Contractor Management Manual 2012 - BP



USPL Contractor Management PolicyDocument Number: USPL-HSSE-F-14-MAN-001Document Location: Document and Records ManagementDocument Custodian: Contractor Management CoordinatorRenewal Date: 08/27/2025Revision No.Reason for revisionSections / Documents revisedAuthorDate1.0S&O, Exemplar, LTEntire document re-written, additions highlightedCross-functional CI team12/1/20122.0Self-Assurance, OMS conformance & User comments Numerous areas throughout the entire document; all highlightedContractor Management Coordinator 8/31/20153.0Grading criteria modifications, Establishment of contractor management operations network and contractor onboarding tool; Remove process safety management (PSM) references, including new Contractors Vetting Guidelines.Numerous areas throughout the entire documentContractor Management Coordinator08/31/2020Document ApproversRole SignatureTitleDateTim SmithApprovereMOC #1940 HSSE ManagerJohn DiendorfApprovereMOC #1940Site Procurement ManagerJohn D’AndreaAuthorizereMOC #1940USPL Head of Operations and HSSEContractor Management PolicyUS Pipeline & Logistics (USPL) shall work with qualified contractors who have demonstrated a high level of commitment and performance with regards to HSSE. Contractors are expected to perform their work consistent with the agreed to terms and conditions of their contract and, if applicable, their Master Service Agreement. Contractors shall be in conformance with all applicable federal, state, and local health, safety, and environmental laws and regulations and with USPL policies and procedures. Contractors shall employ competent people and establish and follow safe work plans, practices, and permit systems. This document is intended to provide guidance to help implement OMS Group Essential 2.5 – Working with Contractors.Purpose and ScopeThe purpose of this policy is to set forth a formal approach in the selection and retention of contractors associated with the following activities that are managed and coordinated by BP USPL; construction, maintenance, demolition, remediation, operations, manual labor and other similar work activities.This policy does not apply to contractors with no field exposure on BP premises and to uniquely qualified contractors such as Asset Operator DesigneesThis policy also does not apply to delivery services (e.g. FEDEX), third party carriers, rmation regarding Operator Qualifications for personnel performing covered tasks on DOT-regulated facilities can be found on the OQ Home Page and includes, but is not limited to, the following: OQ Plan, OQ Overview for All Affected Personnel, OQ Compliance Flow Chart, and ISNetworld training. RequirementsRequirementsSupporting Documentation1.Only Contractors meeting the Contractor Selection Requirements (CSR) as defined in this policy shall be usedSection 5.12.Contractors who do not meet the CSR shall be identified as Do Not Use in the electronic Purchase to Pay tool and shall not be awarded new work without the evaluation and approval from the Contractor Management Operations Network (CMON). Section 6.13.Any contractor who does not meet the CSR during the course of performing awarded work shall be reviewed by the CMON to determine if the contractor’s status should be changed, the contractor should stop work on the USPL job site, and/or any other necessary action should be taken.Section 6.14.Contractor employees who perform DOT Covered Tasks shall meet the Operator Qualification requirements. The contractor shall also assign their personnel to the virtual Job Site set up by USPL in ISNetworld (ISN).Section 3.2, 3.8 & 6.65.Contractor employees performing DOT Covered Tasks shall be in an anti-drug and alcohol testing pool and the contractor company anti-drug & alcohol plan shall meet Department of Transportation (DOT) requirements. This verification is performed by the National Compliance Management Service (NCMS) and reported through ISN.Section 3.2, 5.1 & 8.36.Contractors shall be informed of the electronic site where BP’s HSSE policies and procedures are available, such as ISNetworld’s BP Pipeline bulletin board and USPL’s Contractor Management websiteSection 3.2, 3.8 & 5.17.Contractors shall be required to complete and submit a Site-specific Safety, Health and Environmental plan (SSHEP) prior to work, when applicable.Section 3.2 & 6.58.Contractors shall identify sub-contractors they propose to use along with their selection criteria data in their bid or proposal and in the SSHEP, as appropriate.Section 3.2 & 6.69.Subcontractors shall meet the statistical Contractor Selection Requirements for subcontractors; otherwise approval from the CMON shall be required. Primary contractors shall manage subcontractor employees on the job site. Section 6.6 Roles and ResponsibilitiesContractor Management Coordinator (CMC)Drive continuous improvement in the performance of USPL contractors by managing, implementing, and improving the contractor management process.Evaluate new contractor information in ISN against the contractor selection requirements (CSR) upon receipt of a new Contractor Approval Request form (CARF).Identify contractors who fail to meet or maintain the statistical selection requirements as Do Not Use in the electronic Purchase-to-Pay tool.Convene and lead the Contractor Management / Operations Network (CMON). Accountable for ensuring the team has representatives from the following disciplines (at a minimum): procurement, health and safety, operations, projects, construction, and engineering. Document CMON meetings via minutes and the Contractor Variance Review Form, as appropriate. (see Attachment 1)Manage and serve as the point of contact for USPL’s ISN account.Ensure the external contractor management website is current and maintained.Maintain current USPL HSSE policies and procedures both in ISN and the contractor management external website. Communicate revisions to contractors. Develop and maintain training documentation for USPL employees regarding contractor management.Lead the process for revising this policy in accordance with the Management of Change (MOC) policy and consult with representatives from applicable disciplines to ensure consistency and accuracy. Minor changes to this policy may be made without an eMOC. Contractor Management/Operations Network (CMON)Evaluate and determine actions to be taken regarding contractors who have not met the CSR with an approved rating in ISN, or who have had an OSHA Recordable or vehicle accident on a USPL job site, or as deemed necessary by the CMON. NOTE: If the actions include requiring a safety representative on site at all times, discontinuing work with the contractor immediately, or allowing the contractor to complete current work but not use in the future, an awareness message shall be made to the USPL contractor governance board for final decision and approval. Seek 100% agreement for decisions.If full agreement is not reached, a decision will be made by a majority vote of the members (including the Convener). If 50/50 vote is garnered, the final decision shall be made by the HSSE Manager. Meet on a monthly basis or as deemed necessary by the CMC.Should suggest and review any improvements to the contractor management process. Should not be required to evaluate contractors with insurance issues or who fail to answer the acknowledgement questions in ISN. Those issues should be handled by procurement and the Contractor Management Coordinator, respectively. Person Responsible for the Contracted Work (PRCW) Identified as the person accountable for the purchase order. Typically, this would be the Project Manager or Team Leader. Accountable to:Ensure consultants and contractors receive project and site safety orientation, emergency response, and other orientation as applicable. Verify contractors involved in marine activities or using marine equipment are approved by the marine authority or their designee.Verify contractors involved in diving activities are approved by the diving technical authority or their designeeVerify specialized contractors receive the necessary USPL training.Contact the CMC when exceptions to the CSR are requested.Responsible to: Provide the contractor with information for accessing Site Technical Practice / Engineering Technical Practice (STP/ETP), standard procedures and applicable HSE policies. Prior to procurement of services:Verify the contractor, and subcontractors if applicable, meet the CSR or are approved for a variance by the CMON. Verify the contractor, and subcontractors if applicable, have Operator Qualified (OQ) employees where necessary.Verify the contractor is active and approved for use in the electronic Purchase-to-Pay tool. If not, then initiate the Contractor Approval Request Form process. NOTE: Approval for the CARF can be a member of the EPIC LT or a District Operations Manager. Review SSHEPs developed by the contractor.Verify the contractor is informed of work that involves DOT Covered Tasks requiring Operator Qualified individuals to perform such tasks.Follow the USPL Sourcing Expectations posted on the Purchase-to-Pay site and involve PSCM as appropriate. Verify that a documented post-job survey, including contractor performance, is completed and provided to PSCM when required.Head of Engineering, Projects, Inspection, and Construction Manager (EPIC)Shall provide a member(s) of organization for the CMON. Approve reinstatement of terminated contractors per Section 6.4 for EPIC-related work. Head of Operations and HSSEShall provide a member(s) of organization for the CMON.Approve reinstatement of terminated contractors per Section 6.4 for operations and maintenance-related work. HSSE Manager Shall have final decision regarding a contractor with an OSHA Recordable incident within USPL or a fatality within the contractor company.Shall be a member of the CMON.Shall provide member(s) of organization for the CMON. Should review Safety Improvement Plans for contractors on a variance.District Operations Manager (DOMs) and Control Center Manager(s)Shall serve as the operations approving authority for new Contractor Approval Request forms (CARF).Operations TLs maintain a list of fungible contractors used as follows:A list of fungible contractors should be kept in an Excel spreadsheet with the following information: Contractor Name, Service provided by the Contractor, Date(s) Service Provided on Site.Procurement and Supply Chain Management Manager (PSCM)Participate and provide a team member (if applicable) for the CMON.Shall verify the safety status in ISNetworld of a contractor prior to issuing agreements, contracts, or purchase orders.Shall monitor contractor compliance with Master Services Agreement (MSA) insurance provisions within ISN.Shall determine the most appropriate contracting option between USPL and the contractor, issue new or revised agreements, contracts, and purchase orders according to Delegation of Authority.Shall create and maintain contracts under BP policy.Shall qualify contractors based on the PSCM Supplier Qualification process for material suppliers, if applicable.Monitor strategic suppliers’ performance and take appropriate action if contractor performance requires changes to the contractor’s status. Contractor TypesPrimary Contractor Primary Contractors must be registered in ISNetworld (ISN) when the scope of work includes OQ covered tasks, tasks that require a Control of Work (COW) permit to work (PTW) (e.g. Hot Work) and/or Lock-out Tag-out (LOTO) (except for Simple LOTO).Shall acknowledge BP’s requirements in ISN as follows:They have disseminated USPL HSSE policies and BP’s code of conduct to its employees and any subcontractor it utilizes and documents such distribution.Their equipment used by themselves and/or its subcontractors (owned, leased or otherwise obtained) is fit for service.Their employees are competent and that their work shall be carried out in compliance with USPL requirements.Register with NCMS and submit their anti-drug and alcohol plan if performing any Covered Tasks requiring Operator Qualifications or performing work of any kind on a DOT jurisdictional facility.Provide appropriate qualified employees when performing specific Covered Tasks under U.S. DOT Operator Qualification regulations on BP facilities regulated by the U.S. DOT Parts 192 and ply with USPL HSSE policies and contract requirements.Follow the requirements in the development and submittal of the SSHEP.Responsible for the subcontractor’s performance, including:Submittal of subcontractor statistical data with their bid/proposal. Providing oversight when subcontractor is performing workShall develop and submit an HSSE Improvement Plan when identified by USPL as a condition of a Variance. Shall provide purchase order notification in electronic Purchase-to-Pay tool. Sub-contractorsApproved subcontractors safety statistics: 3-year OSHA TRIR <2.0EMR <1.04Fatalities = 0 for the prior 3 yearsPrimary contractors must include the above statistics in the SSHEP. If the subcontractor is a member of ISN, the statistical summary provided in ISN will be sufficient evidence. The CMON shall decide whether a subcontractor who does not meet the statistical selection requirements can be used. In the event a subcontractor has an OSHA recordable or a vehicle accident on a USPL work site, the following shall be done:Evaluation completed by CMON with recommendation of actionsNotation regarding incident made in ISN account of primary contractor and subcontractor, if in ISN.Any subcontractor who is also a primary contractor for USPL shall be required to register with ISN and held to the same CSR as the primary contractor. If the subcontractor is paid by the primary contractor, Subcontractor is not required to register with ISN unless they will be completing DOT covered tasks requiring Operator Qualified personnel. USPL has a contractual right to approve or reject any subcontractors.Fungible ContractorsFungible contractors provide general maintenance and services at USPL facilities (e.g. janitorial services, lawn maintenance) and are not required to be registered in ISN. The fungible task list is in Attachment 3. It will be updated as needed. Consult with the CMC for any changes requested to the Fungible Task List.The Asset Operator shall provide at minimum the appropriate fit-for-purpose site orientation and determine the level of oversight needed based on the level of risk for the work that will be performed. The company name, individual name and date shall be recorded on-site and require an annual renewal of the site orientation.NOTE: Fungible contractors are not vetted by the CMC and are not typically in ISN. If there is uncertainty in the level of oversight needed, the local safety coordinator should be consulted and a decision made with the Team Leader.Refer to section 5.2 for HSSE vetting requirements.Contractor HSSE Vetting GuidelinesThe following steps and flow chart provide guidance for when contractor selection requirements (CSR) must be vetted through ISNetworld or a SSHEP (e.g. not required for fungible work). At a minimum, a site orientation and ATW/PTW must be completed for all contractors before work can begin.A Primary contractor must be registered in ISNetworld (ISN) when the scope of work includes OQ covered tasks, tasks that require a COW PTW/checklist (e.g. Hot Work) and/or LOTO (except for Simple LOTO).If the scope of work does not require an OQ, COW PTW/checklist (e.g. Hot Work) and/or LOTO (except for Simple LOTO) AND is listed in the fungible work list (see Attachment 3), then the contractor is not required to be registered in ISN and the SSHEP is not required.This includes fungible work that only requires a Simple LOTO to isolate and de-energize the energy source (e.g. single circuit breaker to disconnect power)A site orientation and ATW/PTW must be completed for all fungible work.If the scope of work is NOT in the fungible work list, then a SSHEP is required.The fungible work list can be updated as necessary.Selection Criteria Contractor Selection Requirements for Primary Contractors (CSR)Statistics: 3-year rolling average OSHA Total Recordable Incident Rate (TRIR) NOTE: If the contractor has less than three years of data, the CMON shall review the contractor for approval. Current year Experience Modification Rate (EMR) Fatalities within last three yearsSafety Programs Have safety programs meeting OSHA requirements in accordance with the work types identified in ISNetworld.Have a driving policy when the contractor will drive on BP business or on BP sites. Safety Culture QuestionnaireAnswers to selected questions from ISN’s Master Services Questionnaire (MSQ) regarding safety, operations, and audits. Questions should be chosen by the CMC and HSSE members of the CMON. ShowstoppersIf any of the following requirements are NOT met, the contractor shall receive a D-grade:Anti-drug and Alcohol Program:If performing DOT covered tasks, National Compliance Management Service (NCMS) shall verify both the contractor anti-drug and alcohol program and quarterly MIS reports as meeting DOT requirements. For non-DOT service work, the contractor anti-drug and alcohol program shall provide testing post incident and for cause. Annual Acknowledgements Questions:Disseminated USPL HSSE Policies and BP’s Code of Conduct to its employees, personnel and any subcontractor it utilizes and documents such distribution.Equipment used by themselves and/or subcontractors (owned, leased or otherwise obtained) is fit for service.Employees are competent and that their work shall be carried out in compliance with USPL requirements.NOTE: CSR data for the division of the company being used shall be evaluated.. ScoringThe table below illustrates the scoring mechanism for each of the contractor selection requirements. NOTE: These values are also available in ISNetworld.Grade ScoringThe table below indicates the scoring criteria for the final grade in ISNetworld. NOTE: These values are also available in ISNetworld. Ariba ScoreGradeDetailsRangeApprovedAApproved for use with exceptional safety performance97 - 100ApprovedBApproved for use85 – 96.99Do Not UseCVariance required before beginning new work on USPL site.If currently working on USPL job site, can continue but shall be evaluated for a variance as soon as reasonable.75 – 84.99Do Not UseDNo new work, or continue current work, on USPL site without variance.<75HSSE VettingISN will be utilized for review of a contractor’s safety performance and the necessary safety programs based on the services they will provide on USPL work locations. The SSHEP will be utilized for review of sub-contractor safety performance (unless they are also registered in ISN).More information on Contractor HSSE Vetting can be found in section 4.4SourcingSourcing process shall be governed by the PSCM Common Sourcing Process. Minimum requirements for contractor utilization:Contractor shall be compliant with CSR.Contractor shall be qualified in accordance with the PSCM Supplier Qualification Process, if applicable.Contractor shall be issued a Purchase Order prior to work-except under Emergency Response conditions.Have an environmental program with no environmental violations involving fines for the past two years that are relative to the type of work they are being contracted to perform for USPL.Any single, or sole, sourcing of a contractor shall be documented by the PRCW and approved by the appropriate USPL Manager, Procurement Specialist and the PSCM Director.PSCM Sourcing is performed under the ‘Ways of Working’ lead by site and the respected category teams. Contractor Status TypesApprovedContractors identified as an ‘A’ or ‘B’ grade in ISNetworld are considered Approved in the electronic Purchase-to-Pay tool. Do Not Use Contractors identified as a ‘C’ or ‘D’ grade in ISN are considered Do Not Use in the electronic Purchase-to-Pay tool. Any contractor who obtains a DNU status during the course of performing work shall be reviewed by CMON for determination of variance status to determine if work may continue or discontinue. Any new work shall not be awarded to a contractor on DNU without review by CMON.Variance A contractor identified as Do Not Use may be granted a variance and used on a USPL job site for up to one-year from the variance date.Variances shall be reviewed on an annual basis until the contractor returns to compliance with the CSR.Requirements for a variance may include:Safety Improvement PlanSafety oversight during work.Job-specific Management Plans No additional requirementIf at the end of a 1-year working variance period, the contractor’s performance deficiency area has not improved, the CMON shall conduct a review to determine whether the contractor is making acceptable progress and should remain on a variance or whether to terminate the contract.If termination is the recommendation, see Section 6.4 Termination & Reinstatement. The Contractor Variance Review Form shall be used to document the variance. (See Attachment 1).A completed Contractor Variance Review Form shall be uploaded to the contractor’s account in ISNetworld by the CMC. Termination & ReinstatementTermination/SuspensionDecision to terminate and/or suspend contractor from working on USPL job site shall be at the CMON and CGB Contractor disconnection in ISN shall be made at time of termination. ReinstatementReinstatement of a contractor after termination requires authorization from the Contractor Governance Board. The following criteria shall be met before contractor reinstatement:A minimum of 12 months has passed since the contract was terminated. Meets the CSR. Meets any other site-specific prequalification criteria.Issues involved in their termination have been appropriately addressed. The contract is modified or re-negotiated, if applicable. Demonstrates its employees meet OQ requirements, if applicable.Contractor Onboarding Tool: “Working Safely at USPL”Roles Asset Operator / Asset Operator Designee (AO/AOD) is responsible to: Deliver on-site onboarding discussion, using the tool, to contractor employees on the USPL jobsite during the Permit to Work (ATW) process. Request materials (tool with and/or tool without notes and stickers) from the contractor management coordinator (CMC).Identify anyone new to the job site and ask questions regarding safety programs covered in the onboarding tool to validate knowledge and understanding.ProcessCMC shall provide materials. (See Attachment 2 for the tools.)AO/AOD shall use tool during the PTW discussion with the workforce. AO/AOD should distribute “Will you stop the job” sticker to the individual receiving the onboarding. NOTE: The intent is for the sticker to provide a visual representation that the person received the onboarding message. Not having a sticker on the hardhat, should serve as an indicator to the AO/AOD to ask the person if they have had the conversation and are aware of the requirements for Working Safely at USPL. If the person doesn’t answer in a way that satisfies the AO/AOD, the onboarding tool shall be discussed immediately.Self-AssuranceContractor audits regarding safety policies, training and implementation shall be handled via ISN, specifically the RAVS+ program. The CMC shall monitor audit scores through ISN and report major deficiencies to CMON. Follow USPL self-verification methods in order to meet OMS 2.5 Contractor Management Level 5 conformance. ReferencesBP Pipelines Contractor Management website to Work PolicyBP Code of Conduct (see PL Legal, Code of Conduct online).GRP 2.5–0001, BP Group Recommended Practice, Working with Contractors49 CFR Part 199, Drug and Alcohol Testing49 CFR Part 195, Subpart G Operator Qualification Fuels NA Contractor Onboarding PolicyISNetworldDefinitionsContractorA company who contracts to perform work in the field involving maintenance, construction or operations activities. Unless otherwise specified, the term “Contractor” applies to both primary and sub-contractors.Contractor’s employeesEmployees of the contractor and its subcontractors and vendors who perform field work involving maintenance, operations or construction activities.Contractor Management / Operations Network (CMON)Cross-discipline group to provide a standardized evaluation methodology for USPL Contractors falling below safety expectations and the contractor selection requirements. At a minimum, the network shall consist of one representative from each of the following disciplines: procurement, operations, projects, construction, health and safety. The network shall be convened by the Contractor Management Coordinator.Contractor Selection Requirements (CSR)A contactor company’s statistical OSHA data, anti-drug and alcohol program as well as safety programs based on services provided are reviewed on a regular basis to determine their grade in ISNetworld as well as their HSSE status in the electronic Purchase to Pay tool. See Section 5.1 for more details and information.Specialized contractors are not subject to CSR (Job Inspectors, Construction Managers, and Asset Operator Designees).Covered TaskAn activity that (a) is performed on a pipeline or terminal facility subject to DOT jurisdiction and (b) is an Operations or Maintenance task and (c) is required by Part 192 or Part 195 and (d) affects the operation of integrity of the pipeline.DOT Operator QualificationAn individual who has been evaluated and is able to perform activities identified as Covered Tasks and responds to abnormal operating conditions that may be encountered while performing these activities.Field workOperations, maintenance, or construction activities performed on BP USPL assets and facilities and at a non BP USPL controlled premise where the work is under the direct control, supervision and contract with USPL as may be the case in third party terminals, refineries, tank farms or green fields.Fungible ContractorsFungible contractors provide general maintenance involving low risk and services at USPL facilities that are managed locally (e.g. janitorial services, lawn maintenance and are not required to be registered in ISN. USPL also defines Fungible Tasks, which can be found at the bottom of the document.ISNetworldISN is a web-based contractor database that helps owners and suppliers satisfy governmental and owner-specific recordkeeping and management requirements. ISN is the USPL “office of record” for confirmation of operator-qualified contract personnel. ActivityThe procurement, chartering or contracting, selection, inspection, approval, vessel operation, commercial operation, scheduling, design, construction, commissioning, and / or disposal of marine vessels (but excluding the ‘mission systems’, e.g., diving systems on diving vessels); and the floating structure or marine systems of a floating production and / or storage unit; and the operation of, and equipment associated with, the ship to shore interface of marine terminals including single buoy or single point moorings. MSA contractorAn approved contractor working under a Master Service Agreement.National Compliance Management System (NCMS)NCMS reviews alcohol and drug testing programs from contractors performing U.S. DOT Covered Tasks and advises whether the plan and its implementation are in compliance with the DOT PHMSA pipeline safety regulations 49 CFR Part 199 and Part 40. contractorNon-MSA contractors which may be used “one-time”, for “one-off”, unique, or specialty services, or commonly used “lower risk” work that does not warrant an MSA. These contractors are governed by Terms & Conditions in the Purchase Order.Person Responsible for Contracted WorkUSPL employees such as, but not limited to, Project Manager, Project Engineer, Team Leader, or Technician who hire contractors to perform field work. Primary contractorCompany retained to execute a scope of work and direct billed by USPL.Procurement & Supply Chain Management (PSCM)The strategic management of the supply base, to include supplier selection, commodity strategies, supplier qualification, and performance management. Additionally, the complete financial process of obtaining goods and services, from preparation and processing of a requisition through to receipt and approval of the invoice for payment.Program Deficiencies Contractor who meets the statistical and anti-drug and alcohol program selection requirements but are missing or have deficiencies in the safety programs required for the services they have identified they perform. Purchase to Pay SystemThe process, activities, systems, and information flow associated with the purchasing of goods and services from suppliers. The BP Business Service Center owns the requisition and purchase order processes and is responsible for these activities, and manages all payment processes. Ariba P2P Pro is the current database of contractors used to implement the Purchase to Pay process.RAVSRAVS is a safety compliance standard that stands for “Review and Verification Services”. It is used by ISNetworld to verify documents, safety protocols and policies. RAVS+ is an audit of contractors’ policies and documents and its effectiveness with the purpose to track contractor company’s safety compliance. Specialized ContractorSpecific individual(s) from a contracting company who perform work at a site(s). Examples are Job Inspectors, Construction Managers or Asset Operator Designees for control of work support.Sub-contractorA non-BP entity retained to perform an operations or engineering scope of work under the direction of the primary contractor.Variance Allows contractors who do not meet CSR to be considered for contract work. Decided by the Contractor Management Operations Network. Appendix 1Forms and TemplatesContractor HSSE Improvement Plan Template (located on DRM in the folder with the Contractor Management Policy)USPL New Contractor Approval Request Form (CARF) and Instructions (located on DRM in the folder with the Contractor Management Policy)Site Safety, Health and Environmental Plan Procedure, Guide and Template (located on DRM in the folder with the Contractor Management Policy)Contractor HSSE Vetting Guidelines “Fungible Task List” (mentioned in Section 4.4. Also available in DRM)Attachment 1Contractor Variance Review Form\sAttachment 2Contractor Onboarding ToolAttachment 3Fungible Task List ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download