INSS 300 - Personal Web Space Basics



INSS301

Quiz 4

Q1. What is the difference between the design phase and the analysis phase?

 

a. The analysis phase follows the design phase and examines the requirements developed during the design phase

b. The design phase creates the code from the logical requirements developed in the analysis phase

c. Analysis and design belong to the same phase and create an iterative process between the two activities

d. The design phase takes the requirements developed in the analysis phase and creates a design from them

Answer: D

Q2. What is the systems development life cycle?

A) Involves establishing a high-level plan of the intended project and determining project goals

B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system

C) Involves describing the desired features and operations of the system

D) The overall process for developing information systems from planning and analysis through implementation and maintenance

Answer: D

Q3. Which phase takes all of your detailed design documents from the design phase and transforms them into an actual system?

A) Development phase

B) Design phase

C) Analysis phase

D) Testing phase

Answer: A

Q4. Which phase involves end-users and IT specialists working together to gather, understand, and document the business requirements for the proposed system?

A) Analysis phase

B) Design phase

C) Development phase

D) Testing phase

Answer: A

Q5. Which of the following is not a step performed during the prototyping process?

A) Identify basic requirements

B) Develop technical architecture

C) Users reviewing

D) Revise and enhance the prototype

Answer: B

Q 6.What is a sequential, activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?

A) RAD methodology

B) Agile methodology

C) Waterfall methodology

D) Extreme programming

Answer: C

Q 7. If you the end user participated on a team responsible for defining a prototype for a proposed application, what phase in the SDLC would you be working in? 

a. Analysis

b. Design

c. Planning

d. Development

Answer A

 Q 8. US Steel is planning to hire a vendor from Mexico City, they would be using _____ outsourcing. 

a. Offshore

b. Onshore

c. Near shore

d. Exterior

Answer C

Q9. Boeing has just developed a new plane. They allow only a select group of pilots to use the new system so that you could determine if it was working correctly, what type of implementation method would you be following? 

a. Pilot implementation

b. Parallel implementation

c. Plunge implementation

d. Phase implementation

Answer A

Q10. Which of the following occurs when developers and end users add extra features that were not part of the initial requirements? 

a. Scope creep

b Feature creep

c. Milestone

d. Rolling stone

Answer B

Q11.  What end product in the prototyping process becomes the blueprint or technical design for the final system? 

a. RFP

b. RAD

c. Milestones

d. Prototype

Answer D

Q12. What enables publishing content both to intranets and to the public internet sites?

A) Document management system

B) Digital asset management system

C) Web content management system

D) Messaging-based workflow system

Answer: C

Q13. What is the implementation phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals

B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system

C) Involves describing the desired features and operations of the system

D) Involves placing the system into production so users can begin to perform actual business operations with the system

Answer: D

Q14. What is it called when you have a novice and an expert work together on a project to help bring the expert's approach to light?

A) Shadowing

B) Joint problem solving

C) Social networking analysis

D) Digital asset management system

Answer: B

Q 15. John is inventory manager of K-Mart and he needs an inventory management system. He approaches Mary Hall who also works for K-Mart for help. John is involved in

a. Outsourcing

b. Insourcing

c. Netsourcing

d. Selfsourcing

Answer B

Q16. What is the difference between the implementation phase and the maintenance phase? 

a. The implementation phase creates the physical design (code) and tests it; the maintenance phase places it into operations

b. The implementation phase monitors new systems to ensure that they are working properly; the maintenance phase makes minor adjustments when needed to meet existing business goals

c. The maintenance phase monitors new systems to ensure that they are working properly; the implementation phase makes minor adjustments when needed to meet new business goals

d. The maintenance phase monitors and adjusts new and existing systems; the implementation phase places new systems into operation

Answer d

Q17. Mary, owner of coats_r_, wants to update her website to include a shopping cart. Mary is not very program savvy but knows how the website should look. She has hired Lacy Porter, an outside consultant to help her. What development approach would be best suited for this project?

a  SDLC

b. Prototyping

c. JAD

d. Waterfall

Answer b

Q18. Which activity is performed during the implementation phase?

A) Build a help desk

B) Support system changes

C) Build the database and programs

D) None of the above

Answer: D

Q19. Which person leads the SDLC? 

a. End user

b Project manager

c. Programmer

d. IT Administrator

Answer B

Q20..  has designed a new web-based system to replace the current system. They decide to implement the new system while the existing system continued to run, what type of implementation method would you be following? 

a. Pilot implementation

b. Phase implementation

c Parallel implementation

d. Plunge implementation

Answer C

Q 21.. The SDLC contains 7 phases. Which phase builds a technical blueprint of how the proposed system will work? 

a. Design

b. Planning

c. Analysis

d. Development

Answer A

Q22. What is an IT–based set of tools that supports the work of teams by facilitating the sharing and flow of information?

A) Collaboration system

B) Unstructured collaboration

C) Structured collaboration

D) Content management system

Answer: A

Q23. Mr. Lee, A system analyst with General Motors is working with an IT development team to design and create an information system that had fuzzy requirements, what activities should Mr. Lee complete in the requirements phase? 

a. Design the system model

b. Develop the technical architecture

c. Develop a prototype

d. Each of these activities should be completed in this phase

Answer C

Q24. Mary, owner of coats_r_, wants to update her website to include a shopping cart. Mary is not very program savvy but knows how the website should look. She has hired Lacy Porter, an outside consultant to help her. Ms Porter not only included shopping cart but also included Paypal option. What happened? 

a. Scope creep

b. Feature creep

c. Milestone

d. Rolling stone

Answer b

Q25. For a successful e-commerce, 24/7 access is an example of

a. Milestone

b. scope creep

c. feature creep

d. Critical success factors

Answer d

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download