot comparison odor bag method |

| | | |GB/T15432-95 |GB/T14675-1993 |

| |Monitor spot |3 spots along pipeline & near sensitive |3 spots: outside of plant border, downwind |

| | |targets; |direction, highest odor concentration, and |

| | |around pump station borders |another spot for reference: outside, upwind |

| |Monitor time & |2 times during construction period, 2 days |Sample taken at the moment of strongest odor, |

| |frequency |each time, once am & once pm. |2 times each summer, 2 days each time, 2 times|

| | | |each day |

| |Implement party |Entrusted to Tianjin Environment Monitoring |Entrusted to Tianjin Environment Monitoring |

| | |Center or Nankai District monitoring station |Center or Nankai District monitoring station |

| |Responsible party |TMECC |Tianjin Drainage Department (TDD) |

| |Monitor party |WB, TEPB, Nankai Dis. EPB |TEPB, Nankai Dis. EPB |

|Noise |Pollutant origin |Construction machinery noise |Pump station noise |

| |Factor |LAeq(dB) |LAeq(dB) |

| |Standards |Quality |GB3096-2008 |GB3096-2008 |

| | | |Sound Environment Quality Standards |Sound Environment Quality Standards |

| | |Discharge |GB12524-90Pump station construction site |GB12348-2008-Industrial Enterprise Within |

| | |Standards |follows Construction Site Within Border Noise |Border Environment Noise Discharge Standards |

| | | |Limit; |(Category 4) |

| | | |At first row sensitive spots at Baidilu, Sound| |

| | | |Environment Quality Standards (Category 4a) of| |

| | | |GB3096-2008 is adopted; for other sensitive | |

| | | |spots, Category 1 | |

|Type | |Monitoring standards |

| | |Construction period |Operation period |

|Enn noise|Implement |Mesurement|Within site: GB12524-90 Construction Site |GB12348-2008 |

| |standars |standards |Within border Noise Monitoring Method; At |Industry Enterprise Within Border Environment |

| | | |sensitive spots: GB3096-2008 |Noise Discharge Standards |

| | | |Sound Environment Quality Standards | |

| |Monitor spot |3 sensitive spots, out of window, 1m away from|1m away from plant border (pump in operation) |

| | |site border & roads along pipeline | |

| |Monitor frequency |(1)If entrusted to an environment monitor |Once a year, 2 days, once in daytime and once |

| | |agent, once at the busy construction period, |at night |

| | |last for 2 days, once at daytime, once at | |

| | |night; | |

| | |(2)If done by oneself, it is motored from | |

| | |time to time, based on work progress, with a | |

| | |portable noise tester | |

| |Implement party |(1)Entrusted to Tianjin Environment |Entrusted to Tianjin Environment Monitoring |

| | |Monitoring Center or Nankai District |Center or Nankai District monitoring station |

| | |monitoring station | |

| | |(2)自行测定Self monitoring | |

| |Responsible party |TMECC |TDD |

| |Monitor party |WB, TEPB, Nankai Dis. EPB |TEPB, Nankai Dis. EPB |

|Water |Pollutant origin |—— |Sewage and rain water within collection scope |

|environme| | | |

|nt | | | |

| |Factor |—— |Determined by local environment authorities |

| |Stand|Quality |—— |—— |

| |ards | | | |

| | |Discharge |—— |DB12/356-2008 |

| | | | |Sewage Comprehensive Discharge Standards, |

| | | | |Class 3 |

| | |Monitor |—— |Based on monitoring factors |

| |Monitor spot |—— |Pump station outlet |

| |Monitor frequency |—— |Determined by local environment authorities |

| |Implement party |—— |Determined by environment authorities |

| |Responsible party |—— |TDD |

| |Monitor party |—— |TEPB, Nankai Dis. EPB |

|Solid |Pollutant origin |Living garbage, construction waste, spoil |Screen residue, sediment sand, living garbage |

|waste | | | |

| |Standards |Cleared in time |Cleared in time |

| |Responsible party |TMECC |TDD |

| |Monitor party |WB, TEPB, Nankai Dis. EPB |TEPB, Nankai Dis. EPB |

5.4 Environment monitoring control

based on the project construction characteristics, considering similar work operation management experiences and environment management system (ISO14001)requirements, Owner should prepare environment monitoring programs, contents of which should be as following:

① Set up specified environment management organizations, with budget and staff ensured

② Based on construction plan and specific content in this report, prepare project environment management regulations, environment plans, training plans and pollution control measures.

③ Organize trainings according to training plans to ensure all staff’s sense of environment, operation capacity, including the skill training to take pollution control measures above mentioned.

④ Clearly assign tasks, specify responsibility for each person and conduct daily management according to plans ( including site inspections), so as to conduct monitoring and controlling of the proposed project.

⑤ Set up good information communication channels, especially for effective response to potential resident complains.

⑥ Organize relevant unit regular monitoring according to monitoring plans and to submit monitoring results to relevant authorities.

⑦ Correct promptly environment regulation violation or neighborhood disturbance during construction or operation. Prepare prevention measures and mend management methods when necessary to meet requirements of specific situations.

⑧ Remain good important environment management records, such as monitoring reports, resident complains and notes for environment violation correction with time limits.

⑨ Environment management institutes review implementation regularly and prepare environment monitoring reports of the proposed projects and submit them to concerned authorities. Based on the review comments by environment management authorities and the possible resident complaints and improve environment management monitoring procedures for a better environment management.

5.5 Environment monitoring report

Baidilu trunk construction period is May – Aug, 2010. Roads around Baidilu construction period is Aug. – Oct, 2010. Pump station construction period is May – Dec, 2010. It can also be divided into parts as: pump station underground, pump station aboveground, Baidilu current pipeline removal, new pipe laying, pipe laying for roads around Baidilu. According to requirements by China construction project environment management regulations and WB polices, Staged Environment Monitoring Appraisal Report should be prepared for environment authorities to make sure that all environment protection measures are being taken according to the approved environment monitoring plans, so that problems will be detected early, analyzed and summarized to control the negative impact in future.

Phased Environment Monitoring Appraisal Report should include:

➢ Implementation of environment management plans: changes in environment management mechanism, main content of construction in this phase, implementation of remedy measures, problems and reasons and next step improvement measures;

➢ Environment monitoring result and data: brief explanation of the data, expressing problems and failures to reach standards, analysis and correction measures. Resident complaint and solutions should be included when necessary;

➢ General comments and conclusions on environment management plan implementation and recommendations and plans for next half year.

When the proposed project is put into operation, Environment Monitoring Appraisal Report (generally twice a year) should continue to be prepared. Contents of it should include: environment management institute structures and changes, previous report review comment execution, monitoring regulations (time, interval, spot, meters and equipment used, standards adopted, etc, data statistic and analysis result, future pollution prevention measures, etc.

5.6 Environment monitoring cost

Annual monitoring cost, both in construction and operation period, is RMB115 thousand. For details, see the table below:

Table 5-2 Project Monitoring Cost, Construction Period and Operation Period Unit: RMB10 thousand

|Project |Monitor period |Environment air |Noise |Total |

|Baidilu Drainage |Construction |3.5 |3 |6.5 |

|Rehabilitation | | | | |

| |Operation |4 |1 |5 |

|Total |7.5 |4 |11.5 |

6,Environmental protection training

In order to smoothly and effectively implement this project, the staff (including construction personnel etc.) must be trained on the environmental protection knowledge and skill except for explaining importance of the proposed works and significance of implementation to the staff. Also the staff for working on different posts should be trained involving on different aspects. The training patterns are according to the environmental protection demands of the different phases. See the detailed training plan table 6-1 .

表6-1 Table 6-1 Training Schedule

|Trainees |Training content |Training pattern|People |Training Time |Cost (Million |

| | | |Number |(day) |Yuan) |

|Construction contractor, |Environment management plan, |Domestic |25 |3 |15 |

|construction personnel, |environment protection rules, |training | | | |

|supervisor, environment |construction plan, and environment | | | | |

|management personnel of |monitoring standards and | | | | |

|owner |specifications | | | | |

| |Ambient air monitoring and control |Domestic |4 |4 | |

| |technology, noise monitoring and |training | | | |

| |control technology | | | | |

|Environmental management |Environment management plan, the |Domestic |4 |10 |7 |

|personnel of environmental |advantaged environment experience |training | | | |

|protection department in |oversea, odor, noise and sound | | | | |

|operation period |control patterns | | | | |

| Total |33 |17 |22 |

Annex: Description of Public Participation

1. The purpose and significance of public participation

According to Environment Impact Assessment Law of The People's Republic of China and the Order No. 253 1998 of State Council, and the Regulation for the Order No.58 2004 Tianjin Municipal Government, public participation is an important matter of the environment assessment. It is a kind of 2-way exchange between owner or environment assessment agent and the public, and an important means to coordinate and judge construction project for social and environmental impact. The purpose and function for public participation mainly show below:

⑴ To make the public understand and accept a project, so as for the project to have better environmental and economical benefit.

⑵To make the public understand environment impact caused by the works. It is important means to coordinate construction and social impact.

⑶To make the public understand mitigate measures of environment impact, confirm rationality and maneuverability of environment protection measures.

⑷ To provide opportunities for the public to put their opinions, to provide views and demands to the project, so as to actually protect the public benefits and enhance quality of environment decision-making with public judgment.

⑸ To accept the public scrutiny

2. Contents and patterns of the public participation

According to Temporary Methods for Public Participation in Environment Impact Assessment (EIA) published by the State Environment Protection Agency and imposed on March 18, 2006. Therefore the EIA refers to the Regulation of Temporary Methods for the public participation. The public survey was conducted through questionnaire and exposure at website.

2.1 Surveyors and sampling

The respondents are residents and staff near the scope of the project construction. The questionnaire should go through statistics and analysis to have public opinions, suggestions and recommendations.

Table 2-1 Public Participation Survey

|Basic status |

|Name | |Sex | |Unit name | |

|Age | |Occupation | |Nature | |Unit in charge | |

|Education | |Main business | |

|Residence address | |Unit address | |

|Basic views |Is construction of this project beneficial to|Advantage□ Disadvantage□ No impact□ |

| |the overall condition improvement of the area| |

| |you are in? | |

| |Do you think this project can promote the |Promoting□ Hindering□  No impact□ |

| |area economic development? | |

| |Do you think the construction of this project|Advantage□ Disadvantage□ No impact□ |

| |is beneficial to the overall environment | |

| |quality improvement around areas? | |

| | | |

|Impact in |What will be the major environmental problems|Noise□ Dust cloud□ Vibrating□ Construction wastes□ |

|construction |during project construction period? |Other□ |

|period | |“Other”is for: |

| |What negative impact on your work and life |Rest□ Study or work□ Trip□ Income□ |

| |will the project construction cause? |No impact□ Other aspects□ |

| | |“Other”is for |

|Impact in use |What are the current major environment |No environment pollution□ Noise pollution □Water pollution□ |

|period |problems in your area? |odor□ Other air pollution□ Other□ |

| | |“Other” is for |

| |What will be the major environment |Sound environment quality□ Air□ Ecology □ Water□ |

| |improvement after project completion. |No obvious improvement □ Other□ |

| | |“Other”is for |

| |What beneficial impact will the project bring|□ Income □ living conditions □ Living utilities □ No |

| |to you after its completion? |impact □ Other |

| | |“Other”is for |

| |What negative impact will the project bring |Income□ Living conditions□ No disadvantaged impact □ |

| |to you after its completion? |Othe□r |

| | |“Other”is for |

| |What measures do you hope to be taken to |Greening□ Ecologycompensation□ Strengthening |

| |mitigate the potential adverse impact on the |management□ Odor treatment□ |

| |project? |Other□ |

| | |“Other”is for |

|What is your overall attitude to this project? |Actively support□ Generally support□ Opposition□ Don’t |

| |care□ |

|Other comments or recommendations: |

Note: More than one answers can be chosen for one question. A negative choice must have reasons provided, otherwise the choice is invalid.

2.2 The Publication Online

According to the requirements in Notice on Temporary Methods of Environment Impact Assessment (EIA) for Public Participation of Huanfa N0.28, 2006, during preparation of EIA, twice information publicity was conducted by owner at on March 29th, and April 20th, 2010. See below:

Such information shall remain open for the whole public exposure period. The publicity contents mainly include the following: brief introduction of the construction project; summarization of the environment impact possibly caused by the construction project; policies and measures for prevention or alleviation of adverse environment impact; environmental impact statements on environmental impact assessment conclusion points and so on. No feedback by any enterprises or individuals to EIA agency or Owner was received during the information exposure period.

2.3 Survey Result, Statistics and Analysis of the Public Participation

30 questionnaires were distributed and 30 were received, all of which are valid. See Table 2-2 below for the detailed information of the questioned. Their sex, age and education are in Table 2-3. And the result is shown in Table 2-4.

Table 2-2. The Distributing Status of Survey Form for the Public Participation

|The questioned |Fenghu Li |Zhaohu |XinmingYuan |Nankai |Xuefu Garden |

| | |Li | |University | |

|Sex |Male |21 |70 |Occupat|Cadre |16 |53 |

| | | | |ion | | | |

| | | | | | Teacher |2 |7 |

| |Female |9 |30 | |Employee |12 |40 |

|Educati|Middle school |3 |10 |Age |18-29 |3 |10 |

|on | | | | | | | |

| |High school |6 |20 | |30-39 |10 |33 |

| |College degree |8 |27 | |40-49 |15 |50 |

| |University degree |13 |43 | | Above 50 |2 |7 |

Table 2-4 Survey Statistics of the Public Participation

| Question | Statistics result |

|Is construction of this | |Advantage |Disadvantage | No impact |

|project beneficial to the |Option | | | |

|overall condition | | | | |

|improvement of the area | | | | |

|you are in? | | | | |

| | People number|30 |0 |0 |

| |Proportion(% |100 |0 |0 |

| |) | | | |

|Do you think this project | Option |Promoting |Hindering |No impact |

|can promote the area | | | | |

|economic development? | | | | |

| |People number |30 |0 |0 |

| |Proportion(% |100 |0 |0 |

| |) | | | |

|Do you think the | Option |Advantage | Disadvantage | No impact |

|construction of this | | | | |

|project is beneficial to | | | | |

|the overall environment | | | | |

|quality improvement around| | | | |

|areas? | | | | |

| |People number |30 |0 |0 |

| |Proportion(% |100 |0 |0 |

| |) | | | |

|What will be the major |Option |Noise |Dust cloud | Vibrating | Construction wastes | Other |

|environmental problems | | | | | | |

|during project | | | | | | |

|construction period ? | | | | | | |

| | People number|17 |13 |0 |0 |0 |

| |Proportion(% |57 |43 |0 |0 |0 |

| |) | | | | | |

|What negative impact on |Option | Rest |Study and |Trip |Income |No impact | Other |

|your work and life will | | |work | | | | |

|the project construction | | | | | | | |

|cause? | | | | | | | |

| |People number |17 |8 |5 |0 |0 |0 |

| |Proportion(% |57 |27 |16 |0 |0 |0 |

| |) | | | | | | |

|What are the current major|Option |No environment |Noise | Water pollution|odor |Other air |Other |

|environment problems in | |pollution |pollution | | |pollution | |

|your area? | | | | | | | |

| |People number |10 |8 |6 |5 |1 |0 |

| |Proportion(% |33 |27 |20 |17 |3 |0 |

| |) | | | | | | |

|What will be the major |Option |Sound environment |Air |Ecology |Water |No obvious |Other |

|environment improvement | |quality | | | |improvement | |

|after project completion? | | | | | | | |

| | | | | | | | |

| |People number |3 |5 |0 |6 |16 |0 |

| |Proportion(% |10 |17 |0 |20 |53 |0 |

| |) | | | | | | |

|What beneficial impact |Option |Income |Living | Living utilities |No impact |Other |

|will the project bring to | | |conditions | | | |

|you after its completion? | | | | | | |

| |People number |0 |10 |18 |2 |0 |

| |Proportion(% |0 |33 |60 |7 |0 |

| |) | | | | | |

|What negative impact will |Option |Income |Living | No disadvantaged impact |Other |

|the project bring to you | | |conditions | | |

|after its completion? | | | | | |

| |People number |0 |0 |30 |0 |

| |Proportion(% |0 |0 |100 |0 |

| |) | | | | |

|What measures do you hope |Option |Greening |Ecology |Strengthening management |odor treatment | Other |

|to be taken to mitigate | | |compensation| | | |

|the potential adverse | | | | | | |

|impact on the project? | | | | | | |

| | | | | | | |

| |People number |4 |0 |16 |10 |0 |

| |Proportion(% |13 |0 |54 |33 |0 |

| |) | | | | | |

|What is your overall |Option | Actively support |Generally | Opposition | Do not care |

|attitude to this project? | | |support | | |

| |People number |28 |2 |0 |0 |

| |Proportion(% |93 |7 |0 |0 |

| |) | | | | |

The following conclusions can be drawn according to survey statistics results:

(1)The respondents are 18 to 50 years old, of whom 90% have high school (secondary school) education or above. Their occupations are mostly cadres and employees. The surveyed are mostly residents and employees of environmental protection targets around the project. According to the introduction of the project, 100% of the respondents know the project, or basically understand the situation. Nobody said he had no idea of it;

(2)For the status of major environment problems, the first is noise, mainly because the project is near Baidi Road; the second is water pollution; and the third is odor., mainly due to summer heat, it is more obvious;

(3)For the major environment problem in project construction period, 53% of the respondents think that it will be noise, and 43% of them believe it will be dust cloud pollution;

(4)For impact on work and life during the construction, 57% of the respondents think that their rest will be affected, and 27% of them think their study or work will be affected, and finally, 16% of people think their trip will be affected.

(5)For the project's major environmental improvement, 20% of the respondents think the water environment will be improved, while 17 % of them think the air will be improved.

(6)60 % of the respondents believe that the development and construction of this project will help to improve living utilities, 33% of them think that it will improve living utilities, 2 % of them think it will not affect anything;

(7)All respondents attitude is to actively support the construction projects or generally in favor of it. There was no objection to it at all.

(8)Other views and suggestions by the respondents include:

①Reasonably arranging construction time and period, to reduce the negative impact on residents.

②Strengthening management during pumping station operation to reduce the odor impact.

In summary, the project site location and construction are in line with the planning. The people surveyed generally understand and support the construction of the project. Most respondents actively support it and are basically in favor of it. No people are against it. Owner express that they respect the public views, and will strengthen the management of construction and operation, and reduce the adverse impact produced by construction and pump station operation.

-----------------------

Environment Unit of WB

(Management Agency)

TJEPB

TJEPB

Local EPB

TMECC

(Monitoring Agency)

Supervising

Agency

Design Institute

TEMC or NEMS

Contractor

(Executive Agency)

(Management Agency)

TJEPB

TDD

Local EPB

Trustee

(Monitoring Agency)

TEMC or NEMS

(Executive Agency)

[pic]

[pic]

[pic]

Figure 2-1 Public Participation at Website

The public to participate in online publicity shots

The public to participate in online publicity shots Public participation

E574 v10

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download