SECTION 104 .us

The Engineer has the option to require further verification of the JMD under 401-2.10 Process Quality Control. If a Test Strip(s) is required, do not produce HMA for production paving and payment before the Engineer provides written approval of the Test Strip construction, construction process, materials, and the JMD, Subsection 401-2.10. ................
................