Archived Construction Variances Granted - Michigan



Published: October 2015

Variances Granted- Construction

Part number and rule number from which variance is requested R408.40115, Rule 115 (4) & (5) and R408.41113, Rule 1113 (5) (6) (8) & (14), and R408.41140, Rule 1140

PART 1 – General Rules, and STANDARD PART 11 – Fixed & Portable Ladders

Summary of employer's request for variance To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2015 painting season.

Name and address of employer Location for which variance is requested

Morris Painting various locations in the Internation Transmission Company territory located in Michigan

Published: October 2014

Variances Granted- Construction

Part number and rule number from which variance is requested Part 13 – Mobile Equipment, Rules 1926.602 & 1926.1000

Summary of employer's request for variance

To allow employer to operate a Komatsu PC27 and John Deere 27D without the Roll Over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided the following stipulations are adhered to:

Name and address of employer Location for which variance is requested

Hardman Construction U of M West Quad Hall, Ann Arbor

Part number and rule number from which variance is requested

Part 1 - General Rules: R408.40115, Rule 115 (4) & (5) and

Part 11 – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and

R408.41140, Rule 1140

Summary of employer's request for variance To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2014 painting season.

Name and address of employer Location for which variance is requested

Morris Painting Inc Various locations in the International Transmission t

Territory located in Michigan

Part number and rule number from which variance is requested Part 13 – Mobile Equipment, 1926.602

Summary of employer's request for variance To allow employer to operate a CAT 304C and 303C without the Roll Over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided the following stipulations are adhered to:

Name and address of employer Location for which variance is requested

Eagle Excavation U of M West Quad Hall, Ann Arbor

Part number and rule number from which variance is requested Part 10 – Lifting and Digging Equipment, R408.41065a(1), R408.41065a(2) and R408.41072a(15)

Summary of employer's request for variance

To allow the use of a temporary personnel hoist systems to transport workers, tools, and materials to and from elevated worksites in a personnel cage during chimney construction work provided employer comply with all the requirements set forth in the OSHA chimney-related permanent variance published in the Federal Register as Number 2013-23625 on October 2, 2013 and all the requirements of Construction Safety Standard, Part 10, Lifting and Digging Equipment except for Rules 1065a (1), 1065a (2) and 1072a (15) which are met as follows:

Name and address of employer Location for which variance is requested

International Chimney Corp DTE Energy, Monroe Power Plant, 3500 Front St, Monroe

Published: July 2014

Variances Granted- Construction

Part number and rule number from which variance is requested 32-Aerial Work Platforms, R408.43216, Rule 3216(3) & Rule 3216(4)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach

Name and address of employer Location for which variance is requested

Conti Fire Protection GM Powertrain Center, Pontiac

Conti Mechanical GM Powertrain Center, Pontiac

Motor City Electric Co GM Powertrain Center Pontiac

Pontiac Ceiling & Partition Co LLC Cobo Hall, Detroit

Rival Insulation LLC Cobo Center Phase II, Detroit

Superior Electric Great Lakes Co GM Proving Grounds, Milford

Published: April 2014

Variances Granted- Construction

Part number and rule number from which variance is requested

32-Aerial Work Platforms, R408.43216, Rule 3216(3) & Rule 3216(4)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach

Name and address of employer Location for which variance is requested

Carrier Construction Co WMU, School of Medicine, Kalamazoo

Conti Corporation Consumers Energy,Karn Weadock Power Plant, Essexville

Motor City Electric Co GM Warren Technical Center Campus, Warren

Published: December 2013

Variances Granted – Construction

Part number and rule number from which variance is requested

Part I – General Rules: R408.40115, Rule 115 (4) & (5) and

Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and

R408.41115, Rule 1115 (8)

Summary of employer's request for variance

To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory (See Exhibit A) located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2010 painting season.

Name and address of employer Location for which variance is requested

MORRIS PAINTING, INC. Various Locations in the

International Transmission Company Territory

Located in Michigan

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41213; Rule 1213 (1)

Summary of employer's request for variance

To allow employer to use a warning line system in addition to the designed guardrail (which does not comply with the requirements of Part 12) of a SafeSpan scaffold under controlled conditions and according to the following stipulations.

Name and address of employer Location for which variance is requested

SEAWAY PAINTING, LLC Mackinac Bridge, Mackinaw City

Part number and rule number from which variance is requested

Part 13 – Mobile Equipment: R1926.602; Rule 1926.1000

Summary of employer's request for variance

To allow employer to operate a CAT 304C and 303C without the Roll over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided certain stipulations are adhered to.

Name and address of employer Location for which variance is requested

EAGLE EXCAVATION U of M south quad Hall Renovation Project, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach due to overhead obstructions

Name and address of employer Location for which variance is requested

BARTON MALOW COMPANY St. Joseph Mercy Oakland Hospital – Campus Regeneration Project, Pontiac

BARTON MALOW COMPANY Crittenton Hospital – Cornerstone South Tower Project, Rochester Hills

BARTON MALOW COMPANY University of Michigan Institute for Social Research

Addition, Ann Arbor

BARTON MALOW COMPANY Consumers Energy D.E. Karn, Essexville

DEE CRAMER U of M South Quad, Ann Arbor

DEE CRAMER Consumers Energy De-Karn Plantm Essexville

DENN-CO CONSTRUCTION INC. Detroit Medical Center Cardiovascular Institute, Detroit

EDWARDS GLASS CO. University of Michigan Institute for Social Research Addition

Ann Arbor

JOHN E. GREEN COMPANY Michigan Automotive Compressor Inc., Parma

LIMBACH COMPANY LLC Western Michigan University School of Medicine, Kalamazoo

SCI/STEELCON WMU Medical School, Kalamazoo

URS CORPORATION DTE Monroe Power Plant FGD and SCR Projects,

Monroe

WESTERN MECHANICAL Cobo Center, Phase II Southside Renovations,

CONTRS, INC. Detroit

WESTERN MECHANICAL St. Joseph Mercy Oakland, South Patient tower &

CONTRS, INC. Regeneration, Pontiac

Published: April 2013

Variances Granted – Construction

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions, with stipulations.

Name of employer Location for which variance is requested

Barton Malow Company Varsity Ann Arbor Project, Ann Arbor

North American Construction Enterprises McKinley Elementary School, Warren

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Hoyt, Brumm & Link Inc. General Motors Power Train Facility, Pontiac

Ventcon, Inc. St. Joseph Mercy Oakland Campus Regeneration Project, Pontiac

Published: October 30, 2012

Variances Granted – Construction

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition, Inc. University of Michigan East Quad, Ann Arbor

Barton Malow Company Chrysler GLBC, Detroit

University of Michigan Crisler Arena Project, Ann Arbor

Ritsema Associates Spectrum Health United Memorial Hospital, Greenville

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Barton Malow Company DTE GO – 9th Floor Auditorium Restoration Project, Detroit

University of Michigan Crisler Arena Project, Ann Arbor

Dee Cramer, Inc. Crittenton Hospital Medical Center, Rochester Hills

John E. Green Company Crittenton Hospital, Rochester Hills

Moote Electrical, Inc. Crittenton Hospital Cornerstone Tower Addition, Rochester

Shaw Electric Company University of Michigan Chrysler Arena Expansion, Ann Arbor

Published: July 27, 2012

Variances Granted– Construction

Part number and rule number from which variance is requested

Part 10 – Lifting & Digging Equipment: Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)

Summary of employer's request for variance

To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevate work areas in a manner that exposed employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)

Name of employer Location for which variance is requested

Pullman Power LLC St. Clair Power Plant, East China Twp.

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41213, Rule 1213 (1)

Summary of employer's request for variance

To allow employer to use a warning line system in addition to the designed guardrail of a SafeSpan scaffold under controlled conditions and according to certain stipulations. The SafeSpan guardrail does not meet the requirements of Part 12.

Name of employer Location for which variance is requested

Seaway Painting, LLC Ambassador Bridge over the Detroit River, Detroit

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition, Inc. Chelsea Community Hospital Addition, Chelsea

Sterling Contracting, Inc. Broderick Tower, Detroit

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Dee Cramer, Inc. Lincoln High School Performing Arts, Ypsilanti

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Davis Construction Lansing Board of Water and Light, Lansing, MI

Milbocker & Sons, Inc. M-223 over the Raisin River, Lenawee County

Published: April 27, 2012

Variances Granted

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition Co. Oakland University Campus, Rochester

Barton Malow Co. BLUnite Project, Detroit

Children’s Specialty Ctr., Detroit Medical Ctr., Detroit

St. Mary Mercy Hospital, Southwest Addition, Livonia

Brinker Team Interiors Finney Crockett High School, Detroit

First National Building, Detroit

Jasman Construction Inc. Greenleaf Trust Building, Birmingham

Ritsema Associates Western Michigan University, Kalamazoo

Turner Brooks Western Michigan University, Kalamazoo

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Conti DMC Pediatric Specialty, Sterling Heights

John E. Green Company Chelsea Hospital Project, Chelsea

Published: February 3, 2012

Construction Variances Granted

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.

Name of employer Location for which variance is requested

Brinker Team Interiors Children’s Specialty Center, Detroit Medical Center, Detroit

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions. The platform shall only be used to install Metal Studs, Drywall and finish drywall, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Brinker Team Interiors Children’s Pediatric Specialty Center, Detroit Medical Center, Detroit

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

C. A. Hull Co., Inc. I-94/I-96, Port Huron

Milbocker & Sons, Inc. M-222, Allegan

Dixie Highway at Cass River, Saginaw County

Published: October 24, 2011

Variances Granted

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions with stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition Co Inc EMU Mark Jefferson Building, Ypsilanti

U of M Alice Lloyd Hall, Ann Arbor

Barton Malow Co. McLaren Proton Treatment Center Project – McLaren Hospital, Flint

Brinker Team Construction Co Chase Building, Detroit

Northwestern High School, Detroit

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

Barton Malow Company McLaren Proton Treatment Center Project – McLaren Hospital, Flint

Bouma Corporation Midland Battery Park, Midland

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

C. A. Hull Co., Inc. M-3 Gratiot Ave. over the Clinton River in

Clinton Township, Macomb County

Published: July 26, 2011

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 30 inches, under controlled conditions with stipulations.

Name of employer Location for which variance is requested

Barton Malow Co. Urban Science Office Suites – Renovation Project, Detroit

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions with stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition Co Inc Pray-Harrold Building, Ypsilanti

St. Joe Hospital, Ypsilanti

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

John Darr Mechanical Inc. University of Michigan North Campus Chiller Replacement, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Hardman Construction M-21 over the Grand River, Ada

Zenith Tech Inc. US-141 over Menominee River, Dickinson County

Published: April 15, 2011

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 10 – Lifting and Digging Equipment: RULE R408.41015; Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)

Summary of employer's request for variance

To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevated work areas in a manner that exposes employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4) are met under certain stipulations.

Name of employer Location for which variance is requested

Pullman Power Monroe Power Plant, Monroe

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

Buist Electric CS Facility Washington Remodel Project, Coopersville

John E. Green Company BPSC Facility, Midland

Limbach Company LLC CS Mott Hospital Children’s & Women’s Hospital Shell Space Completion Project, Ann Arbor

Published: January 21, 2011

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

American Erectors, Inc. Midland Battery Park, Midland

American Erectors, Inc. Maybury K-8 School, Detroit

American Erectors, Inc. Brightmoor K-8 School, Detroit

American Erectors, Inc. Martin Luther King Jr. High School, Detroit

Brigade Fire Protection, Inc. New Accident Fund Insurance Headquarters, Lansing

Summit Contractors New Accident Fund Insurance Headquarters, Lansing

Published: October 29, 2010

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 10 – Lifting and Digging Equipment: RULE R408.41015; Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)

Summary of employer's request for variance

To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevated work areas in a manner that exposes employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4) are met under certain stipulations.

Name of employer Location for which variance is requested

Hamon Custodis, Inc. Monroe Power Plant, Monroe

Part number and rule number from which variance is requested

Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 36 inches under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition Co. Inc. University of Michigan Law Quad, Ann Arbor

Brinker Group Univ. of Michigan Couzens Hall Renovation, Ann Arbor

Madias Brothers Mott Women’s & Children’s Hospital, Ann Arbor

Published: July 26, 2010

Variances Granted - Construction

Part number and rule number from which variance is requested

Part I – General Rules: R408.40115, Rule 115 (4) & (5) and

Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14) and

R408.41115, Rule 1115 (8)

Summary of employer's request for variance

To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory (See Exhibit A) located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2010 painting season.

Name of employer Location for which variance is requested

Morris Painting, Inc. Various Locations in the International Transmission Co

Territory located in Michigan

Part number and rule number from which variance is requested

Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height, under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition Co Inc. Ann Arbor City Municipal Center

Acoustic Ceiling & Partition Co Inc. Detroit Arsenal, Warren

Barton Malow Company C. S. Mott Women’s & Children’s Hospital, Ann Arbor

Rajala & Sons Finishes Michigan Tech University Student Apartments, Houghton

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

Barton Malow Company A 123 Systems, Livonia

Ferndale Electric Co Inc. A 123 Systems, Livonia

Published: April 26, 2010

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Barton Malow Co. A123 Systems, Livonia

Brinker Team Construction Co. Mott Hospital, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

Brunt Associates Inc. U of M North Quad Dormitory

Dee Cramer General Motors Corporation, Flint

Limbach Co LLC Dearborn Town Center, Dearborn

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Posen Construction Inc. Bridgeview Bridge, Harrison Twp.

Published: January 29, 2010

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Acoustic Ceiling & Partition Co. St. Joe hospital, Ypsilanti

Acoustic Ceiling & Partition Co. U of M CS Mott Children & Womens Hospital, Ann Arbor

Denn-Co Construction Inc. University of Michigan Stadium, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

Ideal Contracting Univ. of MI Mott Childrens & Womens Hospital

Ram Construction Services U of M CS Mott Women & Childrens Hospital, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Milbocker & Sons Inc. US 131 over Manistee River, Wexford County

Published: October 26, 2009

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 11 – Fixed and Portable Ladders: R408.41132; Rule 1132 (2)

Summary of employer's request for variance

To allow employer to use stepladders as defined in the ANSI A14.5-1982 with the side rails painted with opaque material for identification purposed, provided certain stipulations are adhered tol.

Name of employer Location for which variance is requested

Soule & Co. Hemlock Semiconductor, Hemlock

Part number and rule number from which variance is requested

Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221

Summary of employer's request for variance

To allow employer to use stilts at a maximum height under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Barton Malow Co. Crittenton Karmanos Cancer Center, Rochester

Brinker Team Construction Co. St. Joseph Hospital, Pontiac

Part number and rule number from which variance is requested

Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000

Summary of employer's request for variance

To allow employer to operate a Kubota R420 without the Roll Over Protection System (ROPS) in the parking garage to remove concrete forms and transport concrete, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Burgess Concrete Construction Inc. Blodgett Memorial Medical Center, East Grand Rapids

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.

Name of employer Location for which variance is requested

R. L. Bondy C. S. Mott Children’s & Women’s Hospital, Ann Arbor

Center Line Electric, Inc. U of M Mott Children’s & Women’s Hospital, Ann Arbor

Dynalectric of Michigan U of M Mott Children’s & Women’s Hospital, Ann Arbor

Michigan Mechanical Insulation U of M Women’s & Children’s Hospital, Ann Arbor

Shaw Electric Co. C. S. Mott Women’s & Children’s Hospital, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Posen Construction Inc. Sanford Lake, Sanford

Published: July 24, 2009

Variances Granted - Construction

Part number and rule number from which variance is requested

Part I – General Rules: R408.40115; Rule 115 (4) & (5) and

Part II – Fixed and Portable Ladders: R408.41113; Rule 1113 (5) (6) (8) & (14), and

R408.41115; Rule 1115 (8)

Summary of employer's request for variance

To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2009 painting season.

Name of employer Location for which variance is requested

Morris Painting, Inc. Various Locations in the International Transmission Co, Flint & Saginaw Area

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Platforms: R408.41221; Rule 11221 (1) (c)

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Brinker Team Construction Co. University of Michigan Stadium, Ann Arbor

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6), Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Ann Arbor Ceiling & Partition Co. University of Michigan North Quad Building, Ann Arbor

R. L. Bondy University of Michigan North Quad Complex, Ann Arbor

R. L. Bondy BASF Wyandotte/JPP Project, Wyandotte

Center Line Electric, Inc. BASF Wyandotte, Wyandotte

Conti Electric University of Michigan North Quad Complex, Ann Arbor

Dee Cramer U of M Women’s & Children Hospital, Ann Arbor

Dependent Insulation Co. Inc. University of Michigan North Quad Project, Ann Arbor

John E. Green Co. University of Michigan North Quad Complex, Ann Arbor

Limbach Co., LLC U of M North Quad, Ann Arbor

Mechanical Heat & Frost Insulation U of M North Quad, Ann Arbor

W. J. O’Neil Co. BASF, Wyandotte

Ventcon, Inc. U of M C.S. Mott Women’s & Children Hosp, Ann Arbor

Ventcon, Inc. University of Michigan North Quad Project, Ann Arbor

Wolverine Fire Protection Co. C. S. Mott Children’s Hospital, Ann Arbor

Published: April 15, 2009

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Superior Electric Great Lakes Co. General Motors Technical Center, Warren

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Posen Construction, Inc. Sanford Lake, Sanford

Published: January 26, 2009

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 12 – Aerial Work Platforms: R408.41221, Rule 1221

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 24 inches, under controlled conditions, and according to certain stipulations.

Name of employer Location for which variance is requested

B. R. D. INC. Oakwood Rd., Brandon Twp.

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43205, Rule 3205.1 (a)

Summary of employer's request for variance

To allow employer to operate a vehicle mounted elevating and rotating aerial device as defined in ANSI Standard A92.2-202 without the manufacturer’s operator manual available for the aerial device used to elevate employees, and catch material during bridge construction provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Walter Toebe Construction Co. Gateway Project, Detroit

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Barton Malow Company William Beaumont Hospital, Sterling Heights

R. L. Bondy William Beaumont Hospital, Sterling Heights

Brinker Team Construction Co. Mott Hospital, Ann Arbor

Ferndale Electric William Beaumont Hospital, Troy

John E. Green Company Troy Beaumont Hospital, Sterling Heights

John E. Green Company University of Michigan Mott Children’s & Women’s Hospital, Ann Arbor

John E. Green Company Hemlock Semiconductor Plant, Hemlock

Western Mechanical Contractors William Beaumont Hospital EC/CCT, Sterling Heights

Published: October 24, 2008

Variances Granted - Construction

Part number and rule number from which variance is requested

Part I – General Rules: R408.40115, Rule 115 (4) & (5) and

Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and

R408.41115, Rule 1115 (8)

Summary of employer's request for variance

To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2008 painting season.

Name of employer Location for which variance is requested

Morris Painting, Inc. Various Locations in the

International Transmission Company territory located in

The Flint & Saginaw area

Part number and rule number from which variance is requested

Part 10 – Lifting and Digging Equipment: R408.41021, Rule 1021 (a)

Summary of employer's request for variance

To allow employer to rig certain loads to the load line of the crane above the overhaul weight in accordance with certain stipulations.

Name of employer Location for which variance is requested

W. J. O’Neil Company BASF, Wyandotte

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5) & Rule 1212 (6)

Summary of employer's request for variance

To allow employer to erect a scaffold closer to 110/220 volt insulated service conductors than the clearances prescribed, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Davenport Masonry, Inc. Zaragon Place, Ann Arbor

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221

Summary of employer's request for variance

To allow employer use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.

Name of employer Location for which variance is requested

Barton Malow Co. William Beaumont Hospital, Sterling Heights

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

J. B. Cain Co. St. John Hospital, Detroit

W. J. O’Neil Company BASF, Wyandotte

Pipe Systems, Inc. University of MI Eye Center Expansion, Ann Arbor

Ventcon William Beaumont Hospital, Troy

Ventilation Systems, Inc. St. John Hospital, Detroit

Published: July 31, 2008

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 10 – Lifting and Digging Equipment: R408.41021, Rule 1021 (a)

Summary of employer's request for variance

To allow employer to rig certain loads to the load line of a crane above the overhaul weight in accordance with certain stipulations.

Name of employer Location for which variance is requested

W. J. O’Neil Company Chrysler – Trenton Plant, Trenton

Part number and rule number from which variance is requested

Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221

Summary of employer's request for variance

To allow employer to use stilts at a maximum height of 24 inches, under controlled conditions, and according to certain stipulations.

Name of employer Location for which variance is requested

Barton Malow Company St. John Hospital, Detroit

Rajala & Sons Finishes University of Michigan, Flint

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6) and Rule 3216 (7)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Barton Malow Company St. John Hospital, Detroit

Michigan Metal Walls, Inc. GM Powertrain Engineering Consolidation Project, Pontiac

Pontiac Ceiling & Partition Co. LLC Henry Ford Hospital, West Bloomfield

Published: February 29, 2008

Variances Granted - Construction

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (8) (b), and Rule 3209 (9)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Michigan Mechanical Insulation General Motors Powertrain Lab Consolidation, Pontiac

Hoyt, Brumm, & Link, Inc. General Motors Power Train Facility, Pontiac

Shambaugh & Son L.P. General Motors Powertrain Lab Consolidation, Pontiac

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (29)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Anlaan Corporation 7th Street over Black River, Port Huron

Published: November 27, 2007

Variances Granted: Construction

Part number and rule number from which variance is requested

Part 1 – General Rules: R408.40115, Rule 115 (4) & (5) and

Part 11 – Fixed & Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14)

Summary of employer's request for variance

To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2007 painting season.

Name of employer Location for which variance is requested

Morris Painting, Inc. Various Locations in the International Transmission Company territory located in Southeastern Michigan

Part number and rule number from which variance is requested

Part 10 – Lifting and Digging Equipment: R408.41025, Rule 1025a (12)

Summary of employer's request for variance

To allow employer to make Multi-Lifts of up to four bundles of re-steel at one time, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Colasanti Specialty Services, Inc. Greektown Expansion Project

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43209, Rule 3209, Rule 3209 (8) (b), Rule 3209 (8) (c), and Rule 3209 (9)

Summary of employer's request for variance

To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevated work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Allied Ventilation, Inc General Motors Powertrain Lab Consolidation, Pontiac

Bristol Steel & Conveyor Corp. 2010 MY Phoenix Engine Program Chrysler-Trenton Plant, Trenton

Conti Electric GM Powertrain Engineering Consolidation Project, Pontiac

De-Cal Mechanical Inc. GM Powertrain Engineering Consolidation Project, Pontiac

Denn-Co Construction, Inc. GM Powertrain One Lab, Pontiac

Denn-Co Construction, Inc. J P Morgan Chase Data Center, Belleville

Dependent Insulation Company, Inc. St. John Hospital, Detroit

Pace Mechanical Services, Inc. General Motors Powertrain Lab Consolidation, Pontiac

Pontiac Ceiling & Partition Co. LLC United States Postal Service NE Metro P&DC, Pontiac

Part number and rule number from which variance is requested

Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (29)

Summary of employer's request for variance

To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.

Name of employer Location for which variance is requested

Milbocker & Sons, Inc. Lincoln Bridge over the Cheboygan River, Cheboygan

................
................