Archived Construction Variances Requested
Published: July 2015
Variances Requested - Construction
Part number and rule number from which variance is requested RULE R408.40115, Rule 115 (4) & (5) and R408.41113, Rule 1113 (5) (6) (8) & (14), and R408.41140, Rule 1140
Summary of employer's request for variance To allow employee to paint steel lattice and pole tower ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2015 painting season.
Name and address of employer Location for which variance is requested
Morris Painting Inc Various locations in the International Transmission Co
Territory located in Michigan.
Published: July 2014
Variances Requested - Construction
Part number and rule number from which variance is requested RULE R408.40115, Rule 115 (4) & (5) and R408.41113, Rule 1113 (5) (6) (8) & (14), and R408.41140, Rule 1140
Summary of employer's request for variance To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2012 painting season.
Name and address of employer Location for which variance is requested
Morris Painting Inc Various locations in the International Transmission Co
Territory located in Michigan.
Part number and rule number from which variance is requested Rule 1926.602 Part 13-Mobile Equipment
Summary of employer's request for variance To allow employer to operate a CAT 304C and 303C without the Roll over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided the following stipulations are adhered to:
Name and address of employer Location for which variance is requested
Eagle Excavation U of M West Quad Hall, Ann Arbor
Hardman Construction U of M West Quad Hall, Ann Arbor
Part number and rule number from which variance is requested R408.41065a (1), R408.41065a (2) and R408.41072a (15), Part 10 - Lifing and Digging Equipment
Summary of employer's request for variance To allow the use of a temporary personnel hoist systems to transport workers, tools, and materials to and from elevated worksites in a personnel cage during chimney construction work provided employer comply with all the requirements set forth in the OSHA chimney-related permanent variance published in the Federal Register as Number 2013-23625 on October 2, 2013 and all the requirements of Construction Safety Standard, Part 10, Lifting and Digging Equipment except for Rules 1065a (1), 1065a (2) and 1072a (15) which are met as follows
Name and address of employer Location for which variance is requested
International Chimney Corporation DTE Energy, Monroe Power Plant, 3500 East Front Street, Monroe, MI 48161
Published: April 2014
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms, R4084.3216 (3) & 3216(4)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach due to overhead obstructions to complete the installation and finishing of a metal stud and drywall partition provided the following stipulations are adhered to
Name and address of employer Location for which variance is requested
Conti Mechanical GM Powertrain, Engineering Lab, Pontiac
Conti Fire Protection GM Powertrain, Engineering Lab, Pontiac
Motor City Electric Co GM Pontiac Powertrain Center, General Motors.
Pontiac Ceiling & Partition Co., LLC Cobo Hall, Detroit
Rival Insulation LLC Cobo Center Phase II, Southside Renovations,
Detroit
Superior Electric Great Lake Co., GM Proving Grounds, Milford
Published: December 2013
Variances Requested - Construction
Part number and rule number from which variance is requested
PART: 32 – Aerial Work Platforms R408.43216; Rule 3216 (3) & Rule 3216 (4)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach due to overhead obstructions
Name and address of employer Location for which variance is requested
CONTI CORPORATION Consumers Energy, Karn Weadock Power Plant, Essexville
MOTOR CITY ELECTRIC CO GM Warren Technical Center Campus Design Dome Renovation Project, Warren
NATIONAL MAINTENANCE GM Proving Grounds (Data Center Project), Milford
SERVICES, LLC
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach due to overhead obstructions
Name and address of employer Location for which variance is requested
CARRIER CONSTRUCTION Western Michigan University School of Medicine,
COMPANY, INC Kalamazoo
CASADEI STEEL INC GM Data Center, Proving Grounds, Milford
PRO SERVICES INC WMU School of Medicine, Kalamazoo
Published: July 2013
Variances Requested – Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 KV to 345 KV in the International Transmission Company territory located in Michigan.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Company Territory located in Michigan
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41213; Rule 1213 (1)
Summary of employer's request for variance
To allow employer to use a warning line system in addition to the designed guardrail of a SafeSpan scaffold under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Seaway Painting, LLC Mackinac Bridge over the Straits of Mackinac, Mackinaw City
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: R1926.602; Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate a CAT 304C and 303C without the Roll over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Eagle Excavation U of M South Quad Hall Renovation Project, Ann Arbor
Hardman Construction U of M South Quad Hall Renovation Project, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company U of M Institute for Social Research Addition, Ann Arbor
Consumers Energy D.E. Karn, Essexville
Dee Cramer GM Pontiac – Hydrogen, Pontiac
U of M South Quad, Ann Arbor
Consumers Energy De-Karn Plant, Essexville
Edwards Glass Co. U of M Institute for Social Research Addition, Ann Arbor
JM & Sons Plumbing Co. U of M GG Brown Engineering Lab, Ann Arbor
John E. Green Company U of M Institute for Social Research Addition, Ann Arbor
Michigan Automotive Compressor Inc., Parma
Limbach Company LLC Western Michigan University School of Medicine, Kalamazoo
SCI/Steelcon WMU Medical School, Kalamazoo
Superior Electric GM Powertrain Facility, Pontiac
Turner Brooks Pfizer Building, Kalamazoo
Western Mechanical Contr. Inc. Cobo Center Phase II Southside Renovations, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
CA Hull/Hardman Construction JV US 231 over the Grand River, Nunica, & Grand Haven
Hardman Construction JH Campbell Plant Intake/Discharge Channel, West Olive
US 131 over the St. Joseph River, Constantine
Milbocker & Sons, Inc. M-222, Allegan
Slagter Construction I-196 at Market St., Grand Rapids
Published: April 2013
Variances Requested – Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
ANM Construction Company St. Mary Mercy Momentum 2012, Livonia
Acoustic Ceiling & Partition Co. St. Joseph Mercy Oakland, Pontiac
Barton Malow Company St. Joseph Mercy Oakland Hospital – Campus Regeneration Project, Pontiac
Crittenton Hospital – Cornerstone South Tower Project,
Rochester Hills
Brinker Team Interiors Detroit Receiving Hospital, Detroit
1 Woodward Blvd., Floors 3, 4, 5, 7, 8, & 9, Detroit
Quicken Loans, Troy
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company St. Joseph Mercy Oakland Hospital – Campus Regeneration Project, Pontiac
Crittenton Hospital – Cornerstone South Tower Project, Rochester Hills
De-Cal, Inc. COBO Arena, Detroit
Denn-Co Construction Inc. Detroit Medical Center Cardiovascular Institute Multispecialty Building, Detroit
Dobson Industrial Warren Transmission GFE Project, Warren
FM Sylvan, Inc. GM – Powertrain Facility, Pontiac
Interstate Fire Protection Inc. General Motors Transmission, GFE Project, Warren
John E. Green Company Sparrow Hospital – Main Campus Tower, Lansing
Kruse Construction Inc. GM Warren Transmission, GFE Project, Warren
LaSalle General Contractors GM Warren Transmission, GFE Project, Warren
National Maintenance Services GM Pontiac Powertrain, HQ (Fuel Cell Construction Site), Pontiac
Partlan-Labadie Sheet Metal Co. GM Warren Transmission, GFE Project, Warren
R. L. Bondy Insulation Inc. Crittenton Hospital Medical Center, Rochester Hills
URS Corporation DTE Monroe Power Plant FGD & SCR Projects, Monroe
Ventcon Inc. COBO Arena/Atrium, Detroit
Western Mechanical Contractors St. Joseph Mercy Oakland South Patient Tower & Regeneration, Pontiac
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davis Construction Cleveland St. over Grand River, Ionia County
Published: October 30, 2012
Variances Requested – Construction
Part number and rule number from which variance is requested
Part 10 – Lifting & Digging Equipment: R408.41005a (2), Rule 1005a (2): Reference ANSI Standard B30.5 Mobile and Locomotive Cranes, 1994 Edition, Section 5-3.2.1.2b.
Summary of employer's request for variance
To allow employer to rig certain loads to the load line of a crane above the overhaul weight in accordance with certain stipulations.
Name of employer Location for which variance is requested
Wm. Crook Fire Protection Co. Ford Motor Company, Dearborn Stamping Plant, Dearborn
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition, Inc. Monroe Community College, Monroe
ANM Construction Company Lincoln High School Performing Arts, Ypsilanti
Barton Malow Company Varsity Ann Arbor Project, Ann Arbor
Brinker Team Interiors Lambert Edwards Associates, Detroit
Price Waterhouse & Cooper Project, Detroit
Mid Thumb Contracting Group McKinley Elementary School, Warren
North American Construction Ent. McKinley Elementary School, Warren
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
De-Cal, Inc. GM Powertrain, Warren
John E. Green Company General Motors Tech Center, Warren
Hoyt, Brumm & Link Inc. General Motors Power Train Facility, Pontiac
Ventcon, Inc. St. Joseph Mercy Oakland Campus Regeneration Project, Pontiac
Published: July 27, 2012
Variances Requested – Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and
R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2012 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Co. territory
Part number and rule number from which variance is requested
Part 10 – Lifting & Digging Equipment: R408.41005a (2), Rule 1005a (2): Reference ANSI Standard B30.5 Mobile and Locomotive Cranes, 1994 Edition, Section 5-3.2.1.2b.
Summary of employer's request for variance
To allow employer to rig certain loads to the load line of a crane above the overhaul weight in accordance with certain stipulations.
Name of employer Location for which variance is requested
Wm. Crook Fire Protection Co. Chrysler Sterling Heights Assembly Plant, Sterling Heights
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition, Inc. University of Michigan East Quad, Ann Arbor
Washtenaw Comm College Student Center Renovation, Ann Arbor
Barton Malow Company Chrysler GLBC, Detroit
University of Michigan Crisler Arena Project, Ann Arbor
North American Construction Ent. Huron Park Elementary, Roseville
L’Anse Creuse North High School, Macomb
Ritsema Associates Spectrum Health United Memorial Hospital, Greenville
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate mobile equipment without the Roll Over Protection system (ROPS) provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Eagle Excavation Inc. U of M East Quad Hall Renovation Project, Ann Arbor
Hardman Inc. U of M East Quad Hall Renovation Project, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company DTE GO – 9th Floor Auditorium Restoration Project, Detroit
University of Michigan Crisler Arena Project, Ann Arbor
Dee Cramer, Inc. Crittenton Hospital Medical Center, Rochester Hills
John E. Green Company Crittenton Hospital, Rochester Hills
Moote Electrical, Inc. Crittenton Hospital Cornerstone Tower Addition, Rochester
Shaw Electric Company University of Michigan Chrysler Arena Expansion, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Anlaan Corporation Blue Star Highway Bridge over Kalamazoo River, Douglas
Milbocker & Sons, Inc. Kalamazoo County River Road, Comstock
Published: April 27, 2012
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting & Digging Equipment: Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Summary of employer's request for variance
To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevated work areas in a manner that exposed employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Name of employer Location for which variance is requested
Pullman Power LLC St. Clair Power Plant, East China Twp.
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41213, Rule 1213 (1)
Summary of employer's request for variance
To allow employer to use a warning line system in addition to the designed guardrail of a SafeSpan scaffold under controlled conditions and according to certain stipulations. The SafeSpan guardrail does not meet the requirements of Part 12.
Name of employer Location for which variance is requested
Seaway Painting, LLC Ambassador Bridge over the Detroit River, Detroit
Walter Toebe Construction Co. Ambassador Bridge over the Detroit River, Detroit
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition, Inc. Chelsea Community Hospital Addition, Chelsea
Costco, Ann Arbor
Sterling Contracting, Inc. Broderick Tower, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Buist Electric Target Store Remodel Project, Walker
Dee Cramer, Inc. Lincoln High School Performing Arts, Ypsilanti
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davis Construction Lansing Board of Water and Light, Lansing, MI
Milbocker & Sons, Inc. M-223 over the Raisin River, Lenawee County
Published: February 3, 2012
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition, Inc. Oakland University Campus, Rochester
Barton Malow Company St. Mary Mercy Hospital Southwest Addition, Livonia
Children’s Specialty Center Detroit Medical Center, Detroit
BLUnite Project, Detroit
U of M NCRC Building #16 Project, Ann Arbor
Brinker Team Interiors First National Building, Detroit
Finney Crockett High School, Detroit
Jasman Construction Greenleaf Trust Building, Birmingham
Ritsema Associates Western Michigan University, Kalamazoo
Turner Brooks Western Michigan University, Kalamazoo
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Conti DMC Pediatric Specialty, Detroit
John E. Green Company Chelsea Hospital Project, Chelsea
Published: October 24, 2011
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: R1926.602; Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate mobile equipment without the Roll Over Protection system (ROPS) provided stipulations are adhered to
Name of employer Location for which variance is requested
Eagle Excavation, Inc. U of M Alice Lloyd Hall Renovation Project, Ann Arbor
NSS Construction, Inc. Alice Lloyd, Ann Arbor
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1212 (5) and Rule 1212 (6)
Summary of employer's request for variance
To allow employer to move a scaffold past 110/220 volt insulated service conductors closer than the clearances prescribed in table 1 of Part 12, Scaffolds and Scaffold Platforms proviced certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davenport Masonry, Inc. Zaragon Place 2, Ann Arbor
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
AMN Construction Co. Brick Elementary, Ypsilanti
Brinker Team Interiors Children’s Specialty Center, Detroit Medical Center, Detroit
Northwest Acoustical Inc. West Bloomfield High School, West Bloomfield
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions. The platform shall only be used to install Metal Studs, Drywall and finish drywall provided certain stipulation are adhered to.
Name of employer Location for which variance is requested
Brinker Team Interiors Children’s Pediatric Specialty Center, Detroit Medical Center, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
C. A. Hull Co., Inc. I-94/I-96, Port Huron
Milbocker & Sons, Inc. M-222, Allegan
Dixie Highway at Cass River, Saginaw County
Published: July 26, 2011
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc EMU Mark Jefferson Building, Ypsilanti
Lincoln High School, Ypsilanti
U of M Alice Lloyd Hall, Ann Arbor
Barton Malow Co. Blue Cross-Blue Shield Lyon Meadows Project, New Hudson
McLaren Proton Treatment Center Project – McLaren Hospital, Flint
SeverStal NA – PLTCM Modernization & HDCL Projects, Dearborn
Brinker Team Construction Co Chase Building, Detroit
Clark Park School, Detroit
Gompers School, Detroit
Northwestern High School, Detroit
Turner Brooks Interior Contractors EMU Pray Harrold Renovation Project
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company McLaren Proton Treatment Center Project – McLaren Hospital, Flint
Bouma Corporation Midland Battery Park, Midland
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
C. A. Hull Co., Inc. M-3 Gratiot Ave. over the Clinton River in
Clinton Township, Macomb County
Published: April 15, 2011
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 30 inches, under controlled conditions with stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. Urban Science Office Suites – Renovation Project, Detroit
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc Pray-Harrold Building, Ypsilanti
St. Joe Hospital, Ypsilanti
Barton Malow Co. Oakland University – Renovation Project, Mount Clemens
Beaumont Hospital – Third Floor Obstetrics Project, Troy
Univ. of Michigan – Angell Hall Renovation, Ann Arbor
Brinker Team Construction Co BCBSM River East Center Tower 500, Detroit
Northwest Acoustical Inc. Blue Cross Blue Shield, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
John Darr Mechanical Inc. University of Michigan North Campus Chiller Replacement, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Hardman Construction M-21 over the Grand River, Ada
JH Campbell Plant Intake/Discharge Channel, West Olive
Zenith Tech Inc. US-141 over Menominee River, Dickinson County
Published: January 21, 2011
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: RULE R408.41015; Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Summary of employer's request for variance
To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevated work areas in a manner that exposes employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4) are met under certain stipulations.
Name of employer Location for which variance is requested
Pullman Power Monroe Power Plant, Monroe
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Bouma Interiors Center for Family Health, Jackson
Buist Electric CS Facility Washington Remodel Project, Coopersville
John E. Green Company BPSC Facility, Midland
John E. Green Company Jackson Family Clinic, Jackson
Limbach Company LLC CS Mott Hospital Children’s & Women’s Hospital Shell Space Completion Project, Ann Arbor
Ventcon General Motors Tech Center Research & Development Bldg., Warren
Published: October 29, 2010
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5)
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
American Erectors, Inc. Midland Battery Park, Midland
American Erectors, Inc. Maybury K-8 School, Detroit
American Erectors, Inc. Brightmoor K-8 School, Detroit
American Erectors, Inc. Martin Luther King Jr. High School, Detroit
Brigade Fire Protection, Inc. New Accident Fund Insurance Headquarters, Lansing
Summit Contractors New Accident Fund Insurance Headquarters, Lansing
Published: July 26, 2010
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting & Digging Equipment: R408.41015; Rule 1014a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Summary of employer's request for variance
To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevate work areas in a manner that exposes employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4) are met under certain stipulations.
Name of employer Location for which variance is requested
Hamon Custodis, Inc. Monroe Power Plant, Monroe
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height, under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc. University of Michigan Law Quad, Ann Arbor
Brinker Group Quicken Loans, Detroit
Brinker Group Univ. of Michigan Couzens Hall Renovation, Ann Arbor
Madias Brothers Mott Women’s & Childrens Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Ventcon General Motors Corporation, Pontiac
Published: April 26, 2010
Variances Requested - Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14) and
R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory (See Exhibit A) located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2010 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Co
Territory located in Michigan
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height, under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc. Ann Arbor City Municipal Center
Acoustic Ceiling & Partition Co Inc. Detroit Arsenal, Warren
Barton Malow Company C. S. Mott Women’s & Children’s Hospital, Ann Arbor
Rajala & Sons Finishes Michigan Tech University Student Apartments, Houghton
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company A 123 Systems, Livonia
Ferndale Electric Co Inc. A 123 Systems, Livonia
Published: January 29, 2010
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height, under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. A123 Systems, Livonia
Brinker Team Construction Co. Guardian Building, Detroit
Brinker Team Construction Co. Mott Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Brunt Associates Inc. U of M North Quad Dormitory
Dee Cramer General Motors Corporation, Flint
Limbach Co LLC Dearborn Town Center, Dearborn
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Posen Construction Inc. Bridgeview Bridge, Midland
Published: October 26, 2009
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5)
Summary of employer's request for variance
To allow employer to erect a scaffold closer to 110/220 volt insulated service conductors than the clearances prescribed in table 1, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Owen Ames Kimball Construction St. Mary’s Church, Grand Rapids
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height, under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc. U of M CS Mott Children & Women’s Hosp, Ann Arbor
Acoustic Ceiling & Partition Co Inc. St. Joe Hospital, Ypsilanti
Denn-Co Construction Inc. University of Michigan Stadium, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Ideal Contracting U of M Mott Children’s & Women’s Hospital, Ann Arbor
RAM Construction Services U of M Mott Children’s & Women’s Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Milbocker & Sons Inc. US 131 over Manistee River, Wexford County
Published: July 24, 2009
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 11 – Fixed and Portable Ladders: R408.41132; Rule 1132 (2)
Summary of employer's request for variance
To allow employer to use stepladders as defined in the ANSI A14.5-1982 with the side rails painted with opaque material for identification purposed, provided certain stipulations are adhered tol.
Name of employer Location for which variance is requested
Soule & Co. Hemlock Semiconductor, Hemlock
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
B. R. D. Inc. Huron Valley Sinai Hospital (DMC), Commerce Twp.
Barton Malow Co. Crittenton Karmanos Cancer Center, Rochester
Brinker Team Construction Co. St. Joseph Hospital, Pontiac
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate a Kubota R420 without the Roll Over Protection System (ROPS) in the parking garage to remove concrete forms and transport concrete, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Burgess Concrete Construction Inc. Blodgett Memorial Medical Center, East Grand Rapids
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
R. L. Bondy C. S. Mott Children’s & Women’s Hospital, Ann Arbor
Center Line Electric, Inc. U of M Mott Children’s & Women’s Hospital, Ann Arbor
Dynalectric of Michigan U of M Mott Children’s & Women’s Hospital, Ann Arbor
Andy J. Egan Co., Inc. VanAndel Institute, Grand Rapids
Limbach Co. LLC Argonaut Campus, Detroit
Michigan Mechanical Insulation U of M Women’s & Children’s Hospital, Ann Arbor
Pipe Systems, Inc. BASF JPP Project, Wyandotte
Shaw Electric Co. C. S. Mott Women’s & Children’s Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (29)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Posen Construction Co. Sanford Lake, Sanford
Published: April 15, 2009
Variances Requested - Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115; Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113; Rule 1113 (5) (6) (8) & (14), and
R408.41115; Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2009 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Co, Flint & Saginaw Area
Part number and rule number from which variance is requested
Part 12 – Aerial Work Platforms: R408.41221; Rule 11221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Brinker Team Construction Co. University of Michigan Stadium, Ann Arbor
Jasman Construction, Inc. Zaragon Place, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6), Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, or a self-propelled aerial lift for use as a work platform, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Ann Arbor Ceiling & Partition Co. University of Michigan North Quad Building, Ann Arbor
R. L. Bondy University of Michigan North Quad, Ann Arbor
R. L. Bondy BASF Wyandotte/JPP Project, Wyandotte
Center Line Electric, Inc. BASF Wyandotte, Wyandotte
Conti Electric University of Michigan North Quad, Ann Arbor
Dee Cramer University of MI Women’s & Children Hosp, Ann Arbor
Dependent Insulation Co Inc. University of Michigan North Quad Project, Ann Arbor
John E. Green Co. University of Michigan North Quad, Ann Arbor
Limbach Co., LLC U of M North Quad, Ann Arbor
Mechanical Heat & Frost Insulation U of M North Quad, Ann Arbor
Ventcon, Inc. University of MI Women’s & Children Hosp, Ann Arbor
Ventcon, Inc. University of Michigan North Quad, Ann Arbor
Wolverine Fire Protection Co. C. S. Mott Children’s Hospital, Ann Arbor
Published: January 26, 2009
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate a mini-excavator without the Rollover Protection System (ROPS) to pass through doorways to install electrical conduit provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Buist Electric Alticor Data Center, Grand Rapids
Part number and rule number from which variance is requested
Part 12 – Aerial Work Platforms: R408.41221, Rule 11221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Company Madonna University, Livonia
Brinker Team Construction Co. Beaumont Hospital, Troy
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Superior Electric Great Lakes Co General Motors Technical Center, Warren
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Posen Construction Co. Sanford Lake, Sanford
Published: October 24, 2008
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
B.R.D. Inc. Oakwood Rd., Brandon Twp.
Brinker Team Construction Co. Fort Shelby Hotel, Detroit
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate mobile equipment without the Roll Over Protection System (ROPS) provided stipulations are adhered to.
Name of employer Location for which variance is requested
Homrich Inc. University of Michigan, Stockwell Hall Renovations
Stenco Constructon Co., LLC University of Michigan, Stockwell Hall Renovations
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43205, Rule 3205.1 (a)
Summary of employer's request for variance
To allow employer to operate an vehicle mounted elevating and rotating aerial device without an operators manual.
Name of employer Location for which variance is requested
Walter Toebe Construction Co. Gateway Project, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Milbocker & Sons, Inc. Meridian road over the Tittabawassee River, Midland
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company William Beaumont Hospital, Sterling Heights
R. L. Bondy William Beaumont Hospital, Sterling Heights
Brinker Team Construction Co. Mott Hospital, Ann Arbor
Ferndale Electric William Beaumont Hospital, Troy
John E. Green Co. University of Michigan Mott Childrens & Womens Hospital, Ann Arbor
John E. Green Co. Troy Beaumont Hospital, Sterling Heights
John E. Green Co. Hemlock Semiconductor Plant, Hemlock
Oldcastle Glass Gerald R. Ford Airport, Grand Rapids
SCI/Steelcon Grand Rapids Airport Project, Grand Rapids
SCI/Steelcon Grand Rapids Airport Project, Grand Rapids
Valley Painting, Inc. Gerald R. Ford Airport, Grand Rapids
Western Mechanical Contr., Inc. William Beaumont Hospital EC/CCT, Sterling Heights
Published: July 31, 2008
Variances Requested - Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and
R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2008 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the
International Transmission Company territory located in
The Flint & Saginaw area
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: R408.41021, Rule 1021 (a)
Summary of employer's request for variance
To allow employer to rig certain loads to the load line of the crane above the overhaul weight in accordance with certain stipulations.
Name of employer Location for which variance is requested
W. J. O’Neil Company BASF, Wyandotte
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5) & Rule 1212 (6)
Summary of employer's request for variance
To allow employer to erect a scaffold closer to 110/220 volt insulated service conductors than the clearances prescribed, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davenport Masonry, Inc. Zaragon Place, Ann Arbor
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
B. R. D. Inc. Oakland Technological Schools SW Campus, Wixom
B. R. D. Inc. Oakland Technological Schools NW Campus, Clarkston
Barton Malow Co. William Beaumont Hospital, Sterling Heights
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. William Beaumont Hospital, Sterling Heights
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate mobile equipment without the Roll Over Protection System (ROPS) provided stipulations are adhered to.
Name of employer Location for which variance is requested
Kent Companies, Inc. Waterhouse Apartments, Grand Rapids
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
American Erectors, Inc. United States Postal Service, Pontiac
J. B. Cain Co. St. John Hospital, Detroit
Eugenio Painting Co. GM Powertrain Engineering Consolidation Project, Pontiac
John E. Green Co. William Beaumont Hospital, Sterling Heights
Great Lakes Steel United States Postal Service, Pontiac
International Industrial Contr. Corp. GM Powertrain Engineering Consolidation Project, Pontiac
Limbach Co. LLC Eye Center Expansion and Diabetes, Ann Arbor
W. J. O’Neil Company BASF, Wyandotte
Pipe Systems, Inc. University of MI Eye Center Expansion, Ann Arbor
Sky Electric of Northern MI Bellaire High/Middle School, Bellaire
Ventilation Systems, Inc. St. John Hospital, Detroit
Ventcon William Beaumont Hospital, Troy
Walbridge Aldinger United States Postal Service, Pontiac
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davis Construction Co. M-20 over the Tittabawassee River, Midland
Published: February 29, 2008
Variances Requested - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: R408.41021, Rule 1021 (a)
Summary of employer's request for variance
To allow the employer to rig certain loads to the load line of a crane above the overhaul weight in accordance with certain stipulations.
Name of employer Location for which variance is requested
Wm. Crook Fire Protection Co. Chrysler Trenton Plant, Trenton
W. J. O’Neil Company Chrysler Trenton Plant, Trenton
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer to use stilts, at a maximum height of 24 inches, under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Company St. John Hospital, Detroit
Rajala & Sons Finishes University of Michigan, Flint
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (8) (b), and Rule 3209 (9)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company St. John Hospital, Detroit
Boone & Darr Mechanical General Motors Powertrain Lab Consolidation, Pontiac
Buist Electric 133 E. Michigan Ave., Paw Paw
Michigan Metal Walls, Inc. GM Powertrain Engineering Consolidation Project, Pontiac
Pontiac Ceiling & Partition Co. Henry Ford Hospital, West Bloomfield
Roncelli, Inc. General Motors Powertrain Lab Consolidation, Pontiac
Published: November 27, 2007
Variances Requested: Construction
Part number and rule number from which variance is requested
Part 18 – Fire Prevention & Protection: R408.41851, Rule 1851 (2)
Summary of employer's request for variance
To allow the employer to work in the parking structure without the availability of a fire extinguisher for every 3000 sq. ft., provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Jenkins Skanska Greektown Casino, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (8), Rule 3209 (8) (b), and Rule 3209 (9)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevated work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Applegate Inc. Hard Tech – Bldg., Mason
Coritech Services GM Powertrain Engineering Consolidation Project, Pontiac
Hoyt, Brumm & Link, Inc. General Motors Power Train Facility, Pontiac
MI Mechanical Insulation, Inc. General Motors Powertrain Lab Consolidation, Pontiac
Shambaugh & Son L. P. General Motors Powertrain Lab Consolidation, Pontiac
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (29)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Anlaan Corporation 7th Street over Black River, Port Huron
Milbocker & Sons, Inc. Hagadorn Bridge, East Lansing
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- livingston county catholic charities
- archived construction variances granted michigan
- a brief history of the michigan theater
- osher lifelong learning institute at the university of
- archived construction variances requested
- home agency for health research and quality
- va national center for patient safety home
Related searches
- famous restaurants most requested recipes
- ny times archived crosswords
- 10 most requested recipes
- how to see archived emails gmail
- archived files in windows 10
- how to access archived gmail
- how to retrieve archived email in gmail
- accidentally archived email in gmail
- archived mail windows 10
- how do i find archived emails gmail
- how do i retrieve archived gmail
- how to find archived websites