Municipality of Anchorage DRAINAGE DESIGN GUIDELINES
Municipality of Anchorage
DRAINAGE DESIGN GUIDELINES
Document Number WMP CPg09001
March 2007 ver 4.09
Project Management & Engineering Department
Municipality of Anchorage
DRAINAGE DESIGN CRITERIA REVISION LOG
Drainage Design Guidelines March 2007
Rev. Date No. Executed
Description
Sections Revised or Added
1. 1/26/2007 Removed "DRAFT"; Inserted Section 7 ? Sizing &Designing Storm Water Controls
Section 7
2. 3/2008
Break out discrete sections; added and rearranged appendices
All
3
4/2009
Add WMS Document number and update version number
Title page
4
4/2009
Revise zoning for single lot residential
Page 2-1
5
4/2009
Revise Figure 2-1 for project categorization, but not design requirements
Page 2-2
6
4/2009
Add Table 3-1, showing what design criteria are required for each project type
Page 3-1
7
4/2009
Revise water quality protection criteria to cover single-lot residential if more than 2
dwelling units
Page 3-1
8 4/2009 9 4/2009 10 4/2009 11 4/2009 12 4/2009 13 4/2009 14 4/2009 15 4/2009
16 4/2009
Clarify preliminary and final drainage report requirements Clarify preliminary and final drainage report requirements Clarify reporting requirements Orographic factor to nearest one-hundredth; major drainageway volume 1.77 inch CN for B soils, lawn, flat slopes Corrected Tt equations Design infiltration rate versus field infiltration rate Clarification and renumbering of outline, including requirement to submit computer model input and output electronically Drainage Project Notification Form
Page 4-2 Page 4-4 Page 4-5 Page 6-3 Table 7-1 Page 7-13 Page 9-7 Appendix A
Appendix C
17 4/2009
Drainage Certification - rearranged sections to clarify what is being certified
Appendix C
18 4/2009
Drainage Statement of Compliance ? removed penalty of law clauses and references to those who manage the system
Appendix C
New/*Revised* Template
Municipality of Anchorage
Drainage Design Guidelines March 2007
TABLE OF CONTENTS
Abbreviations and acronyms............................................................................................................v
Glossary ........................................................................................................................................ vii
1 GENERAL PROVISIONS..................................................................................................... 1-1 1.1 Jurisdiction....................................................................................................................... 1-1 1.2 Enforcement Responsibility............................................................................................. 1-1 1.3 Document Revision.......................................................................................................... 1-1 1.4 Using This Document ...................................................................................................... 1-2 1.5 Review and Approval ...................................................................................................... 1-2 1.6 Interpretation.................................................................................................................... 1-2 1.7 Guidelines Limitations..................................................................................................... 1-3 1.8 Relationship to Other Standards, Permits, and Plans....................................................... 1-3 1.9 Design Variances ............................................................................................................. 1-3
2 PROJECT CATEGORIZATION AND DESIGN REQUIREMENTS ............................. 2-1 2.1 Project Category............................................................................................................... 2-1 2.2 Threshold Runoff Rates or Minimum Infiltration Provision ........................................... 2-3 2.3 Receiving Waters ............................................................................................................. 2-3
3 DESIGN CRITERIA AND EXEMPTIONS......................................................................... 3-1 3.1 Conveyance Design ......................................................................................................... 3-1 3.2 Wetland Retention ........................................................................................................... 3-1 3.3 Water Quality Protection ................................................................................................. 3-1 3.4 Extended Detention.......................................................................................................... 3-2 3.5 Flood Hazard Protection .................................................................................................. 3-2 3.6 Project Flood Bypass ....................................................................................................... 3-2 3.7 Downstream Impact Analysis .......................................................................................... 3-3
4 REPORTS AND REVIEW SUBMITTALS ......................................................................... 4-1 4.1 Required Methods and Parameters .................................................................................. 4-1 4.2 Required Submittals......................................................................................................... 4-1 4.2.1 Drainage Project Notification .............................................................................. 4-2 4.2.2 Preliminary Drainage Report ............................................................................... 4-4 4.2.3 Drainage Report ................................................................................................... 4-4 4.3 Project Reporting Requirements ...................................................................................... 4-5 4.3.1 Crossing Project ................................................................................................... 4-5 4.3.2 Single-Lot Residential Project ............................................................................. 4-5 4.3.3 Small Project........................................................................................................ 4-5 4.3.4 Large Project........................................................................................................ 4-6
5 BASIN CHARACTERIZATION .......................................................................................... 5-1 5.1 Required Basin Feature Reporting................................................................................... 5-1 5.2 Information Sources......................................................................................................... 5-1 5.3 Conveyance and Streams ................................................................................................. 5-2
Page i
Municipality of Anchorage
Drainage Design Guidelines March 2009
5.4 Contributing Areas (Drainage Basins)............................................................................. 5-3 5.5 Landcover ........................................................................................................................ 5-4
5.5.1 Pre-Development Landcover ............................................................................... 5-4 5.5.2 Post-Development Landcover.............................................................................. 5-4 5.5.3 Use of Empirical Landcover Coefficients............................................................ 5-4 5.5.4 Required Landcover Characterization ................................................................. 5-4 5.5.5 Landcover Archetypes ......................................................................................... 5-6 5.5.6 Community Management Landcover Adjustments ............................................. 5-8 5.6 Soil ................................................................................................................................... 5-9 5.7 Slope ................................................................................................................................ 5-9 5.8 Surface Roughness......................................................................................................... 5-10 5.9 Basin Mapping Procedures ............................................................................................ 5-10 5.9.1 Base Mapping .................................................................................................... 5-10 5.9.2 Downstream Mapping........................................................................................ 5-11
6 DESIGN STORMS ................................................................................................................. 6-1 6.1 Updated IDF Curves ........................................................................................................ 6-1 6.2 Storm Volume ? Base and Adjusted................................................................................ 6-1 6.3 Storm Duration................................................................................................................. 6-4 6.4 Storm Distribution ........................................................................................................... 6-4 6.5 Storm Frequency.............................................................................................................. 6-5
7 RUNOFF RESPONSE............................................................................................................ 7-1 7.1 Precipitation Losses ......................................................................................................... 7-2 7.1.1 Infiltration and Depression Storage ..................................................................... 7-2 7.1.2 NRCS/SCS Methods............................................................................................ 7-3 7.1.3 Rational Method Runoff Coefficients.................................................................. 7-7 7.1.4 Adjusting for Drainage Connectivity................................................................... 7-9 7.2 Times of Concentration.................................................................................................. 7-10 7.2.1 Overland and Sheet Flow................................................................................... 7-11 7.2.2 Shallow Concentrated Flow............................................................................... 7-12 7.2.3 Channel Flow ..................................................................................................... 7-13 7.3 Lag and Computation Times.......................................................................................... 7-15 7.3.1 Lag Time............................................................................................................ 7-15 7.3.2 Computation Time Interval and Hyetograph Time Step.................................... 7-15 7.4 Estimating Runoff Flows ............................................................................................... 7-16 7.4.1 Rational Method for Peak Flow......................................................................... 7-17 7.4.2 Unit Hydrograph Method................................................................................... 7-17 7.4.3 Kinematic Wave Method (Using Conceptual Methods).................................... 7-18 7.4.4 Time-Area Method (Using Flow Travel Times)................................................ 7-19 7.5 Runoff Models and Programs ........................................................................................ 7-20
8 ROUTING STORM WATER RUNOFF .............................................................................. 8-1 8.1 Routing Analysis Applications and Tools ....................................................................... 8-1 8.2 10% Method Routing Analyses ....................................................................................... 8-2 8.2.1 Considerations for Storage................................................................................... 8-3 8.2.2 Step-Wise Analysis.............................................................................................. 8-3
Page ii
Municipality of Anchorage
Drainage Design Guidelines March 2009
8.3 10% Routing Reporting Requirements ............................................................................ 8-7
9 SIZING AND DESIGNING STORMWATER CONTROLS............................................. 9-1 9.1 Detention Facilities .......................................................................................................... 9-2 9.1.1 Storm Detention Design....................................................................................... 9-2 9.1.2 Extended Detention Design ................................................................................. 9-2 9.2 Infiltration Controls ......................................................................................................... 9-3 9.2.1 Testing Infiltration Capacity ................................................................................ 9-4 9.2.2 Infiltration Control Design................................................................................... 9-6
10 CHANNEL EROSION AND ICING CONTROLS ......................................................... 10-1 10.1 Channel Erosion Control Design ................................................................................. 10-1 10.2 Icing Control Design.................................................................................................... 10-1
11 SELECTED REFERENCES ............................................................................................. 11-1
APPENDICES
Appendix A.................................................................................Drainage Report Contents Outline Appendix B ...................................................................................... Threshold Runoff Calculations Appendix C ................................................................................................................General Forms Appendix D............................................................................Type 1 24-Hour Rainfall Distribution Appendix E .................................................................................................... Example Calculations Appendix F .......................................................................................................Information Sources Appendix G.............................................................................. 10% Method Downstream Analysis
Page iii
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- anchorage alaska ao no 2018 63 s as amended
- chaine des rotisseurs d anchorage 2020 event calendar
- alaska association of municipal clerks 54th annual
- august 20 21 2016 anchorage alaska
- municipality of anchorage drainage design guidelines
- anchorage school district 2019 20 school year activities
- amga august 2019 garden event calendar
- august 28 31 2017 anchorage alaska
- upcoming events highlight tanana river alaska railroad
Related searches
- anchorage calendar of events 2019
- anchorage calendar of events
- types of drainage nursing
- stormwater drainage design examples
- eastern cape municipality vacancies 2019
- local tax municipality pa
- icd 10 incision and drainage of abscess
- find my municipality by address
- high school of art and design nyc
- what municipality is my address nj
- types of medical drainage tubes
- nj municipality lookup by address